Full Text of HB3713 103rd General Assembly
HB3713ham001 103RD GENERAL ASSEMBLY | Rep. Camille Y. Lilly Filed: 3/6/2023
| | 10300HB3713ham001 | | LRB103 29805 RJT 57855 a |
|
| 1 | | AMENDMENT TO HOUSE BILL 3713
| 2 | | AMENDMENT NO. ______. Amend House Bill 3713 by replacing | 3 | | everything after the enacting clause with the following:
| 4 | | "Section 5. The School Code is amended by adding Section | 5 | | 2-3.196 as follows: | 6 | | (105 ILCS 5/2-3.196 new) | 7 | | Sec. 2-3.196. School ventilation. | 8 | | (a) As used in this Section: | 9 | | "Active classroom" means any room currently being used for | 10 | | any duration of in-person
instruction of 4 or more students at | 11 | | a time. | 12 | | "ASHRAE" means the American Society of Heating, | 13 | | Refrigerating and Air-Conditioning
Engineers. | 14 | | "Certified assessor" means: | 15 | | (1) a certified technician; or | 16 | | (2) a person who is certified to perform ventilation |
| | | 10300HB3713ham001 | - 2 - | LRB103 29805 RJT 57855 a |
|
| 1 | | verification assessments of heating,
ventilation and air | 2 | | conditioning systems through a certification body | 3 | | accredited by the American National Standards Institute. | 4 | | "CADR" means clean air delivery rate. | 5 | | "Certified technician" means a person who is certified as | 6 | | a testing and balancing
technician by an accredited | 7 | | organization. | 8 | | "CFM" means cubic feet per minute. | 9 | | "dBa" means decibels. | 10 | | "HEPA" means High Efficiency Particulate Air. | 11 | | "HVAC" means Heating, Ventilation, and Air Conditioning. | 12 | | "Mechanical engineer" means a professional engineer | 13 | | licensed as a mechanical engineer
by the Department of | 14 | | Financial and Professional Regulation who has
professional | 15 | | experience with heating, ventilation, and air conditioning | 16 | | systems. | 17 | | "PM2.5" means particulate matter at 2.5 microns or less. | 18 | | "PM10" means particulate matter at 10 microns or less. | 19 | | "PPM" means parts per million. | 20 | | "UV" means ultraviolet. | 21 | | "Skilled and trained construction workforce" means a | 22 | | workforce in which at least 40% of the workers are graduates of | 23 | | or registered in and attending an apprenticeship program
| 24 | | registered with the workforce solutions department or an | 25 | | apprenticeship program to which the
department has granted | 26 | | reciprocal approval for the applicable construction |
| | | 10300HB3713ham001 | - 3 - | LRB103 29805 RJT 57855 a |
|
| 1 | | occupation. | 2 | | (b) The State Board shall require all school districts to | 3 | | supply all active classroom
instructors, all school staff and | 4 | | administration, and district leadership with an educational | 5 | | document, in a PDF and a physical format, explaining at a | 6 | | minimum the values of good indoor air
quality, including | 7 | | peer-reviewed research demonstrating effects of poor and good
| 8 | | indoor air quality, an explanation of airborne transmission of | 9 | | pathogens and other airborne substances, a basic
explanation | 10 | | of air changes per hour and relation to outdoor air and | 11 | | filtered air, best practice
recommendations for the portable | 12 | | air cleaner and the air quality monitor, including
guidance on | 13 | | theory, function, placement, and operation of the monitor. The | 14 | | document shall be developed with the
assistance of a major | 15 | | independent and nonpartisan approved organization
recognized | 16 | | as a subject matter expert in the field of air quality, such as | 17 | | a local ASHRAE chapter. This document shall be
created and | 18 | | supplied to schools within 3 months of the effective date of | 19 | | this amendatory Act of the 103rd General Assembly. | 20 | | (c) The State Board shall require all school districts to | 21 | | ensure that all active classrooms
that are not mechanically | 22 | | ventilated have at least 2 properly functioning windows, or | 23 | | one
window in situations where only one is present, that can | 24 | | open and can safely stay open. School districts must be in | 25 | | compliance with this Section within 6 months of the effective | 26 | | date of this amendatory Act of the 103rd General Assembly. |
| | | 10300HB3713ham001 | - 4 - | LRB103 29805 RJT 57855 a |
|
| 1 | | (d) The State Board shall require all school districts to | 2 | | ensure that all active classrooms
are equipped with an air | 3 | | quality monitor that: | 4 | | (1) is installed and operating within one month | 5 | | following delivery; | 6 | | (2) remains in the active classroom until classroom is | 7 | | no longer an active classroom; | 8 | | (3) is an air quality monitor that has been determined | 9 | | by the State Board to be suitable, by the State Board | 10 | | seeking out and obtaining a
written statement noting that | 11 | | the capabilities of the monitor in question are
