Illinois General Assembly

  Bills & Resolutions  
  Compiled Statutes  
  Public Acts  
  Legislative Reports  
  IL Constitution  
  Legislative Guide  
  Legislative Glossary  

 Search By Number
 (example: HB0001)
Search Tips

Search By Keyword

Illinois Compiled Statutes

 ILCS Listing   Public Acts  Search   Guide   Disclaimer

Information maintained by the Legislative Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.

Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.

220 ILCS 5/9-213

    (220 ILCS 5/9-213) (from Ch. 111 2/3, par. 9-213)
    Sec. 9-213. The cost of new electric utility generating plants and significant additions to electric utility generating plants shall not be included in the rate base of any utility unless such cost is reasonable. Prior to including the cost of plants or additions to utility plants in the rate base, the Commission shall conduct an audit of such costs in order to ascertain whether the cost associated with the new generating plant or the addition to electric utility generating plant is reasonable. However, the Commission may, for good cause shown in individual cases, waive the auditing requirement for any generating facility which meets all of the following requirements:
        (1) the facility is wholly owned and operated by a
    
public utility, as otherwise defined in this Act, which serves less than 20,000 electric customers within the State of Illinois, and
        (2) the facility is designed to generate less than 50
    
megawatts of electricity, and
        (3) the facility is located outside of the State of
    
Illinois.
    If the Commission is unable to conduct such an audit, the Commission shall arrange for it to be conducted by persons independent of the utility and selected by the Commission. The cost of such an independent audit shall be borne initially by the utility, but shall be recovered as an expense through normal ratemaking procedures. Any such audits shall be conducted in accordance with generally accepted auditing standards and shall include but not be limited to costs associated with materials, labor, equipment, professional services and other direct and indirect costs.
    "Significant additions to the electric utility generating plant", as used in this Section, shall not include a public utility's investment in pollution control devices for the control of sulfur dioxide emissions. Nothing in this Section is intended to affect the provisions of Section 9-214 of this Act.
    "Reasonable", as used in this Section, means that a utility's decisions, construction, and supervision of construction, underlying the costs of new electric utility generating plants and significant additions to electric utility generating plants resulted in efficient, economical and timely construction. In determining the reasonableness of plant costs, the Commission shall consider the knowledge and circumstances prevailing at the time of each relevant utility decision or action.
    Nothing in this Section shall prevent or limit the Commission from either entering into and conducting joint audits concerning such electric generating plants with the regulatory authority of another state, or from relying on audits conducted by the regulatory authority of another state in lieu of an audit as required by this Section.
(Source: P.A. 87-435.)