| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| 1 | AN ACT concerning finance.
| ||||||||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||
| 3 | represented in the General Assembly:
| ||||||||||||||||||||||||
| 4 | Section 1. Short title. This Act may be cited as the | ||||||||||||||||||||||||
| 5 | Electric Vehicle Charging System Rebate Program Act. | ||||||||||||||||||||||||
| 6 | Section 5. Definitions. As used in this Act: | ||||||||||||||||||||||||
| 7 | "Agency" means the Illinois Environmental Protection | ||||||||||||||||||||||||
| 8 | Agency. | ||||||||||||||||||||||||
| 9 | "Alternating current Level 2 charging station" or "Level 2 | ||||||||||||||||||||||||
| 10 | charging station" means an electric vehicle charging system | ||||||||||||||||||||||||
| 11 | that uses alternating current electricity providing at least 3 | ||||||||||||||||||||||||
| 12 | kilowatts and means a system that: | ||||||||||||||||||||||||
| 13 | (1) is capable of providing electricity from a | ||||||||||||||||||||||||
| 14 | non-vehicle source to charge the batteries of one or more | ||||||||||||||||||||||||
| 15 | electric vehicles; | ||||||||||||||||||||||||
| 16 | (2) meets recognized standards and protocols | ||||||||||||||||||||||||
| 17 | including, but not limited to, Society of Automotive | ||||||||||||||||||||||||
| 18 | Engineers (SAE) J1772 of SAE International and Tesla | ||||||||||||||||||||||||
| 19 | protocol; and | ||||||||||||||||||||||||
| 20 | (3) is designed and installed in compliance with | ||||||||||||||||||||||||
| 21 | Article 625 of the National Electrical Code to appropriate | ||||||||||||||||||||||||
| 22 | Nationally Recognized Testing Laboratories' standards. | ||||||||||||||||||||||||
| 23 | "Department" means the Department of Revenue. | ||||||||||||||||||||||||
| |||||||
| |||||||
| 1 | "Direct current fast charging system" means an electric | ||||||
| 2 | vehicle charging system that utilizes direct current | ||||||
| 3 | electricity providing 40 kilowatts or greater and: | ||||||
| 4 | (1) is capable of providing electricity from a | ||||||
| 5 | non-vehicle source to charge the batteries of one or more | ||||||
| 6 | electric vehicles; | ||||||
| 7 | (2) meets recognized standards and protocols, | ||||||
| 8 | including, but not limited to, Society of Automotive | ||||||
| 9 | Engineers (SAE) J1772 of SAE International, Tesla | ||||||
| 10 | protocol, and CHAdeMO protocol; and | ||||||
| 11 | (3) is designed and installed in compliance with | ||||||
| 12 | Article 625 of the National Electrical Code to appropriate | ||||||
| 13 | Nationally Recognized Testing Laboratories' standards. | ||||||
| 14 | Section 10. Rebate program. | ||||||
| 15 | (a) Subject to appropriation, for State fiscal years | ||||||
| 16 | beginning on or after July 1, 2020, the Agency, in consultation | ||||||
| 17 | with electric vehicle stakeholders and the Department, shall | ||||||
| 18 | administer a rebate program that promotes the installation or | ||||||
| 19 | upgrade of an electric vehicle charging system and may contract | ||||||
| 20 | with a third-party administrator to operate and manage the | ||||||
| 21 | rebate program. | ||||||
| 22 | (b) An applicant may be eligible for a rebate under this | ||||||
| 23 | Act if the applicant: | ||||||
| 24 | (1) installs a new electric vehicle charging system | ||||||
| 25 | where none previously existed that meets or exceeds the | ||||||
| |||||||
| |||||||
| 1 | following requirements: | ||||||
| 2 | (A) the system is an alternating current Level 2 | ||||||
| 3 | station with 2 or more ports that can provide | ||||||
| 4 | electricity to 2 or more electric vehicles; or | ||||||
| 5 | (B) the system is a direct current fast charging | ||||||
| 6 | system; or | ||||||
| 7 | (2) upgrades an existing electric vehicle charging | ||||||
| 8 | system to either: | ||||||
| 9 | (A) an alternating current Level 2 station with two | ||||||
| 10 | or more ports that provide electricity to two or more | ||||||