sufficient | 12 | | to serve the purposes described in this Section, from a | 13 | | major independent and
nonpartisan organization recognized | 14 | | as a subject matter expert in the field of air quality, | 15 | | such as a
local ASHRAE chapter. The written statement | 16 | | shall minimally address suitability of: the selected
| 17 | | monitor's measurement technology, calibration | 18 | | specifications, and manufacturer
stated accuracies and | 19 | | ranges; | 20 | | (4) measures, at a minimum, carbon dioxide and PM2.5. | 21 | | Selected monitors are recommended to also measure carbon | 22 | | monoxide,
PM10, volatile organic compounds, temperature, | 23 | | and humidity; | 24 | | (5) displays, at a minimum, carbon dioxide readings | 25 | | through a display on the device or
other means, such as on | 26 | | a computer or cellular phone application; |
| | | 10300HB3713ham001 | - 5 - | LRB103 29805 RJT 57855 a |
|
| 1 | | (6) is corded and does not rely solely on batteries | 2 | | for power; | 3 | | (7) is to be located between 3 and 6 feet above the | 4 | | floor and at least 5 feet away from
doors, operable | 5 | | windows, or human occupants; | 6 | | (8) connects via a wired or wireless connection to | 7 | | other applicable monitors so as to
permit recording of | 8 | | data which includes at least the maximum carbon dioxide
| 9 | | concentrations for a period of at least one year, as well | 10 | | as remote access to current air quality
readings through a | 11 | | computer or cellular phone application; and | 12 | | (9) provides notification through a visual indicator | 13 | | on the monitor, or other alert such
as electronic mail, | 14 | | text message or cellular phone application, when the | 15 | | carbon
dioxide levels in the classroom have exceeded a PPM | 16 | | level recommended
to the State Board in writing by a major | 17 | | independent and nonpartisan organization recognized as a | 18 | | subject matter expert in the field of air quality, such as | 19 | | a local ASHRAE
chapter. | 20 | | Each school shall record all incidents where the | 21 | | recommended PPM level was breached in a
classroom and maintain | 22 | | those records for at least 5 years. | 23 | | Any supplied air quality monitor under this subsection may | 24 | | not be shared between active classrooms. | 25 | | If devices matching the criteria described in this | 26 | | subsection are unavailable, the
State Board shall contact a |
| | | 10300HB3713ham001 | - 6 - | LRB103 29805 RJT 57855 a |
|
| 1 | | major independent and nonpartisan organization
recognized as a | 2 | | subject matter expert in the field of air quality, such as a | 3 | | local ASHRAE chapter, and
request assistance in determining | 4 | | suitable selection criteria for an air quality
monitor that | 5 | | will sufficiently accomplish the goals of: providing teachers | 6 | | and staff
with air quality information to facilitate managing | 7 | | indoor air quality; storing a
sufficient type and duration of | 8 | | data to facilitate ventilation assessments; provide
remote | 9 | | access to current air quality readings; and generally align | 10 | | with
contemporary best practice recommendations. | 11 | | (e) The State Board shall require all school districts to | 12 | | ensure that all active classrooms
are equipped with a portable | 13 | | air cleaner that: | 14 | | (1) is installed and operating within one month | 15 | | following delivery; | 16 | | (2) remains in the active classroom until classroom is | 17 | | no longer an active classroom; | 18 | | (3) is a portable air cleaner the State Board has | 19 | | determined to be suitable, by seeking out and obtaining a
| 20 | | written statement noting that the capabilities of the | 21 | | portable air cleaner in
question are sufficient to serve | 22 | | the purposes described in this Section, from a major
| 23 | | independent and nonpartisan organization recognized as a | 24 | | subject matter
expert in the field of air quality, such as | 25 | | a local ASHRAE chapter; | 26 | | (4) utilizes a HEPA filter that captures 99.97% of 0.3 |
| | | 10300HB3713ham001 | - 7 - | LRB103 29805 RJT 57855 a |
|
| 1 | | micron particles. A filter stated to be equal to or | 2 | | superior to a HEPA may not be used; | 3 | | (5) utilizes or has the option of utilizing a | 4 | | secondary filter for gaseous pollutants,
such as activated | 5 | | carbon; | 6 | | (6) only utilizes HEPA filtration, as opposed to | 7 | | additional technologies such as
ionization, chemical | 8 | | processes, and UV. If such additional technologies are
| 9 | | present in the selected portable air cleaner they must be | 10 | | able to be disabled; | 11 | | (7) Produces 500 or more CFM as measured by CADR or | 12 | | similar metric of filtered airflow; | 13 | | (8) Produces 500 or more CFM of filtered airflow at | 14 | | under 45 dBa of noise, according to manufacturer supplied
