Illinois General Assembly - Full Text of HB1694
Illinois General Assembly

Previous General Assemblies

Full Text of HB1694  98th General Assembly

HB1694enr 98TH GENERAL ASSEMBLY

  
  
  

 


 
HB1694 EnrolledLRB098 05746 HEP 35785 b

1    AN ACT concerning civil law.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 5. The Eminent Domain Act is amended by adding
5Section 25-5-45 as follows:
 
6    (735 ILCS 30/25-5-45 new)
7    Sec. 25-5-45. Quick-take; McHenry County. Quick-take
8proceedings under Article 20 may be used for a period of no
9longer than one year from the effective date of this amendatory
10Act of the 98th General Assembly by McHenry County for the
11acquisition of the following described property for the purpose
12of public improvements to serve McHenry County:
 
13Route: F.A.U. 168 (Johnsburg Road)
14Section: 05-00314-00-WR
15County: McHenry Job No.: R-91-005-06
16Parcel: 1HK0045
17Sta. 58+07.09 To Sta. 58+31.89
18Sta. 176+10.72 To Sta. 177+36.15
19Owner: JNL-Johnsburg Properties, Inc.
20Index No. 09-13-277-001
2109-13-277-002
 

 

 

HB1694 Enrolled- 2 -LRB098 05746 HEP 35785 b

1That part of Sub Lot 2 of Lot 28 in Plat Number 3 McHenry,
2County Clerk's Plat of Section 13, Township 45 North, Range 8
3East of the Third Principal Meridian, according to the plat
4thereof recorded May 6, 1902 as document number 14079, in
5McHenry County, Illinois, described as follows:
 
6Commencing at the southeast corner of the Northeast Quarter of
7said Section 13; thence on an assumed bearing of South 89
8degrees 15 minutes 13 seconds West along the south line of the
9Northeast Quarter of said Section 13, as monumented and
10occupied, a distance of 824.94 feet (825.2 feet, recorded)
11(826.0 feet, recorded) to a point of intersection with the
12Southerly extension of the east line of the grantor; thence
13North 1 degree 20 minutes 53 seconds East along the said
14Southerly extension of the east line of the grantor, a distance
15of 132.49 feet to the northeasterly right of way line of Chapel
16Hill Road recorded January 26, 1932 as document number 100422,
17being also the southeast corner of the grantor; thence North 46
18degrees 56 minutes 58 seconds West along the said northeasterly
19right of way line of Chapel Hill Road and along the
20northeasterly right of way line of Chapel Hill Road recorded
21January 26, 1932 as document number 100421, a distance of
22261.08 feet to the point of beginning; thence continuing North
2346 degrees 56 minutes 58 seconds West along the northeasterly
24right of way line of Chapel Hill Road recorded as document
25number 100421, a distance of 14.94 feet to the east right of

 

 

HB1694 Enrolled- 3 -LRB098 05746 HEP 35785 b

1way line of Chapel Hill Road recorded January 26, 1932 as
2document number 100420; thence North 2 degrees 09 minutes 50
3seconds East along the said east right of way line of Chapel
4Hill Road and the Northerly extension thereof, a distance of
564.92 feet (64.91 feet, more or less, recorded) to the center
6line of Johnsburg Road; thence North 87 degrees 42 minutes 53
7seconds East along the said center line of Johnsburg Road, a
8distance of 123.08 feet; thence South 2 degrees 17 minutes 07
9seconds East, a distance of 30.00 feet to the south right of
10way line of Johnsburg Road according to a Plat of Survey by the
11County Surveyor dated October 21, 1952 in Surveyor Book Number
125, page 204; thence South 2 degrees 48 minutes 02 seconds East,
13a distance of 1.05 feet; thence westerly 59.83 feet along a
14curve to the left having a radius of 987.47 feet, the chord of
15said curve bears South 85 degrees 27 minutes 49 seconds West,
1659.82 feet; thence South 70 degrees 14 minutes 11 seconds West,
17a distance of 47.08 feet; thence South 22 degrees 40 minutes 19
18seconds West, a distance of 30.69 feet to the point of
19beginning.
 
20Said parcel containing 0.117 acre, more or less, of which 0.086
21acre, more or less, was previously dedicated or used for
22highway purposes.
 
23    Section 99. Effective date. This Act takes effect upon
24becoming law.