SB0195 - 104th General Assembly
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| 1 | AN ACT concerning local government. | |||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
| 3 | represented in the General Assembly: | |||||||||||||||||||
| 4 | Section 5. The Counties Code is amended by adding Section | |||||||||||||||||||
| 5 | 5-12020.5 as follows: | |||||||||||||||||||
| 6 | (55 ILCS 5/5-12020.5 new) | |||||||||||||||||||
| 7 | Sec. 5-12020.5. Commercial wind energy facility light | |||||||||||||||||||
| 8 | mitigating technology. | |||||||||||||||||||
| 9 | (a) As used in this Section: | |||||||||||||||||||
| 10 | "Approval from the FAA" means FAA approval to equip and | |||||||||||||||||||
| 11 | operate light mitigating technology for at least 30% of the | |||||||||||||||||||
| 12 | proposed wind towers included within a commercial wind energy | |||||||||||||||||||
| 13 | facility. | |||||||||||||||||||
| 14 | "Commercial wind energy facility", "facility owner", and | |||||||||||||||||||
| 15 | "wind tower" have the meanings given to those terms in Section | |||||||||||||||||||
| 16 | 5-12020. | |||||||||||||||||||
| 17 | "FAA" means the Federal Aviation Administration of the | |||||||||||||||||||
| 18 | United States Department of Transportation. | |||||||||||||||||||
| 19 | "Light mitigating technology" means a sensor-based system | |||||||||||||||||||
| 20 | that: | |||||||||||||||||||
| 21 | (1) is designed to detect approaching aircraft; | |||||||||||||||||||
| 22 | (2) keeps the lights off when it is safe to do so; and | |||||||||||||||||||
| 23 | (3) the FAA has approved as meeting the requirements | |||||||||||||||||||
| |||||||
| |||||||
| 1 | under Chapter 10 of the FAA's 2020 advisory circular AC | ||||||
| 2 | 70/7460-1M, Obstruction Marking and Lighting. | ||||||
| 3 | (b) Beginning June 1, 2027 and subject to approval from | ||||||
| 4 | the FAA, a county shall require the facility owner of a | ||||||
| 5 | commercial wind energy facility constructed on or after | ||||||
| 6 | January 1, 2021 to install light mitigating technology at the | ||||||
| 7 | commercial wind energy facility. The facility owner, within 6 | ||||||
| 8 | months after the commercial wind energy facility receives a | ||||||
| 9 | determination of no hazard from the FAA, or within 6 months | ||||||
| 10 | after the effective date of this amendatory Act of the 104th | ||||||
| 11 | General Assembly if the commercial wind energy facility | ||||||
| 12 | received a determination of no hazard from the FAA before the | ||||||
| 13 | effective date of this amendatory Act of the 104th General | ||||||
| 14 | Assembly, shall: | ||||||
| 15 | (1) apply to the FAA, any other applicable federal | ||||||
| 16 | agency, or both, for the installation of approved light | ||||||
| 17 | mitigating technology; and | ||||||
| 18 | (2) within 24 months after receiving approval from the | ||||||
| 19 | FAA under paragraph (1), subject to the availability of | ||||||
| 20 | light mitigating technology from the manufacturer or | ||||||
| 21 | supplier, install, test, and commence operation consistent | ||||||
| 22 | with FAA requirements or other applicable federal agency | ||||||
| 23 | requirements, of the light mitigating technology at the | ||||||
| 24 | commercial wind energy facility. | ||||||
| 25 | (c) The facility owner of a commercial wind energy | ||||||
| 26 | facility may seek an extension from the county board from the | ||||||
| |||||||
| |||||||
| 1 | requirements under subsection (b) for a period of up to 24 | ||||||
| 2 | months. The county board shall grant the request if the | ||||||
| 3 | facility owner can demonstrate that, despite the facility | ||||||
| 4 | owner's exercise of commercially reasonable efforts, the | ||||||
| 5 | availability of light mitigating technology constrained the | ||||||
| 6 | facility owner's ability to comply with subsection (b) in the | ||||||
| 7 | time frame afforded. The county board may not impose any | ||||||
| 8 | penalties against the owner or operator under subsection (d) | ||||||
| 9 | during the extension period granted under this subsection. | ||||||
| 10 | (d) A county board may impose civil penalties on the | ||||||
| 11 | facility owner of a commercial wind energy facility that | ||||||
| 12 | failed to comply with the requirements of subsection (b) or | ||||||
| 13 | (c) in the amount of $1,000 per day. Before a civil penalty may | ||||||
| 14 | be imposed under this subsection, the facility owner must | ||||||
| 15 | receive notice of the date the civil penalty will be discussed | ||||||
| 16 | at a county board meeting, and the facility owner, or the | ||||||
| 17 | facility owner's representative, must be provided an | ||||||
| 18 | opportunity to be heard at the board meeting. The State's | ||||||
| 19 | Attorney of the county may file an action in circuit court to | ||||||
| 20 | collect the civil penalty if unpaid in the time required when | ||||||
| 21 | the civil penalty was imposed. | ||||||
| 22 | (e) This Section does not apply to test wind towers | ||||||
| 23 | allowed by a county under subsection (c) of Section 5-12020 | ||||||
| 24 | that are used solely for purposes of research and testing. | ||||||