SB2180 - 104th General Assembly
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| 1 | AN ACT concerning regulation. | |||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
| 3 | represented in the General Assembly: | |||||||||||||||||||
| 4 | Section 5. The Illinois Gas Pipeline Safety Act is amended | |||||||||||||||||||
| 5 | by adding Section 13 as follows: | |||||||||||||||||||
| 6 | (220 ILCS 20/13 new) | |||||||||||||||||||
| 7 | Sec. 13. Permits; pipeline facility construction notice. | |||||||||||||||||||
| 8 | (a) On and after the effective date of this amendatory Act | |||||||||||||||||||
| 9 | of the 104th General Assembly, any person who has received a | |||||||||||||||||||
| 10 | permit from the United States Pipeline and Hazardous Materials | |||||||||||||||||||
| 11 | Safety Administration or the Federal Energy Regulatory | |||||||||||||||||||
| 12 | Commission must submit a copy of the permit to the Illinois | |||||||||||||||||||
| 13 | Commerce Commission within 2 weeks of the approval of the | |||||||||||||||||||
| 14 | permit. The copy of the permit shall be publicly available on | |||||||||||||||||||
| 15 | the Illinois Commerce Commission's website. | |||||||||||||||||||
| 16 | (b) On and after the effective date of this amendatory Act | |||||||||||||||||||
| 17 | of the 104th General Assembly, any person who intends to | |||||||||||||||||||
| 18 | engage in the transportation of gas via a pipeline facility or | |||||||||||||||||||
| 19 | who owns or operates pipeline facilities shall file with the | |||||||||||||||||||
| 20 | Illinois Commerce Commission a notice prior to the | |||||||||||||||||||
| 21 | construction of a pipeline facility which shall be publicly | |||||||||||||||||||
| 22 | available on the Commission's website. The notice shall | |||||||||||||||||||
| 23 | satisfy the requirements of Section 15 of the Pipeline Safety | |||||||||||||||||||
| |||||||
| |||||||
| 1 | Improvement Act (49 U.S.C. 60132), including: | ||||||
| 2 | (1) geospatial data appropriate for use in the | ||||||
| 3 | National Pipeline Mapping System or data in a format that | ||||||
| 4 | can be readily converted to geospatial data; | ||||||
| 5 | (2) the name and address of the person with primary | ||||||
| 6 | operational control to be identified as the facility's | ||||||
| 7 | operator; | ||||||
| 8 | (3) a means for a member of the public to contact the | ||||||
| 9 | operator for additional information about the pipeline | ||||||
| 10 | facilities the operator operates; and | ||||||
| 11 | (4) any other geospatial or technical data, including | ||||||
| 12 | design and material specifications, that the Commission | ||||||
| 13 | determines are necessary to carry out the purposes of this | ||||||
| 14 | Section. | ||||||
| 15 | The Commission shall give reasonable notice to operators | ||||||
| 16 | of the data that is requested under this subsection. | ||||||
| 17 | Section 99. Effective date. This Act takes effect upon | ||||||
| 18 | becoming law. | ||||||
