Illinois General Assembly - Full Text of SB3031
Illinois General Assembly

Previous General Assemblies

Full Text of SB3031  100th General Assembly

SB3031enr 100TH GENERAL ASSEMBLY

  
  
  

 


 
SB3031 EnrolledLRB100 15913 HLH 31028 b

1    AN ACT concerning State government.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    (20 ILCS 3105/10.09-5 rep.)
5    Section 5. The Capital Development Board Act is amended by
6repealing Section 10.09-5.
 
7    Section 10. The Energy Efficient Building Act is amended by
8changing Section 20 as follows:
 
9    (20 ILCS 3125/20)
10    Sec. 20. Applicability.
11    (a) The Board shall review and adopt the Code within one
12year after its publication. The Code shall take effect within 6
13months after it is adopted by the Board, except that, beginning
14January 1, 2012, the Code adopted in 2012 shall take effect on
15January 1, 2013. Except as otherwise provided in this Act, the
16Code and shall apply to (i) any new building or structure in
17this State for which a building permit application is received
18by a municipality or county and (ii) beginning on the effective
19date of this amendatory Act of the 100th General Assembly, each
20State facility specified in Section 4.01 of the Capital
21Development Board Act , except as otherwise provided by this
22Act. In the case of any addition, alteration, renovation, or

 

 

SB3031 Enrolled- 2 -LRB100 15913 HLH 31028 b

1repair to an existing commercial structure, the Code adopted
2under this Act applies only to the portions of that structure
3that are being added, altered, renovated, or repaired. The
4changes made to this Section by this amendatory Act of the 97th
5General Assembly shall in no way invalidate or otherwise affect
6contracts entered into on or before the effective date of this
7amendatory Act of the 97th General Assembly.
8    (b) The following buildings shall be exempt from the Code:
9        (1) Buildings otherwise exempt from the provisions of a
10    locally adopted building code and buildings that do not
11    contain a conditioned space.
12        (2) Buildings that do not use either electricity or
13    fossil fuel for comfort conditioning. For purposes of
14    determining whether this exemption applies, a building
15    will be presumed to be heated by electricity, even in the
16    absence of equipment used for electric comfort heating,
17    whenever the building is provided with electrical service
18    in excess of 100 amps, unless the code enforcement official
19    determines that this electrical service is necessary for
20    purposes other than providing electric comfort heating.
21        (3) Historic buildings. This exemption shall apply to
22    those buildings that are listed on the National Register of
23    Historic Places or the Illinois Register of Historic
24    Places, and to those buildings that have been designated as
25    historically significant by a local governing body that is
26    authorized to make such designations.

 

 

SB3031 Enrolled- 3 -LRB100 15913 HLH 31028 b

1        (4) (Blank).
2        (5) Other buildings specified as exempt by the
3    International Energy Conservation Code.
4    (c) Additions, alterations, renovations, or repairs to an
5existing building, building system, or portion thereof shall
6conform to the provisions of the Code as they relate to new
7construction without requiring the unaltered portion of the
8existing building or building system to comply with the Code.
9The following need not comply with the Code, provided that the
10energy use of the building is not increased: (i) storm windows
11installed over existing fenestration, (ii) glass-only
12replacements in an existing sash and frame, (iii) existing
13ceiling, wall, or floor cavities exposed during construction,
14provided that these cavities are filled with insulation, and
15(iv) construction where the existing roof, wall, or floor is
16not exposed.
17    (d) A unit of local government that does not regulate
18energy efficient building standards is not required to adopt,
19enforce, or administer the Code; however, any energy efficient
20building standards adopted by a unit of local government must
21comply with this Act. If a unit of local government does not
22regulate energy efficient building standards, any
23construction, renovation, or addition to buildings or
24structures is subject to the provisions contained in this Act.
25(Source: P.A. 96-778, eff. 8-28-09; 97-1033, eff. 8-17-12.)
 

