| 1 | AN ACT concerning utilities. | |||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
| 3 | represented in the General Assembly: | |||||||||||||||||||
| 4 | Section 1. Short title. This Act may be cited as the Safety | |||||||||||||||||||
| 5 | Moratorium on Carbon Dioxide Pipelines Act. | |||||||||||||||||||
| 6 | Section 5. Legislative findings. The General Assembly | |||||||||||||||||||
| 7 | finds and determines that: | |||||||||||||||||||
| 8 | (1) Pipelines are being proposed in the State by companies | |||||||||||||||||||
| 9 | for the purposes of transportation of carbon dioxide both from | |||||||||||||||||||
| 10 | within the State and from locations outside the State; | |||||||||||||||||||
| 11 | (2) The transport of carbon dioxide via pipelines | |||||||||||||||||||
| 12 | significantly affects landowners' rights to enjoy their | |||||||||||||||||||
| 13 | property. Carbon dioxide pipelines may impede access to | |||||||||||||||||||
| 14 | property and fields, place permanent restrictions on the use | |||||||||||||||||||
| 15 | of land, reduce crop yield from construction activities, and | |||||||||||||||||||
| 16 | pose a risk of grave harm to humans, livestock, and other | |||||||||||||||||||
| 17 | animals if there is a release of carbon dioxide; | |||||||||||||||||||
| 18 | (3) As specified in the Carbon Dioxide Transportation and | |||||||||||||||||||
| 19 | Sequestration Act, regulation of the construction, | |||||||||||||||||||
| 20 | maintenance, and operation of pipelines transporting carbon | |||||||||||||||||||
| 21 | dioxide is within the statutory and regulatory jurisdiction of | |||||||||||||||||||
| 22 | the Pipeline and Hazardous Materials Safety Administration | |||||||||||||||||||
| 23 | (PHMSA) of the federal Department of Transportation; and | |||||||||||||||||||
| |||||||
| |||||||
| 1 | (4) in response to a major carbon dioxide pipeline failure | ||||||
| 2 | in Satartia, Mississippi in 2020 that resulted in local | ||||||
| 3 | evacuations and caused almost 50 people to seek medical | ||||||
| 4 | attention, PHMSA conducted an investigation of the risks to | ||||||
| 5 | human health and the environment presented by carbon dioxide | ||||||
| 6 | pipelines. PHMSA announced, on May 26, 2022, that to | ||||||
| 7 | strengthen CO2 pipeline safety and oversight, PHMSA is | ||||||
| 8 | initiating new rulemaking to update standards for carbon | ||||||
| 9 | dioxide pipelines, including requirements related to improved | ||||||
| 10 | safety, oversight, and emergency preparedness and response. | ||||||
| 11 | Section 10. Definitions. As used in this Act: | ||||||
| 12 | "Carbon dioxide pipeline" or "pipeline" means the in-state | ||||||
| 13 | portion of a pipeline, including appurtenant facilities, | ||||||
| 14 | property rights, and easements, that are used exclusively for | ||||||
| 15 | the purpose of transporting carbon dioxide to a point of sale, | ||||||
| 16 | storage, or another carbon management application. | ||||||
| 17 | "Commission" means the Illinois Commerce Commission. | ||||||
| 18 | "Criteria pollutants" are the pollutants that have been | ||||||
| 19 | identified as "criteria pollutants" by the United States | ||||||
| 20 | Environmental Protection Agency under Section 108 of the Clean | ||||||
| 21 | Air Act. | ||||||
| 22 | "Hazardous air pollutants" are the pollutants that have | ||||||
| 23 | been identified as "hazardous air pollutants" by the United | ||||||
| 24 | States Environmental Protection Agency under Section 112 of | ||||||
| 25 | the Clean Air Act. | ||||||
| |||||||
| |||||||
| 1 | "Sequester" has the meaning given to that term in Section | ||||||
| 2 | 1-10 of the Illinois Power Agency Act. | ||||||
| 3 | "Sequestration" means to sequester or be sequestered. | ||||||
| 4 | "Sequestration facility" means the carbon dioxide | ||||||
| 5 | sequestration reservoir, underground equipment, and surface | ||||||
| 6 | facilities and equipment used or proposed to be used in a | ||||||
| 7 | geologic storage operation. "Sequestration facility" includes | ||||||
| 8 | an injection well and equipment used to connect the surface | ||||||
| 9 | facility and equipment to the carbon dioxide sequestration | ||||||
| 10 | reservoir and underground equipment. "Sequestration facility" | ||||||
| 11 | does not include pipelines used to transport carbon dioxide to | ||||||
| 12 | a sequestration facility. | ||||||
| 13 | "Transportation" or "transport" means the physical | ||||||
| 14 | movement of carbon dioxide by pipeline conducted for a | ||||||
| 15 | person's or an entity's own use or account or the use or | ||||||
| 16 | account of another person, persons, or entity. | ||||||
| 17 | Section 15. Temporary statewide moratorium on construction | ||||||
| 18 | of carbon dioxide pipelines. | ||||||
