| AMENDMENT NO. ______. Amend Senate Bill 661 by replacing |
| 3 |
| everything after the enacting clause with the following:
|
| 4 |
| "Section 5. The Illinois Procurement Code is amended by |
| 5 |
| changing Section 30-30 and by adding Section 30-31 as follows:
|
| 6 |
| (30 ILCS 500/30-30)
|
| 7 |
| Sec. 30-30. Projects
Contracts in excess of $750,000
|
| 8 |
| $250,000. For
building construction projects
contracts in |
| 9 |
| excess of
$750,000
$250,000, separate specifications shall be |
| 10 |
| prepared for all
equipment, labor, and materials in
connection |
| 11 |
| with the following 5 subdivisions of the work to be
performed:
|
| 12 |
| (1) plumbing;
|
| 13 |
| (2) heating, piping, refrigeration, and automatic
|
| 14 |
| temperature control systems,
including the testing and |
| 15 |
| balancing of those systems;
|
| 16 |
| (3) ventilating and distribution systems for
|
| 17 |
| conditioned air, including the testing
and balancing of |
| 18 |
| those systems;
|
| 19 |
| (4) electric wiring; and
|
| 20 |
| (5) general contract work.
|
| 21 |
| The specifications must be so drawn as to permit separate |
| 22 |
| and
independent bidding upon
each of the 5 subdivisions of |
| 23 |
| work. All contracts awarded
for any part thereof shall
award |
| 24 |
| the 5 subdivisions of work separately to responsible and
|
|
|
|
09400SB0661sam001 |
- 2 - |
LRB094 04399 JAM 44492 a |
|
|
| 1 |
| reliable persons, firms, or
corporations engaged in these |
| 2 |
| classes of work. The contracts, at
the discretion of the
|
| 3 |
| construction agency, may be assigned to the successful bidder |
| 4 |
| on
the general contract work or
to the successful bidder on the |
| 5 |
| subdivision of work designated by
the construction agency |
| 6 |
| before
the bidding as the prime subdivision of work, provided |
| 7 |
| that all
payments will be made directly
to the contractors for |
| 8 |
| the 5 subdivisions of work upon compliance
with the conditions |
| 9 |
| of the
contract. A contract may be let for one or more |
| 10 |
| buildings in any
project to the same contractor.
The |
| 11 |
| specifications shall require, however, that unless the
|
| 12 |
| buildings are identical, a separate price
shall be submitted |
| 13 |
| for each building. The contract may be awarded
to the lowest |
| 14 |
| responsible
bidder for each or all of the buildings included in |
| 15 |
| the
specifications.
|
| 16 |
| Notwithstanding the requirements of this Section, if the |
| 17 |
| contract for work to be performed in any one of the 5 |
| 18 |
| subdivisions is less than $200,000, then the contract for that |
| 19 |
| subdivision need not be separately awarded
but may be |
| 20 |
| incorporated into one or more of the remaining contracts.
|
| 21 |
| Until a date 2 years after the effective date of this |
| 22 |
| amendatory Act of the 93rd General Assembly, the requirements |
| 23 |
| of this Section do not apply to the construction of an |
| 24 |
| Emergency Operations Center for the Illinois Emergency |
| 25 |
| Management Agency if (i) the majority of the funding for the |
| 26 |
| project is from federal funds, (ii) the bid of the successful |
| 27 |
| bidder identifies the name of the subcontractor, if any, and |
| 28 |
| the bid proposal costs for each of the 5 subdivisions of work |
| 29 |
| set forth in this Section, and (iii) the contract entered into |
| 30 |
| with the successful bidder provides that no identified |
| 31 |
| subcontractor may be terminated without the written consent of |
| 32 |
| the Capital Development Board.
|
| 33 |
| (Source: P.A. 93-1035, eff. 9-10-04.)
|
|
|
|
09400SB0661sam001 |
- 3 - |
LRB094 04399 JAM 44492 a |
|
|
| 1 |
| (30 ILCS 500/30-31 new) |
| 2 |
| Sec. 30-31. Construction projects of $750,000 or less. For |
| 3 |
| building construction projects of $750,000 or less, (i) the |
| 4 |
| successful bidder must identify the name of the subcontractor, |
| 5 |
| if any, and the bid proposal cost for each of the 5 |
| 6 |
| subdivisions of work set forth in Section 30-30 and (ii) the |
| 7 |
| contract entered into with the successful bidder shall provide |
| 8 |
| that no identified responsive and responsible subcontractor |
| 9 |
| who provides a bid bond may be terminated without the written |
| 10 |
| consent of the Capital Development Board.
|
| 11 |
| Section 99. Effective date. This Act takes effect upon |
| 12 |
| becoming law.".
|