 

 

SB3031 Enrolled- 4 -LRB100 15913 HLH 31028 b

1    Section 15. The Green Buildings Act is amended by changing
2Sections 10 and 15 as follows:
 
3    (20 ILCS 3130/10)
4    Sec. 10. Definitions. In this Act:
5    "Board" means the Capital Development Board.
6    "Comfort conditioned building" means a normally occupied
7building that is heated or cooled.
8    "USGBC" means the United States Green Building Council.
9    "LEED" means the USGBC Leadership in Energy and
10Environmental Design green building rating standard.
11    "GBI" means The Green Building Initiative.
12    "Green Globes" means the GBI green building construction
13model.
14    "Major renovation" means a project with a construction
15budget that equals 40% or more of the building's current
16replacement cost.
17(Source: P.A. 96-73, eff. 7-24-09.)
 
18    (20 ILCS 3130/15)
19    Sec. 15. Green Buildings Standards.
20    (a) All new State-funded building construction and major
21renovations of existing State-owned facilities must be
22designed to achieve, at a minimum, the silver certification of
23the Leadership in Energy and Environmental Design's rating
24system, as established by the United States Green Building

 

 

SB3031 Enrolled- 5 -LRB100 15913 HLH 31028 b

1Council, or an equivalent standard, including, but not limited
2to, a two-globe rating in the Green Globes USA design program.
3New buildings and major renovations of 10,000 contiguous square
4feet or more must obtain a USGBC LEED, GBI Green Globes, or
5equivalent certification are required to seek LEED, Green
6Globes, or equivalent certification.
7    (b) (Blank). All construction and major renovation
8projects, regardless of size, must achieve the highest level of
9certification practical within the project budget.
10        (1) New buildings and major renovations of less than
11    10,000 square feet must meet the highest standard of the
12    Leadership in Energy and Environmental Design's rating
13    system for new commercial construction and major
14    renovation projects, as established by the United States
15    Green Building Council, or an equivalent standard,
16    including, but not limited to, the Green Building
17    Initiative's Green Globes USA design program. USGBC LEED,
18    GBI Green Globes, or the equivalent certification is not
19    required.
20        (2) New buildings and major renovations of 10,000
21    square feet or more must achieve the silver building rating
22    of the Leadership in Energy and Environmental Design's
23    rating system for new commercial construction and major
24    renovation projects, as established by the United States
25    Green Building Council, or an equivalent standard,
26    including, but not limited to, a two-globe rating in the

 

 

SB3031 Enrolled- 6 -LRB100 15913 HLH 31028 b

1    Green Globes USA design program. USGBC LEED, GBI Green
2    Globes, or the equivalent certification is required.
3    (c) Exemptions to these standards are buildings that are
4not "comfort" conditioned buildings, as determined by the
5Board. However, the project design team must document and
6incorporate all appropriate sustainable building methods,
7strategies, and technologies in the final design.
8    (d) State agencies and the project design team may apply to
9the Board for a waiver from these standards.
10    (e) Waivers shall be granted by the Board or an appropriate
11agency when the applicant can demonstrate and document any of
12the following:
13        (1) An unreasonable financial burden, taking into
14    account the operating and construction costs over the life
15    of the building and the total cost of ownership of the
16    building.
17        (2) An unreasonable impediment to construction.
18        (3) The standards would impair the principal function
19    of the building.
20        (4) The standards would compromise the historic nature
21    of the structure.
22    Documentation on the submittal must include at a minimum:
23        (1) Life cycle cost analysis.
24        (2) Energy modeling.
25    The design team must provide the documentation for the new
26project to confirm that LEED, Green Globes, or the equivalent

 

 

SB3031 Enrolled- 7 -LRB100 15913 HLH 31028 b

1construction standards have been followed.
2    (f) (Blank). In addition to any required LEED, Green
3Globes, or the equivalent criteria, the Board shall require
4that all projects referenced in subsection (a) implement at
5least one LEED alternative transportation criterion for public
6transportation or bicycle access.
7    (g) (Blank). The green building standards contained in this
8Act shall be analyzed and evaluated by the Board 5 years after
9the effective date of this Act or upon the completion of 10
10Board green projects, whichever comes first.
11(Source: P.A. 96-73, eff. 7-24-09.)
 
12    Section 99. Effective date. This Act takes effect upon
13becoming law.