Illinois General Assembly - Full Text of HB1458
Illinois General Assembly

Previous General Assemblies

Full Text of HB1458  97th General Assembly

HB1458enr 97TH GENERAL ASSEMBLY

  
  
  

 


 
HB1458 EnrolledLRB097 05385 PJG 45442 b

1    AN ACT concerning State government.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 5. The Illinois Power Agency Act is amended by
5changing Section 1-10 as follows:
 
6    (20 ILCS 3855/1-10)
7    Sec. 1-10. Definitions.
8    "Agency" means the Illinois Power Agency.
9    "Agency loan agreement" means any agreement pursuant to
10which the Illinois Finance Authority agrees to loan the
11proceeds of revenue bonds issued with respect to a project to
12the Agency upon terms providing for loan repayment installments
13at least sufficient to pay when due all principal of, interest
14and premium, if any, on those revenue bonds, and providing for
15maintenance, insurance, and other matters in respect of the
16project.
17    "Authority" means the Illinois Finance Authority.
18    "Clean coal facility" means an electric generating
19facility that uses primarily coal as a feedstock and that
20captures and sequesters carbon emissions at the following
21levels: at least 50% of the total carbon emissions that the
22facility would otherwise emit if, at the time construction
23commences, the facility is scheduled to commence operation

 

 

HB1458 Enrolled- 2 -LRB097 05385 PJG 45442 b

1before 2016, at least 70% of the total carbon emissions that
2the facility would otherwise emit if, at the time construction
3commences, the facility is scheduled to commence operation
4during 2016 or 2017, and at least 90% of the total carbon
5emissions that the facility would otherwise emit if, at the
6time construction commences, the facility is scheduled to
7commence operation after 2017. The power block of the clean
8coal facility shall not exceed allowable emission rates for
9sulfur dioxide, nitrogen oxides, carbon monoxide, particulates
10and mercury for a natural gas-fired combined-cycle facility the
11same size as and in the same location as the clean coal
12facility at the time the clean coal facility obtains an
13approved air permit. All coal used by a clean coal facility
14shall have high volatile bituminous rank and greater than 1.7
15pounds of sulfur per million btu content, unless the clean coal
16facility does not use gasification technology and was operating
17as a conventional coal-fired electric generating facility on
18June 1, 2009 (the effective date of Public Act 95-1027).
19    "Clean coal SNG facility" means a facility that uses a
20gasification process to produce substitute natural gas, that
21sequesters at least 90% of the total carbon emissions that the
22facility would otherwise emit and that uses petroleum coke or
23coal as a feedstock, with all such coal having a high
24bituminous rank and greater than 1.7 pounds of sulfur per
25million btu content.
26    "Commission" means the Illinois Commerce Commission.

 

 

HB1458 Enrolled- 3 -LRB097 05385 PJG 45442 b

1    "Costs incurred in connection with the development and
2construction of a facility" means:
3        (1) the cost of acquisition of all real property and
4    improvements in connection therewith and equipment and
5    other property, rights, and easements acquired that are
6    deemed necessary for the operation and maintenance of the
7    facility;
8        (2) financing costs with respect to bonds, notes, and
9    other evidences of indebtedness of the Agency;
10        (3) all origination, commitment, utilization,
11    facility, placement, underwriting, syndication, credit
12    enhancement, and rating agency fees;
13        (4) engineering, design, procurement, consulting,
14    legal, accounting, title insurance, survey, appraisal,
15    escrow, trustee, collateral agency, interest rate hedging,
16    interest rate swap, capitalized interest and other
17    financing costs, and other expenses for professional
18    services; and
19        (5) the costs of plans, specifications, site study and
20    investigation, installation, surveys, other Agency costs
21    and estimates of costs, and other expenses necessary or
22    incidental to determining the feasibility of any project,
23    together with such other expenses as may be necessary or
24    incidental to the financing, insuring, acquisition, and
25    construction of a specific project and placing that project
26    in operation.

 

 

HB1458 Enrolled- 4 -LRB097 05385 PJG 45442 b

1    "Department" means the Department of Commerce and Economic
2Opportunity.
3    "Director" means the Director of the Illinois Power Agency.
4    "Demand-response" means measures that decrease peak
5electricity demand or shift demand from peak to off-peak
6periods.
7    "Energy efficiency" means measures that reduce the amount
8of electricity or natural gas required to achieve a given end
9use.
10    "Electric utility" has the same definition as found in
11Section 16-102 of the Public Utilities Act.
12    "Facility" means an electric generating unit or a
13co-generating unit that produces electricity along with
14related equipment necessary to connect the facility to an
15electric transmission or distribution system.
16    "Governmental aggregator" means one or more units of local
17government that individually or collectively procure
18electricity to serve residential retail electrical loads
19located within its or their jurisdiction.
20    "Local government" means a unit of local government as
21defined in Article VII of Section 1 of the Illinois
22Constitution.
23    "Municipality" means a city, village, or incorporated
24town.
25    "Person" means any natural person, firm, partnership,
26corporation, either domestic or foreign, company, association,