| 15 | | dBa test results measured at one meter in front of the | 16 | | portable air cleaner; | 17 | | (9) is Underwriters Laboratories certified or | 18 | | certified to Underwriters Laboratories standards; | 19 | | (10) has a manufacturer's warranty of at least one | 20 | | year; | 21 | | (11) shall be continuously operated during room | 22 | | occupancy on at least low speed; | 23 | | (12) shall be maintained according to manufacturer's | 24 | | recommendation, written approval shall be
obtained from | 25 | | the manufacturer if deviation from standard | 26 | | recommendations is
being considered; and |
| | | 10300HB3713ham001 | - 8 - | LRB103 29805 RJT 57855 a |
|
| 1 | | (13) shall be replaced within one month if it becomes | 2 | | inoperable. | 3 | | If a single
portable air cleaner on the market does not | 4 | | meet the parameters of this subsection, then 2 or
more | 5 | | portable air cleaners per active classroom may be substituted | 6 | | if they produce
a combined 500 or more CFM, as measured by CADR | 7 | | or similar metric, of filtered airflow at under 45 combined | 8 | | dBa of
noise according to manufacturer supplied dBa test | 9 | | results measured at one meter in
front of the portable air | 10 | | cleaner. | 11 | | Any supplied portable air cleaner may not be shared | 12 | | between active classrooms. | 13 | | (f) The State Board shall require all school districts to | 14 | | supply each school with 5
additional portable air cleaners and | 15 | | 5 additional air quality monitors that meet the requirements | 16 | | of subsections (d) and (e) to be used in school health offices, | 17 | | libraries, cafeterias, and other similar spaces. | 18 | | (g) The State Board shall require all school districts to | 19 | | undertake a ventilation verification
assessment of all | 20 | | mechanical ventilation systems in the school district | 21 | | performed by a certified
assessor or a mechanical engineer and | 22 | | shall be based on physical measurements made during the
| 23 | | assessment. If an assessment is performed by a certified | 24 | | assessor, the assessment report shall be
reviewed by a | 25 | | mechanical engineer. The ventilation verification assessment | 26 | | shall verify whether
the existing mechanical ventilation |
| | | 10300HB3713ham001 | - 9 - | LRB103 29805 RJT 57855 a |
|
| 1 | | system is operating in accordance with design parameters and
| 2 | | meets the requirements of any applicable building codes. The | 3 | | ventilation verification assessment
for a heating, ventilation | 4 | | and air conditioning system shall include: | 5 | | (1) testing for maximum filter efficiency; | 6 | | (2) measurements of outside air rate; | 7 | | (3) verification of operation of ventilation | 8 | | components; | 9 | | (4) measurement of all air distribution inlets and | 10 | | outlets; | 11 | | (5) verification of unit operation and that required | 12 | | maintenance has been performed; | 13 | | (6) verification of control sequences; | 14 | | (7) verification or installation of carbon dioxide | 15 | | sensors; and | 16 | | (8) collection of field data for the installation of | 17 | | mechanical ventilation if none exists. | 18 | | (h) The verification assessment report from the mechanical | 19 | | engineer shall include
appropriate corrective actions needed | 20 | | for the mechanical ventilation system or the heating,
| 21 | | ventilation and air conditioning infrastructure, including | 22 | | installation of appropriate filters,
installation of carbon | 23 | | dioxide sensors and additional maintenance, repairs, upgrades | 24 | | or
replacement. | 25 | | (i) The school district shall have a ventilation | 26 | | verification assessment performed on all
mechanical |
| | | 10300HB3713ham001 | - 10 - | LRB103 29805 RJT 57855 a |
|
| 1 | | ventilation systems in the school district at least every 5 | 2 | | years. The ventilation
verification assessment and the | 3 | | ventilation verification reports are public documents and | 4 | | shall be
available to the public upon request. | 5 | | (j) Each school's first ventilation verification | 6 | | assessment shall occur between one and 6
months after the | 7 | | school's air quality monitors have been installed and data has | 8 | | started recording,
and all measurements for this assessment, | 9 | | and all following, shall be made in the same
conditions in | 10 | | which the building typically operates. The assessment plan
| 11 | | shall be developed with the assistance and approval of a major | 12 | | independent and
nonpartisan major organization recognized as a | 13 | | subject matter expert in the field of air quality, such as a | 14 | | local ASHRAE
chapter, to ensure that the assessment results | 15 | | are representative of indoor air quality conditions
| 16 | | experienced during normal occupancy. ".
|
|