(30 ILCS 537/35)
    (Section scheduled to be repealed on January 1, 2026)
    Sec. 35. Small projects. In any case where the total overall cost of the project is estimated to be less than $10 million, the State construction agency may combine the two-phase procedure for selection described in Section 30 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 30.
(Source: P.A. 94-716, eff. 12-13-05.)