| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| 1 | AN ACT concerning education.
| |||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
| 3 | represented in the General Assembly:
| |||||||||||||||||||
| 4 | Section 5. The School Code is amended by adding Section | |||||||||||||||||||
| 5 | 2-3.196 as follows: | |||||||||||||||||||
| 6 | (105 ILCS 5/2-3.196 new) | |||||||||||||||||||
| 7 | Sec. 2-3.196. School ventilation. | |||||||||||||||||||
| 8 | (a)As used in this Section | |||||||||||||||||||
| 9 | "certified assessor" means: | |||||||||||||||||||
| 10 | (1) a certified technician; or | |||||||||||||||||||
| 11 | (2) a person who is certified to perform ventilation | |||||||||||||||||||
| 12 | verification assessments of heating, ventilation and air | |||||||||||||||||||
| 13 | conditioning systems through a certification body | |||||||||||||||||||
| 14 | accredited by the American national standards institute. | |||||||||||||||||||
| 15 | "Certified technician" means a person who is certified as | |||||||||||||||||||
| 16 | a testing and balancing technician by an accredited | |||||||||||||||||||
| 17 | organization; provided that the accreditor of the | |||||||||||||||||||
| 18 | certification organization is approved by the construction | |||||||||||||||||||
| 19 | industries commission. | |||||||||||||||||||
| 20 | "Mechanical engineer" means a professional engineer | |||||||||||||||||||
| 21 | licensed as a mechanical engineer by the state board of | |||||||||||||||||||
| 22 | licensure for professional engineers and professional | |||||||||||||||||||
| 23 | surveyors and who has professional experience with heating, | |||||||||||||||||||
| |||||||
| |||||||
| 1 | ventilation and air conditioning systems. | ||||||
| 2 | "Skilled and trained construction workforce" means a | ||||||
| 3 | workforce in which at least forty percent of the workers are | ||||||
| 4 | graduates of or registered in and attending an apprenticeship | ||||||
| 5 | program registered with the workforce solutions department or | ||||||
| 6 | an apprenticeship program to which the department has granted | ||||||
| 7 | reciprocal approval for the applicable construction | ||||||
| 8 | occupation. | ||||||
| 9 | (b) The State Board shall require all school districts to | ||||||
| 10 | undertake a ventilation verification assessment of all | ||||||
| 11 | mechanical ventilation systems in the school district | ||||||
| 12 | performed by a certified assessor or a mechanical engineer and | ||||||
| 13 | shall be based on physical measurements made during the | ||||||
| 14 | assessment. If an assessment is performed by a certified | ||||||
| 15 | assessor, the assessment report shall be reviewed by a | ||||||
| 16 | mechanical engineer. The ventilation verification assessment | ||||||
| 17 | shall verify whether the existing mechanical ventilation | ||||||
| 18 | system is operating in accordance with design parameters and | ||||||
| 19 | meets the requirements of any applicable building codes. The | ||||||
| 20 | ventilation verification assessment for a heating, ventilation | ||||||
| 21 | and air conditioning system shall include: | ||||||
| 22 | (1) testing for maximum filter efficiency; | ||||||
| 23 | (2) measurements of outside air rate; | ||||||
| 24 | (3) verification of operation of ventilation | ||||||
| 25 | components; | ||||||
| 26 | (4) measurement of all air distribution inlets and | ||||||
| |||||||
| |||||||
| 1 | outlets; | ||||||
| 2 | (5) verification of unit operation and that required | ||||||
| 3 | maintenance has been performed; | ||||||
| 4 | (6) verification of control sequences; | ||||||
| 5 | (7) verification or installation of carbon dioxide | ||||||
| 6 | sensors; and | ||||||
| 7 | (8) collection of field data for the installation of | ||||||
| 8 | mechanical ventilation if none exists. | ||||||
| 9 | (c) The verification assessment report from the mechanical | ||||||
| 10 | engineer shall include appropriate corrective actions needed | ||||||
| 11 | for the mechanical ventilation system or the heating, | ||||||
| 12 | ventilation and air conditioning infrastructure, including | ||||||
| 13 | installation of appropriate filters, installation of carbon | ||||||
| 14 | dioxide sensors and additional maintenance, repairs, upgrades | ||||||
| 15 | or replacement. | ||||||
