|
| | SB3550 Engrossed | | LRB100 19769 MJP 35044 b |
|
|
| 1 | | AN ACT concerning safety.
|
| 2 | | Be it enacted by the People of the State of Illinois,
|
| 3 | | represented in the General Assembly:
|
| 4 | | Section 5. The Consumer Electronics Recycling Act is |
| 5 | | amended by changing Section 1-10 as follows: |
| 6 | | (415 ILCS 151/1-10)
|
| 7 | | (Section scheduled to be repealed on December 31, 2026) |
| 8 | | Sec. 1-10. Manufacturer e-waste program. |
| 9 | | (a) For program year 2019 and each program year thereafter, |
| 10 | | each manufacturer shall, individually or as part of a |
| 11 | | manufacturer clearinghouse, provide a manufacturer e-waste |
| 12 | | program to transport and subsequently recycle, in accordance |
| 13 | | with the requirements of this Act, residential CEDs collected |
| 14 | | at, and prepared for transport from, the program collection |
| 15 | | sites and one-day collection events included in the program |
| 16 | | during the program year. |
| 17 | | (b) Each manufacturer e-waste program must include, at a |
| 18 | | minimum, the following: |
| 19 | | (1) satisfaction of the convenience standard described |
| 20 | | in Section 1-15 of this Act; |
| 21 | | (2) instructions for designated county recycling |
| 22 | | coordinators and municipal joint action agencies to |
| 23 | | annually file notice to participate in the program; |
|
| | SB3550 Engrossed | - 2 - | LRB100 19769 MJP 35044 b |
|
|
| 1 | | (3) transportation and subsequent recycling of the |
| 2 | | residential CEDs collected at, and prepared for transport |
| 3 | | from, the program collection sites and one-day collection |
| 4 | | events included in the program during the program year; and |
| 5 | | (4) submission of a report to the Agency, by March 1, |
| 6 | | 2020, and each March 1 thereafter, which includes: |
| 7 | | (A) the total weight of all residential CEDs |
| 8 | | transported from program collection sites and one-day |
| 9 | | collection events throughout the State during the |
| 10 | | preceding program year by CED category; |
| 11 | | (B) the total weight of residential CEDs |
| 12 | | transported from all program collection sites and |
| 13 | | one-day collection events in each county in the State |
| 14 | | during the preceding program year by CED category; and |
| 15 | | (C) the total weight of residential CEDs |
| 16 | | transported from all program collection sites and |
| 17 | | one-day collection events in each county in the State |
| 18 | | during that preceding program year and that was |
| 19 | | recycled. |
| 20 | | (c) Each manufacturer e-waste program shall make the |
| 21 | | instructions required under paragraph (2) of subsection (b) |
| 22 | | available on its website by December 1, 2017, and the program |
| 23 | | shall provide to the Agency a hyperlink to the website for |
| 24 | | posting on the Agency's website.
|
| 25 | | (d) Nothing in this Act shall prevent a manufacturer from |
| 26 | | accepting, through a manufacturer e-waste program, residential |