Full Text of SR1172 98th General Assembly
SR1172 98TH GENERAL ASSEMBLY |
| | SR1172 | | LRB098 21129 GRL 58960 r |
|
| 1 | | SENATE RESOLUTION
| 2 | | WHEREAS, Metra's Western Avenue Crossing, known as A-2, | 3 | | located 2 miles west of the Loop at Western Avenue and Kinzie | 4 | | Street, is where Union Pacific-owned tracks from the Ogilvie | 5 | | Transportation Center headed west cross over Metra-owned | 6 | | tracks from Union Station headed northwest; and
| 7 | | WHEREAS, A-2 impacts 7 of Metra's 11 routes, as the Union | 8 | | Pacific West, the Milwaukee District West, the Milwaukee North, | 9 | | and North Central travel over A-2, while the empty trains for | 10 | | the Union Pacific North, Union Pacific Northwest, Southwest | 11 | | Service, and Heritage Corridor trains need to travel over A-2 | 12 | | to access their maintenance shops for service; and
| 13 | | WHEREAS, 350 trains cross paths at A-2 every day and rely | 14 | | on A-2 working smoothly for on-time performance; and
| 15 | | WHEREAS, A-2 was designed and built in the 1930s with | 16 | | interlocking switching equipment powered by air compression | 17 | | for the 3,000 switches which are now functionally obsolete; and
| 18 | | WHEREAS, Cold weather is particularly damaging to the | 19 | | functionality of the A-2 air compression switching system, as | 20 | | the switches freeze and ice falls from trains and locks | 21 | | switches in place, halting the ability of trains to move |
| | | SR1172 | - 2 - | LRB098 21129 GRL 58960 r |
|
| 1 | | through the crossing; and | 2 | | WHEREAS, Many of Metra's winter weather delays this year | 3 | | are attributable to A-2; and | 4 | | WHEREAS, A-2 is like 2 interstate highways meeting at a | 5 | | stoplight, as trains headed in one direction must wait for | 6 | | trains to pass through headed in the other direction, which is | 7 | | inherently inefficient; and | 8 | | WHEREAS, The best way to solve the A-2 crossing problem is | 9 | | a flyover bridge to permanently separate the tracks, similar to | 10 | | the Chicago Transit Authority's plan recently released to build | 11 | | a flyover bridge permanently separating the Brown Line tracks | 12 | | from the Red and Purple Line tracks north of Belmont; and | 13 | | WHEREAS, Other options include updating the 1930s era | 14 | | switching equipment to modern standards or moving the crossing | 15 | | a mile east; therefore, be it
| 16 | | RESOLVED, BY THE SENATE OF THE NINETY-EIGHTH GENERAL | 17 | | ASSEMBLY OF THE STATE OF ILLINOIS, that we recognize the A-2 | 18 | | crossing as a major bottleneck for passenger rail service, both | 19 | | for Metra and for Amtrak; and be it further
| 20 | | RESOLVED, That we show our support for federal, State, and |
| | | SR1172 | - 3 - | LRB098 21129 GRL 58960 r |
|
| 1 | | any private investments to eliminate the delays in the A-2 | 2 | | crossing and provide better Metra and Amtrak service for the | 3 | | residents of Illinois.
|
|