| 16 | (d) The State Board shall require all school districts to | ||||||
| 17 | make the appropriate corrective actions identified in the | ||||||
| 18 | ventilation verification assessment. These corrective actions | ||||||
| 19 | shall include testing, adjusting and balancing the public | ||||||
| 20 | school mechanical ventilation system and, if necessary or | ||||||
| 21 | cost-effective, shall include repairs, upgrades or replacement | ||||||
| 22 | of the existing heating, ventilation and air conditioning | ||||||
| 23 | system or the installation of a stand-alone mechanical | ||||||
| 24 | ventilation system. The corrective actions identified in the | ||||||
| 25 | ventilation verification assessment may include general | ||||||
| 26 | maintenance, reading and adjustment of ventilation rates, | ||||||
| |||||||
| |||||||
| 1 | filter replacement to meet a minimum efficiency reporting | ||||||
| 2 | value of at least thirteen, carbon dioxide monitor | ||||||
| 3 | installation or whole-system installation or replacement. | ||||||
| 4 | Portable filtration and air cleaners shall be used only if the | ||||||
| 5 | existing heating, ventilation and air conditioning | ||||||
| 6 | infrastructure cannot provide minimum filtration and | ||||||
| 7 | ventilation requirements or, as recommended by a mechanical | ||||||
| 8 | engineer, as a supplemental enhancement to the permanent | ||||||
| 9 | heating, ventilation and air conditioning infrastructure when | ||||||
| 10 | the desired indoor air quality cannot be achieved with the | ||||||
| 11 | mechanical ventilation system or there are concerns with | ||||||
| 12 | outdoor air contaminants such as those created by wildfires | ||||||
| 13 | and pollution. | ||||||
| 14 | (e) School districts shall ensure that all work required | ||||||
| 15 | by the ventilation verification assessment is performed using | ||||||
| 16 | a skilled and trained construction workforce that is in | ||||||
| 17 | compliance with the Construction Industries Licensing Act and | ||||||
| 18 | rules promulgated in accordance with that act. The public | ||||||
| 19 | school facilities authority shall work in consultation with | ||||||
| 20 | the department and the construction industries division of the | ||||||
| 21 | regulation and licensing department to ensure that the | ||||||
| 22 | assessments and construction required by the Public School | ||||||
| 23 | Ventilation Improvement Act meet all standards and | ||||||
| 24 | requirements. | ||||||
| 25 | (f) Upon completion of work, the school district shall | ||||||
| 26 | submit a ventilation verification report to the department. | ||||||
| |||||||
| |||||||
| 1 | The report shall include: | ||||||
| 2 | (1) the name and address of the public school and the | ||||||
| 3 | person preparing and certifying the report; | ||||||
| 4 | (2) the name and address of the certified assessors, | ||||||
| 5 | certified technicians, mechanical engineers and | ||||||
| 6 | contractors who performed verification assessments or | ||||||
| 7 | construction and copies of certifications and licenses; | ||||||
| 8 | (3) a copy of the procurement documents; and | ||||||
| 9 | (4) documentation of: | ||||||
| 10 | (A) initial operating ventilation rate | ||||||
| 11 | verifications; | ||||||
| 12 | (B) adjustments, repairs, upgrades or | ||||||
| 13 | replacements; | ||||||
| 14 | (C) final operating conditions, including the | ||||||
| 15 | minimum efficiency reporting value of the filtration | ||||||
| 16 | system and verified ventilation and exhaust rates for | ||||||
| 17 | classrooms, auditoriums, gymnasiums, restrooms, | ||||||
| 18 | offices and other occupied spaces; | ||||||
| 19 | (D) verification of carbon dioxide monitors, | ||||||
| 20 | including make and model of the monitors; and | ||||||
| 21 | (E) verification that all work has been tested and | ||||||
| 22 | adjusted by certified technicians or mechanical | ||||||
| 23 | engineers. | ||||||
| 24 | (f) The school district shall have a ventilation | ||||||
| 25 | verification assessment performed on all mechanical | ||||||
| 26 | ventilation systems in the school district at least every five | ||||||
| |||||||
| |||||||
| 1 | years. The ventilation verification assessment and the | ||||||
| 2 | ventilation verification reports are public documents and | ||||||
| 3 | shall be available to the public upon request.
| ||||||