Rep. Gary Hannig
Filed: 10/20/2005
|
|
09400SB1843ham001 |
|
LRB094 11455 RSP 49842 a |
|
|
| 1 |
| AMENDMENT TO SENATE BILL 1843
|
| 2 |
| AMENDMENT NO. ______. Amend Senate Bill 1843 by replacing |
| 3 |
| everything after the enacting clause with the following:
|
| 4 |
| "Section 5. The Illinois Procurement Code is amended by |
| 5 |
| changing Section 30-30 as follows:
|
| 6 |
| (30 ILCS 500/30-30)
|
| 7 |
| Sec. 30-30. Contracts in excess of $250,000. For
building |
| 8 |
| construction contracts in excess of
$250,000, separate |
| 9 |
| specifications shall be prepared for all
equipment, labor, and |
| 10 |
| materials in
connection with the following 5 subdivisions of |
| 11 |
| the work to be
performed:
|
| 12 |
| (1) plumbing;
|
| 13 |
| (2) heating, piping, refrigeration, and automatic
|
| 14 |
| temperature control systems,
including the testing and |
| 15 |
| balancing of those systems;
|
| 16 |
| (3) ventilating and distribution systems for
|
| 17 |
| conditioned air, including the testing
and balancing of |
| 18 |
| those systems;
|
| 19 |
| (4) electric wiring; and
|
| 20 |
| (5) general contract work.
|
| 21 |
| The specifications must be so drawn as to permit separate |
| 22 |
| and
independent bidding upon
each of the 5 subdivisions of |
| 23 |
| work. All contracts awarded
for any part thereof shall
award |
| 24 |
| the 5 subdivisions of work separately to responsible and
|
|
|
|
09400SB1843ham001 |
- 2 - |
LRB094 11455 RSP 49842 a |
|
|
| 1 |
| reliable persons, firms, or
corporations engaged in these |
| 2 |
| classes of work. The contracts, at
the discretion of the
|
| 3 |
| construction agency, may be assigned to the successful bidder |
| 4 |
| on
the general contract work or
to the successful bidder on the |
| 5 |
| subdivision of work designated by
the construction agency |
| 6 |
| before
the bidding as the prime subdivision of work, provided |
| 7 |
| that all
payments will be made directly
to the contractors for |
| 8 |
| the 5 subdivisions of work upon compliance
with the conditions |
| 9 |
| of the
contract. A contract may be let for one or more |
| 10 |
| buildings in any
project to the same contractor.
The |
| 11 |
| specifications shall require, however, that unless the
|
| 12 |
| buildings are identical, a separate price
shall be submitted |
| 13 |
| for each building. The contract may be awarded
to the lowest |
| 14 |
| responsible
bidder for each or all of the buildings included in |
| 15 |
| the
specifications.
|
| 16 |
| Until a date 2 years after the effective date of this |
| 17 |
| amendatory Act of the 93rd General Assembly, the requirements |
| 18 |
| of this Section do not apply to the construction of an |
| 19 |
| Emergency Operations Center for the Illinois Emergency |
| 20 |
| Management Agency if (i) the majority of the funding for the |
| 21 |
| project is from federal funds, (ii) the bid of the successful |
| 22 |
| bidder identifies the name of the subcontractor, if any, and |
| 23 |
| the bid proposal costs for each of the 5 subdivisions of work |
| 24 |
| set forth in this Section, and (iii) the contract entered into |
| 25 |
| with the successful bidder provides that no identified |
| 26 |
| subcontractor may be terminated without the written consent of |
| 27 |
| the Capital Development Board.
|
| 28 |
| Until a date 5 years after the effective date of this |
| 29 |
| amendatory Act of the 94th General Assembly, the requirements |
| 30 |
| of this Section do not apply to the Capitol Building HVAC |
| 31 |
| upgrade project if (i) the bid of the successful bidder |
| 32 |
| identifies the name of the subcontractor, if any, and the bid |
| 33 |
| proposal costs for each of the 5 subdivisions of work set forth |
| 34 |
| in this Section, and (ii) the contract entered into with the |