Illinois General Assembly

  Bills & Resolutions  
  Compiled Statutes  
  Public Acts  
  Legislative Reports  
  IL Constitution  
  Legislative Guide  
  Legislative Glossary  

 Search By Number
 (example: HB0001)
Search Tips

Search By Keyword

Illinois Compiled Statutes

 ILCS Listing   Public Acts  Search   Guide   Disclaimer

Information maintained by the Legislative Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.

Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.

220 ILCS 5/3-125

    (220 ILCS 5/3-125)
    Sec. 3-125. Final capitalized plant cost. "Final capitalized plant cost" means the total capitalized asset cost of the plant of the clean coal SNG facility as reflected on the balance sheet of the facility at the time of the commercial production date, with such capitalized cost to be accrued in accordance with generally accepted accounting principles, and includes, without limitation, the following items: major equipment, the SNG pipeline from the plant to the receiving pipeline, water lines, railroad improvements, access road improvements, all coal transportation assets, including the slurry line, slurry prep plant, carbon dioxide capture metering and compression, licensing fees, all costs incurred in the management planning, oversight and execution of the construction and start-up of the plant, and all fees and costs payable under engineering, procurement, and design contracts for the construct of the plant accrued as of the time of the commercial production date, but does not include capitalized financing costs including capitalized interest during construction and all fees associated with financing, coal reserve leasing costs, marketing, training, any and all costs payable under the contract miner agreement, the cost of coal mining equipment and similar costs, and any other costs, including general and administrative costs, not reasonably incurred in connection with the design, construction, testing, start-up, or commissioning of the plant in preparation for commercial production date.
(Source: P.A. 97-239, eff. 8-2-11.)