HB1013 Engrossed |
|
LRB096 03878 JAM 13912 b |
|
|
| 1 |
| AN ACT concerning State buildings.
|
| 2 |
| Be it enacted by the People of the State of Illinois,
|
| 3 |
| represented in the General Assembly:
|
| 4 |
| Section 1. Short title. This Act may be cited as the Green |
| 5 |
| Buildings Act. |
| 6 |
| Section 5. Findings.
The General Assembly finds that an |
| 7 |
| efficient green building plan is essential to: |
| 8 |
| (1) reduce the increasing costs of energy for public |
| 9 |
| buildings and reduce the State's overall energy usage; |
| 10 |
| (2) preserve the environment and make State buildings |
| 11 |
| better for those who work and study in them, as well as the |
| 12 |
| area around them; and |
| 13 |
| (3) cut pollution, moderate peak energy demand, better |
| 14 |
| assure the reliability of energy studies, and stabilize energy |
| 15 |
| costs.
|
| 16 |
| Section 10. Definitions. In this Act: |
| 17 |
| "Board" means the Capital Development Board. |
| 18 |
| "USGBC" means the United States Green Building Council. |
| 19 |
| "LEED" means the USGBC Leadership in Energy and |
| 20 |
| Environmental Design green building rating standard. |
| 21 |
| "GBI" means The Green Building Initiative. |
| 22 |
| "Green Globes" means the GBI green building construction |
|
|
|
HB1013 Engrossed |
- 2 - |
LRB096 03878 JAM 13912 b |
|
|
| 1 |
| model. |
| 2 |
| "Major renovation" means a project with a construction |
| 3 |
| budget that equals 40% or more of the building's current |
| 4 |
| replacement cost.
|
| 5 |
| Section 15. Green Buildings Standards.
|
| 6 |
| (a) All new State-funded building construction and major |
| 7 |
| renovations of existing State-owned facilities are required to |
| 8 |
| seek LEED, Green Globes, or equivalent certification. |
| 9 |
| (b) All construction and major renovation projects, |
| 10 |
| regardless of size, must achieve the highest level of |
| 11 |
| certification practical within the project budget. |
| 12 |
| (1) New buildings and major renovations of less than |
| 13 |
| 10,000 square feet must meet the highest standard of the |
| 14 |
| Leadership in Energy and Environmental Design's rating |
| 15 |
| system for new commercial construction and major |
| 16 |
| renovation projects, as established by the United States |
| 17 |
| Green Building Council, or an equivalent standard, |
| 18 |
| including, but not limited to, the Green Building |
| 19 |
| Initiative's Green Globes USA design program. USGBC LEED, |
| 20 |
| GBI Green Globes, or the equivalent certification is not |
| 21 |
| required. |
| 22 |
| (2) New buildings and major renovations of 10,000 |
| 23 |
| square feet or more must achieve the silver building rating |
| 24 |
| of the Leadership in Energy and Environmental Design's |
| 25 |
| rating system for new commercial construction and major |
|
|
|
HB1013 Engrossed |
- 3 - |
LRB096 03878 JAM 13912 b |
|
|
| 1 |
| renovation projects, as established by the United States |
| 2 |
| Green Building Council, or an equivalent standard, |
| 3 |
| including, but not limited to, a two-globe rating in the |
| 4 |
| Green Globes USA design program. USGBC LEED, GBI Green |
| 5 |
| Globes, or the equivalent certification is required. |
| 6 |
| (c) Exemptions to these standards are buildings that are |
| 7 |
| not "comfort" conditioned as determined by the Board. However, |
| 8 |
| the project design team must document and incorporate all |
| 9 |
| appropriate sustainable building methods, strategies, and |
| 10 |
| technologies in the final design. |
| 11 |
| (d) State agencies and the project design team may apply to |
| 12 |
| the Board for a waiver from these standards. |
| 13 |
| (e) Waivers shall be granted by the Board or an appropriate |
| 14 |
| agency when the applicant can demonstrate and document:
|
| 15 |
| (1) An unreasonable financial burden, taking into |
| 16 |
| account the operating and construction costs over the life |
| 17 |
| of the building and the total cost of ownership of the |
| 18 |
| building. |
| 19 |
| (2) An unreasonable impediment to construction. |
| 20 |
| (3) The standards would impair the principal function |
| 21 |
| of the building. |
| 22 |
| (4) The standards would compromise the historic nature |
| 23 |
| of the structure. |
| 24 |
| Documentation on the submittal must include at a minimum: |
| 25 |
| (1) Life cycle cost analysis. |
| 26 |
| (2) Energy modeling. |
|
|
|
HB1013 Engrossed |
- 4 - |
LRB096 03878 JAM 13912 b |
|
|
| 1 |
| The design team must provide the documentation for the new |
| 2 |
| project to confirm that LEED, Green Globes, or the equivalent |
| 3 |
| construction standards have been followed. |
| 4 |
| (f) In addition to any required LEED, Green Globes, or the |
| 5 |
| equivalent criteria, the Board shall require that all projects |
| 6 |
| referenced in subsection (a) implement at least one LEED |
| 7 |
| alternative transportation criterion for public transportation |
| 8 |
| or bicycle access. |
| 9 |
| (g) The green building standards contained in this Act |
| 10 |
| shall be analyzed and evaluated by the Board 5 years after the |
| 11 |
| effective date of this Act or upon the completion of 10 Board |
| 12 |
| green projects, whichever comes first. |
| 13 |
| Section 99. Effective date. This Act takes effect upon |
| 14 |
| becoming law.
|