 

 

HB1458 Enrolled- 5 -LRB097 05385 PJG 45442 b

1limited liability company, joint stock company, or association
2and includes any trustee, receiver, assignee, or personal
3representative thereof.
4    "Project" means the planning, bidding, and construction of
5a facility.
6    "Public utility" has the same definition as found in
7Section 3-105 of the Public Utilities Act.
8    "Real property" means any interest in land together with
9all structures, fixtures, and improvements thereon, including
10lands under water and riparian rights, any easements,
11covenants, licenses, leases, rights-of-way, uses, and other
12interests, together with any liens, judgments, mortgages, or
13other claims or security interests related to real property.
14    "Renewable energy credit" means a tradable credit that
15represents the environmental attributes of a certain amount of
16energy produced from a renewable energy resource.
17    "Renewable energy resources" includes energy and its
18associated renewable energy credit or renewable energy credits
19from wind, solar thermal energy, photovoltaic cells and panels,
20biodiesel, anaerobic digestion, crops and untreated and
21unadulterated organic waste biomass, tree waste, hydropower
22that does not involve new construction or significant expansion
23of hydropower dams, and other alternative sources of
24environmentally preferable energy. For purposes of this Act,
25landfill gas produced in the State is considered a renewable
26energy resource. "Renewable energy resources" does not include

 

 

HB1458 Enrolled- 6 -LRB097 05385 PJG 45442 b

1the incineration or burning of tires, garbage, general
2household, institutional, and commercial waste, industrial
3lunchroom or office waste, landscape waste other than tree
4waste, railroad crossties, utility poles, or construction or
5demolition debris, other than untreated and unadulterated
6waste wood.
7    "Revenue bond" means any bond, note, or other evidence of
8indebtedness issued by the Authority, the principal and
9interest of which is payable solely from revenues or income
10derived from any project or activity of the Agency.
11    "Sequester" means permanent storage of carbon dioxide by
12injecting it into a saline aquifer, a depleted gas reservoir,
13or an oil reservoir, directly or through an enhanced oil
14recovery process that may involve intermediate storage in a
15salt dome.
16    "Servicing agreement" means (i) in the case of an electric
17utility, an agreement between the owner of a clean coal
18facility and such electric utility, which agreement shall have
19terms and conditions meeting the requirements of paragraph (3)
20of subsection (d) of Section 1-75, and (ii) in the case of an
21alternative retail electric supplier, an agreement between the
22owner of a clean coal facility and such alternative retail
23electric supplier, which agreement shall have terms and
24conditions meeting the requirements of Section 16-115(d)(5) of
25the Public Utilities Act.
26    "Substitute natural gas" or "SNG" means a gas manufactured

 

 

HB1458 Enrolled- 7 -LRB097 05385 PJG 45442 b

1by gasification of hydrocarbon feedstock, which is
2substantially interchangeable in use and distribution with
3conventional natural gas.
4    "Total resource cost test" or "TRC test" means a standard
5that is met if, for an investment in energy efficiency or
6demand-response measures, the benefit-cost ratio is greater
7than one. The benefit-cost ratio is the ratio of the net
8present value of the total benefits of the program to the net
9present value of the total costs as calculated over the
10lifetime of the measures. A total resource cost test compares
11the sum of avoided electric utility costs, representing the
12benefits that accrue to the system and the participant in the
13delivery of those efficiency measures, as well as other
14quantifiable societal benefits, including avoided natural gas
15utility costs, to the sum of all incremental costs of end-use
16measures that are implemented due to the program (including
17both utility and participant contributions), plus costs to
18administer, deliver, and evaluate each demand-side program, to
19quantify the net savings obtained by substituting the
20demand-side program for supply resources. In calculating
21avoided costs of power and energy that an electric utility
22would otherwise have had to acquire, reasonable estimates shall
23be included of financial costs likely to be imposed by future
24regulations and legislation on emissions of greenhouse gases.
25(Source: P.A. 95-481, eff. 8-28-07; 95-913, eff. 1-1-09;
2695-1027, eff. 6-1-09; 96-33, eff. 7-10-09; 96-159, eff.

 

 

HB1458 Enrolled- 8 -LRB097 05385 PJG 45442 b

18-10-09; 96-784, eff. 8-28-09; 96-1000, eff. 7-2-10.)
 
2    Section 99. Effective date. This Act takes effect upon
3becoming law.