| 11 | electric vehicles; or | ||||||
| 12 | (B) a direct current fast charging system. | ||||||
| 13 | (c) Subject to subsection (d), rebates shall be distributed | ||||||
| 14 | as follows: | ||||||
| 15 | (1) each eligible installation of an electric vehicle | ||||||
| 16 | charging system shall receive: | ||||||
| 17 | (A) $4,500 for the installation of an alternating | ||||||
| 18 | current Level 2 station with two or more ports; and | ||||||
| 19 | (B) $35,000 for the installation of a direct | ||||||
| 20 | current fast charging system; and | ||||||
| 21 | (2) each eligible upgrade of an electric vehicle | ||||||
| 22 | charging system shall receive: | ||||||
| 23 | (A) $3,000 for the upgrade to an alternating | ||||||
| 24 | current Level 2 station with two or more ports; and | ||||||
| 25 | (B) $28,000 for the upgrade to a direct current | ||||||
| 26 | fast charging system. | ||||||
| |||||||
| |||||||
| 1 | (d) The Agency shall not issue more than $500,000 in total | ||||||
| 2 | rebates under this Act in any fiscal year. | ||||||
| 3 | (e) This Act shall apply to electric vehicle charging | ||||||
| 4 | systems that are installed or upgraded after December 31, 2020. | ||||||
| 5 | Section 15. Agency responsibilities. The Agency shall | ||||||
| 6 | prepare any forms that may be necessary for an applicant to | ||||||
| 7 | claim a rebate pursuant to this Act and shall require each | ||||||
| 8 | applicant to furnish reasonable information to ascertain the | ||||||
| 9 | validity of the claim, including but not limited to, | ||||||
| 10 | documentation necessary to demonstrate that the installation | ||||||
| 11 | or upgrade for which the rebate is claimed is eligible. The | ||||||
| 12 | Agency shall adopt rules for the implementation of this Act. | ||||||
| 13 | Section 20. Application procedures. Applicants shall apply | ||||||
| 14 | to the Agency within 12 months after the date that the newly | ||||||
| 15 | installed or upgraded charging system is placed into service to | ||||||
| 16 | claim a rebate from the electric vehicle charging system rebate | ||||||
| 17 | program. Failure to apply to the commission within twelve | ||||||
| 18 | months of the date that the newly installed or upgraded | ||||||
| 19 | charging system is placed into service shall constitute a | ||||||
| 20 | waiver of the right to claim the rebate. | ||||||
| 21 | Nothing in this Act shall alter taxes due on the original | ||||||
| 22 | purchase or upgrade price of an electric vehicle charging | ||||||
| 23 | system prior to the application of the rebate. Any rebate | ||||||
| 24 | received pursuant to the electric vehicle charging system | ||||||
| |||||||
| |||||||
| 1 | rebate program shall not be considered income for the purposes | ||||||
| 2 | of Illinois Income Tax Act. | ||||||
| 3 | In administering the electric vehicle charging system | ||||||
| 4 | rebate program, the Agency shall give consideration to the | ||||||
| 5 | following guidelines: | ||||||
| 6 | (1) priority should be given to electric vehicle | ||||||
| 7 | charging systems that are publicly available, serve | ||||||
| 8 | multiple tenants, employees, or customers, or serve | ||||||
| 9 | electric vehicle fleets; | ||||||
| 10 | (2) electric vehicle charging system rebates should | ||||||
| 11 | enhance broader public clean energy and grid resiliency | ||||||
| 12 | goals by supporting deployment of electric vehicle | ||||||
| 13 | charging systems that can regulate their time of use, be | ||||||
| 14 | networked and co-optimized with other electric vehicle | ||||||
| 15 | charging systems, and otherwise provide grid services or | ||||||
| 16 | other benefits to the utility and electric grid; and | ||||||
| 17 | (3) electric vehicle charging systems that serve a | ||||||
| 18 | single person, such as a reserved parking stall or a | ||||||
| 19 | single-family residence, shall not be eligible for | ||||||
| 20 | rebates.
| ||||||
| 21 | Section 99. Effective date. This Act takes effect upon | ||||||
| 22 | becoming law.
| ||||||