| 19 | (a) No certificate of authority for the construction and | ||||||
| 20 | operation of a pipeline intended for transport of carbon | ||||||
| 21 | dioxide shall be issued by the Commission until: | ||||||
| 22 | (1) the Pipeline and Hazardous Materials Safety | ||||||
| 23 | Administration has adopted revised federal safety | ||||||
| 24 | standards for transportation of carbon dioxide; and | ||||||
| 25 | (2) the State of Illinois has commissioned and | ||||||
| |||||||
| |||||||
| 1 | finalized a study, which shall be made available to the | ||||||
| 2 | public, determining how far carbon dioxide pipelines must | ||||||
| 3 | be separated from livestock, residences, hospitals, | ||||||
| 4 | schools, nursing homes, places of worship, jails, prisons, | ||||||
| 5 | businesses, industry, and other locations where people | ||||||
| 6 | congregate, in order to ensure adequate time for the safe | ||||||
| 7 | evacuation or rescue of people and animals in the event of | ||||||
| 8 | a pipeline rupture or leak. The study shall: | ||||||
| 9 | (A) include input from first responders, including | ||||||
| 10 | both voluntary and paid professionals, law enforcement | ||||||
| 11 | officials, medical and veterinary professionals; | ||||||
| 12 | transportation experts; carbon dioxide pipeline | ||||||
| 13 | engineers; meteorologists, geologists, persons trained | ||||||
| 14 | in computational fluid dynamic modeling and other | ||||||
| 15 | modeling of carbon dioxide plumes, the Illinois | ||||||
| 16 | Emergency Management Agency, Illinois Department of | ||||||
| 17 | Public Health, County Emergency Management Agencies, | ||||||
| 18 | township officials, county boards, village boards, | ||||||
| 19 | city councils, and the general public; | ||||||
| 20 | (B) evaluate CO2 concentrations resulting from | ||||||
| 21 | pipeline ruptures or leaks in a variety of urban, | ||||||
| 22 | suburban, and rural settings present in Illinois, | ||||||
| 23 | including concentrations resulting from leaks or | ||||||
| 24 | ruptures of carbon dioxide pipelines with varying | ||||||
| 25 | diameters and carbon dioxide flow rates, based on | ||||||
| 26 | predictions of the most precise available | ||||||
| |||||||
| |||||||
| 1 | computational fluid dynamic model of CO2 plume | ||||||
| 2 | movement; | ||||||
| 3 | (C) recommend setbacks for each such setting, | ||||||
| 4 | pipeline diameter, and flow rate, based on: (1) the | ||||||
| 5 | concentrations of CO2 released in the event of a leak | ||||||
| 6 | or rupture, (2) the time humans and, where | ||||||
| 7 | appropriate, livestock would be exposed to those | ||||||
| 8 | concentrations, and (3) the ability to, and time | ||||||
| 9 | necessary to, self-evacuate or be rescued before | ||||||
| 10 | oxygen deprivation leads to serious health effects, | ||||||
| 11 | including, but not limited to, convulsions, | ||||||
| 12 | unconsciousness, coma, or death; among other | ||||||
| 13 | considerations, the study shall account for the | ||||||
| 14 | decreased mobility of elderly persons, young children, | ||||||
| 15 | persons who depend primarily on public transportation, | ||||||
| 16 | incarcerated persons, and persons gathered in spaces | ||||||
| 17 | where large numbers of people assemble, as well as the | ||||||
| 18 | availability of electric vehicles or other transport | ||||||
| 19 | options that do not use combustion engines; and | ||||||
| 20 | (D) recommend an initial amount of funding | ||||||
| 21 | sufficient to provide first responders, medical | ||||||
| 22 | professionals, local governments, and other entities | ||||||
| 23 | involved in the evacuation or rescue of persons | ||||||
| 24 | potentially affected by a CO2 pipeline rupture with | ||||||
| 25 | the equipment, training, staffing, and other items | ||||||
| 26 | necessary to carry out safe and timely evacuations and | ||||||
| |||||||
| |||||||
| 1 | rescues in the event of a rupture; the study shall also | ||||||
| 2 | recommend fees to be required of pipeline operators to | ||||||
| 3 | ensure availability of the necessary sum, as well as a | ||||||
| 4 | method for updating the amount of funding and fee | ||||||
| 5 | changes to account for changing costs, inflation, and | ||||||
| 6 | other relevant factors. | ||||||
| 7 | (b) Any application for a certificate of authority to | ||||||
| 8 | construct or operate a pipeline intended for transportation of | ||||||
| 9 | carbon dioxide that, as of the effective date of this Act, is | ||||||
| 10 | pending before the Commission shall (1) be held in abeyance, | ||||||
| 11 | without prejudice, until the revised safety standards and | ||||||
| 12 | study specified in subsection (a) have been finalized or the | ||||||
| 13 | temporary moratorium has expired as provided herein, and (2) | ||||||
