Illinois General Assembly

  Bills & Resolutions  
  Compiled Statutes  
  Public Acts  
  Legislative Reports  
  IL Constitution  
  Legislative Guide  
  Legislative Glossary  

 Search By Number
 (example: HB0001)
Search Tips

Search By Keyword

Illinois Compiled Statutes

 ILCS Listing   Public Acts  Search   Guide   Disclaimer

Information maintained by the Legislative Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.

Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.

415 ILCS 5/57.19

    (415 ILCS 5/57.19)
    Sec. 57.19. Costs incurred after the issuance of a No Further Remediation Letter. The following shall be considered corrective action activities eligible for payment from the Fund even when an owner or operator conducts these activities after the issuance of a No Further Remediation Letter. Corrective action conducted under this Section and costs incurred under this Section must comply with the requirements of this Title and Board rules adopted under this Title.
        (1) Corrective action to achieve residential property
    
remediation objectives if the owner or operator demonstrates that property remediated to industrial/commercial property remediation objectives pursuant to subdivision (c)(3)(A)(ii) of Section 57.7 of this Act is being developed into residential property.
        (2) Corrective action to address groundwater
    
contamination if the owner or operator demonstrates that action is necessary because a groundwater ordinance used as an institutional control pursuant to subdivision (c)(3)(A)(iii) of Section 57.7 of this Act can no longer be used as an institutional control.
        (3) Corrective action to address groundwater
    
contamination if the owner or operator demonstrates that action is necessary because an on-site groundwater use restriction used as an institutional control pursuant to subdivision (c)(3)(A)(iv) of Section 57.7 of this Act must be lifted in order to allow the installation of a potable water supply well due to public water supply service no longer being available for reasons other than an act or omission of the owner or operator.
        (4) The disposal of soil that does not exceed
    
industrial/commercial property remediation objectives, but that does exceed residential property remediation objectives, if industrial/commercial property remediation objectives were used pursuant to subdivision (c)(3)(A)(ii) of Section 57.7 of this Act and the owner or operator demonstrates that (i) the contamination is the result of the release for which the owner or operator is eligible to seek payment from the Fund and (ii) disposal of the soil is necessary as a result of construction activities conducted after the issuance of a No Further Remediation Letter on the site where the release occurred, including, but not limited to, the following: tank, line, or canopy repair, replacement, or removal; building upgrades; sign installation; and water or sewer line replacement.
        (5) The disposal of water exceeding groundwater
    
remediation objectives that is removed from an excavation on the site where the release occurred if a groundwater ordinance is used as an institutional control pursuant to subdivision (c)(3)(A)(iii) of Section 57.7 of this Act, or if an on-site groundwater use restriction is used as an institutional control pursuant to subdivision (c)(3)(A)(iv) of Section 57.7, and the owner or operator demonstrates that (i) the excavation is located within the measured or modeled extent of groundwater contamination resulting from the release for which the owner or operator is eligible to seek payment from the Fund and (ii) disposal of the groundwater is necessary as a result of construction activities conducted after the issuance of a No Further Remediation Letter on the site where the release occurred, including, but not limited to, the following: tank, line, or canopy repair, replacement, or removal; building upgrades; sign installation; and water or sewer line replacement.
(Source: P.A. 96-908, eff. 6-8-10.)