Full Text of SB3968 103rd General Assembly
SB3968 103RD GENERAL ASSEMBLY | | | 103RD GENERAL ASSEMBLY
State of Illinois
2023 and 2024 SB3968 Introduced 10/11/2024, by Sen. Paul Faraci SYNOPSIS AS INTRODUCED: | | 415 ILCS 5/59 | | 415 ILCS 5/59.5 | |
| Amends the Environmental Protection Act. Provides that no person shall conduct a carbon sequestration activity within a sequestration facility that overlies, underlies, or passes through a sole-source aquifer. Defines "sole-source aquifer". Effective immediately. |
| |
| | A BILL FOR |
| | | | SB3968 | | LRB103 42050 BDA 75274 b |
|
| 1 | | AN ACT concerning safety. | 2 | | Be it enacted by the People of the State of Illinois, | 3 | | represented in the General Assembly: | 4 | | Section 5. The Environmental Protection Act is amended by | 5 | | changing Sections 59 and 59.5 as follows: | 6 | | (415 ILCS 5/59) | 7 | | Sec. 59. Definitions. As used in this Title: | 8 | | "Carbon dioxide capture project" mean a project or | 9 | | facility that: | 10 | | (1) uses equipment to capture a significant quantity | 11 | | of carbon dioxide directly from the ambient air or uses a | 12 | | process to separate carbon dioxide from industrial or | 13 | | energy-related sources, other than oil or gas production | 14 | | from a well; and | 15 | | (2) produces a concentrated fluid of carbon dioxide. | 16 | | "Carbon dioxide stream" means carbon dioxide, any | 17 | | incidental associated substances derived from the source | 18 | | materials and process of producing or capturing carbon | 19 | | dioxide, and any substance added to the stream to enable or | 20 | | improve the injection process or the detection of a leak or | 21 | | rupture. | 22 | | "Carbon sequestration activity" means the injection of one | 23 | | or more carbon dioxide streams into underground geologic |
| | | SB3968 | - 2 - | LRB103 42050 BDA 75274 b |
|
| 1 | | formations under at least one Class VI well permit for | 2 | | long-term sequestration. | 3 | | "Criteria pollutants" means the 6 pollutants for which the | 4 | | United States Environmental Protection Agency has set National | 5 | | Ambient Air Quality Standards under Section 109 of the Clean | 6 | | Air Act, together with recognized precursors to those | 7 | | pollutants. | 8 | | "Project labor agreement" means a prehire collective | 9 | | bargaining agreement that covers all terms and conditions of | 10 | | employment on a specific construction project and must include | 11 | | the following: | 12 | | (1) provisions establishing the minimum hourly wage | 13 | | for each class of labor organization employee; | 14 | | (2) provisions establishing the benefits and other | 15 | | compensation for each class of labor organization | 16 | | employee; | 17 | | (3) provisions establishing that no strike or disputes | 18 | | will be engaged in by the labor organization employees; | 19 | | (4) provisions establishing that no lockout or | 20 | | disputes will be engaged in by the general contractor | 21 | | building the project; and | 22 | | (5) provisions for minorities and women, as defined | 23 | | under the Business Enterprise for Minorities, Women, and | 24 | | Persons with Disabilities Act, setting forth goals for | 25 | | apprenticeship hours to be performed by minorities and | 26 | | women and setting forth goals for total hours to be |
| | | SB3968 | - 3 - | LRB103 42050 BDA 75274 b |
|
| 1 | | performed by underrepresented minorities and women. | 2 | | "Project labor agreement" includes other terms and conditions | 3 | | a labor organization or general contractor building the | 4 | | project deems necessary. | 5 | | "Sequestration facility" means the carbon dioxide | 6 | | sequestration reservoir, underground equipment, including, but | 7 | | not limited to, well penetrations, and surface facilities and | 8 | | equipment used or proposed to be used in a carbon | 9 | | sequestration activity. "Sequestration facility" includes each | 10 | | injection well and equipment used to connect surface | 11 | | activities to the carbon dioxide sequestration reservoir and | 12 | | underground equipment. "Sequestration facility" does not | 13 | | include pipelines used to transport carbon dioxide to a | 14 | | sequestration facility. | 15 | | "Sole-source aquifer" means an aquifer designated as a | 16 | | sole-source or principal aquifer by the United States | 17 | | Environmental Protection Agency under the federal Safe | 18 | | Drinking Water Act, together with the aquifer's upstream | 19 | | areas, which, for purposes of this definition, consist of the | 20 | | project review area of the aquifer, as identified by the | 21 | | United States Environmental Protection Agency. | 22 | | (Source: P.A. 103-651, eff. 7-18-24.) | 23 | | (415 ILCS 5/59.5) | 24 | | Sec. 59.5. Prohibitions. | 25 | | (a) No person shall conduct a carbon sequestration |
| | | SB3968 | - 4 - | LRB103 42050 BDA 75274 b |
|
| 1 | | activity without a permit issued by the Agency under Section | 2 | | 59.6. This prohibition does not apply to any carbon | 3 | | sequestration activity in existence and permitted by the | 4 | | United States Environmental Protection Agency on or before the | 5 | | effective date of this amendatory Act of the 103rd General | 6 | | Assembly or to any Class VI well for which (1) a Class VI well | 7 | | permit has been filed with the United States Environmental | 8 | | Protection Agency and a completeness determination had been | 9 | | received prior to January 1, 2023, and (2) the sequestration | 10 | | activity will occur on a contiguous property with common | 11 | | ownership where the carbon dioxide is generated, captured, and | 12 | | injected. | 13 | | (b) No person shall conduct a carbon sequestration | 14 | | activity in violation of this Act. | 15 | | (c) No person shall conduct a carbon sequestration | 16 | | activity in violation of any applicable rules adopted by the | 17 | | Pollution Control Board. | 18 | | (d) No person shall conduct a carbon sequestration | 19 | | activity in violation of a permit issued by the Agency under | 20 | | this Act. | 21 | | (e) No person shall fail to submit reports required by | 22 | | this Act or required by a permit issued by the Agency under | 23 | | this Act. | 24 | | (f) No person shall conduct a carbon sequestration | 25 | | activity without obtaining an order for integration of pore | 26 | | space from the Department of Natural Resources, if applicable. |
| | | SB3968 | - 5 - | LRB103 42050 BDA 75274 b |
|
| 1 | | (g) No person shall conduct a carbon sequestration | 2 | | activity within a sequestration facility that overlies, | 3 | | underlies, or passes through a sole-source aquifer. | 4 | | (Source: P.A. 103-651, eff. 7-18-24.) | 5 | | Section 99. Effective date. This Act takes effect upon | 6 | | becoming law. |
|