| 14 | will be subject to any revised safety standards if adopted in | ||||||
| 15 | legislation. | ||||||
| 16 | (c) The temporary moratorium is inoperative when any of | ||||||
| 17 | the following events occur: | ||||||
| 18 | (1) Four years have passed since this Act's effective | ||||||
| 19 | date; | ||||||
| 20 | (2) Both the Pipeline and Hazardous Materials Safety | ||||||
| 21 | Administration's new safety standards and the study | ||||||
| 22 | required by subsection (a)(2) have been finalized; or | ||||||
| 23 | (3) The State of Illinois has adopted comprehensive | ||||||
| 24 | legislation regulating the capture, transport, and | ||||||
| 25 | sequestration of carbon dioxide in Illinois, which | ||||||
| 26 | legislation includes, among other things: | ||||||
| |||||||
| |||||||
| 1 | (A) setbacks allowing for the safe evacuation or | ||||||
| 2 | rescue of persons and animals in the event of the | ||||||
| 3 | rupture or leak of a carbon dioxide pipeline; | ||||||
| 4 | (B) specifications limiting the use of eminent | ||||||
| 5 | domain for carbon dioxide pipelines and limiting the | ||||||
| 6 | use of property amalgamation for carbon dioxide | ||||||
| 7 | sequestration; | ||||||
| 8 | (C) the establishment and ongoing funding of an | ||||||
| 9 | emergency fund provided by entities that transport or | ||||||
| 10 | sequester CO2 to ensure first responders are able to | ||||||
| 11 | perform safe and timely evacuations, rescues, and | ||||||
| 12 | other emergency response actions in the event of a | ||||||
| 13 | carbon dioxide release from a pipeline or | ||||||
| 14 | sequestration site; | ||||||
| 15 | (D) mandatory financial assurance to cover the | ||||||
| 16 | cost of monitoring, corrective action, well-plugging, | ||||||
| 17 | and emergency response at sequestration sites, which | ||||||
| 18 | does not take the form of insurance, financial | ||||||
| 19 | guarantees, financial tests, or other self-bonding | ||||||
| 20 | mechanisms; | ||||||
| 21 | (E) expanded monitoring of carbon sequestration | ||||||
| 22 | sites using more methods, and for longer duration, | ||||||
| 23 | than the monitoring required by the U.S. Environmental | ||||||
| 24 | Protection Agency; | ||||||
| 25 | (F) specification of long-term liability in the | ||||||
| 26 | event of a release of brine or carbon dioxide from a | ||||||
| |||||||
| |||||||
| 1 | sequestration site; | ||||||
| 2 | (G) a ban on the use of captured carbon dioxide for | ||||||
| 3 | enhanced oil recovery in Illinois; | ||||||
| 4 | (H) emission limits that ensure that carbon | ||||||
| 5 | capture does not contribute to significant increases | ||||||
| 6 | in emissions of criteria pollutants or hazardous air | ||||||
| 7 | pollutants at facilities from which carbon is captured | ||||||
| 8 | or facilities that power capture; | ||||||
| 9 | (I) a mandate for a greenhouse gas life cycle | ||||||
| 10 | analysis for each facility from which carbon dioxide | ||||||
| 11 | is captured and a prohibition on carbon capture unless | ||||||
| 12 | the company seeking to capture carbon demonstrates | ||||||
| 13 | that the mass of carbon dioxide sequestered from the | ||||||
| 14 | project will be greater than the mass of greenhouse | ||||||
| 15 | gas emissions associated with the lifecycle of | ||||||
| 16 | capture, transport, and storage of that carbon | ||||||
| 17 | dioxide; | ||||||
| 18 | (J) a mandate that alternatives to capture be | ||||||
| 19 | evaluated, including, but not limited to, renewable | ||||||
| 20 | energy, energy efficiency, and battery storage, when | ||||||
| 21 | the capture facility is a power plant; and | ||||||
| 22 | electric-battery powered vehicles when the capture | ||||||
| 23 | facility produces fuel; the evaluation of alternatives | ||||||
| 24 | shall compare the greenhouse gas pollution, water use | ||||||
| 25 | and water quality impacts, air pollution impacts, and | ||||||
| 26 | generation of waste of each alternative to those of | ||||||
| |||||||
| |||||||
| 1 | the proposed capture, transport, and sequestration of | ||||||
| 2 | the CO2; | ||||||
| 3 | (K) robust public participation opportunities for | ||||||
| 4 | all carbon capture, pipeline, and sequestration | ||||||
| 5 | projects in Illinois and public disclosure of all | ||||||
| 6 | documentation; and | ||||||
| 7 | (L) additional protections, potentially including | ||||||
| 8 | prohibition of CO2 pipelines and sequestration | ||||||
| 9 | proximate to drinking water aquifers designated as | ||||||
| 10 | sole source aquifers by the United States | ||||||
| 11 | Environmental Protection Agency. | ||||||
| 12 | Section 20. Repealer. This Act is repealed 4 years after | ||||||
| 13 | its effective date. | ||||||
| 14 | Section 99. Effective date. This Act takes effect upon | ||||||
| 15 | becoming law. | ||||||