6 Section 1. The following named amounts, or so much
7 thereof as may be necessary, are appropriated from the
8 Capital Development Fund to the Capital Development Board for
9 the Department of Agriculture for the projects hereinafter
10 enumerated:
11 ILLINOIS STATE FAIRGROUNDS - DU QUOIN
12 For upgrading electrical systems, in
13 addition to funds previously
14 appropriated ................................. $ 1,250,000
15 For upgrading the telecommunications
16 system ....................................... 400,000
17 For upgrading the HVAC system .................. 1,665,000
18 For replacing judges stand and improving
19 track area ................................... 265,000
20 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
21 For completing the Emerson Building renovation,
22 in addition to funds previously
23 appropriated ................................. 1,030,000
24 Total $4,610,000
25 Section 2. The following named amounts, or so much
26 thereof as may be necessary, are appropriated from the
27 Capital Development Fund to the Capital Development Board for
28 the Department of Central Management Services for the
29 projects hereinafter enumerated:
-2- BOB-CDB03
1 JAMES R. THOMPSON CENTER - CHICAGO
2 For rehabilitating exterior columns, in
3 addition to funds previously appropriated .... $ 1,000,000
4 STATEWIDE
5 For replacing roofing systems at the
6 following locations at the approximate
7 costs set forth below ......................... 1,290,000
8 Suburban North Regional Office ......1,100,000
9 Effingham State Garage ................190,000
10 SPRINGFIELD COMPUTER FACILITY - SANGAMON COUNTY
11 For upgrading the computer room and the
12 electrical system ............................ 1,210,000
13 STATE OF ILLINOIS BUILDING - CHICAGO
14 For upgrading the electrical and
15 mechanical systems ........................... 3,260,000
16 For upgrading building security ................ 560,000
17 DIXON STATE GARAGE - LEE COUNTY
18 For upgrading the lighting and
19 replacing the roof ........................... 260,000
20 Total $7,580,000
21 Section 3. The following named amounts, or so much
22 thereof as may be necessary, are appropriated from the
23 Capital Development Fund to the Capital Development Board for
24 the Department of Corrections for the projects hereinafter
25 enumerated:
26 STATEWIDE
27 For upgrading roofing systems at the
28 following locations at the approximate
29 costs set forth below ......................... $ 1,680,000
30 Hardin County Work
31 Camp .................................210,000
32 Illinois Youth Center
-3- BOB-CDB03
1 Joliet .............................1,030,000
2 Pontiac Correctional
3 Center ...............................440,000
4 For replacing windows at the following
5 locations at the approximate costs
6 set forth below, in addition to funds
7 previously appropriated ....................... 7,830,000
8 Dixon Correctional Center ...........1,850,000
9 Illinois Youth Ctr Joliet ............1,730,000
10 Shawnee Correctional Ctr ............4,250,000
11 For upgrading roads and parking lots at the
12 following locations at the approximate
13 costs set forth below ......................... 2,260,000
14 Illinois Youth Center -
15 St. Charles ........................1,260,000
16 Illinois Youth Center -
17 Sheridan ...........................1,000,000
18 CENTRALIA CORRECTIONAL CENTER
19 For upgrading the electrical system, in
20 addition to funds previously appropriated .... 1,600,000
21 DANVILLE CORRECTIONAL CENTER
22 For upgrading the power plant, in
23 addition to funds previously appropriated .... 2,200,000
24 EAST MOLINE CORRECTIONAL CENTER
25 For replacing the cooling tower, in
26 addition to funds previously appropriated .... 400,000
27 For replacing windows, in addition to
28 funds previously appropriated ................ 1,800,000
29 GRAHAM CORRECTIONAL CENTER
30 For upgrading the building automation
31 system, in addition to funds previously
32 appropriated ................................. 900,000
33 KANKAKEE MSU - KANKAKEE COUNTY
34 For upgrading roads and parking lots ........... 120,000
-4- BOB-CDB03
1 For fencing improvements ....................... 865,000
2 MENARD CORRECTIONAL CENTER
3 For replacing the administration building,
4 in addition to funds previously
5 appropriated ................................. 12,300,000
6 TAMMS CORRECTIONAL CENTER
7 Construct bar screen ........................... 590,000
8 Total $32,545,000
9 Section 4. The following named amounts, or so much
10 thereof as may be necessary, are appropriated from the
11 Capital Development Fund to the Capital Development Board for
12 the Historic Preservation Agency for the projects hereinafter
13 enumerated:
14 LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY
15 For providing electrical at
16 campgrounds .................................. $ 120,000
17 LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
18 For replacing the maintenance building,
19 constructing a stable, and relocating
20 sewage system ................................ 1,205,000
21 OLD STATE CAPITOL - SPRINGFIELD
22 For repairing elevators ........................ 405,000
23 Total $1,730,000
24 Section 5. The following named amounts, or so much
25 thereof as may be necessary, are appropriated from the
26 Capital Development Fund to the Capital Development Board for
27 the Illinois Medical District Commission for the projects
28 hereinafter enumerated:
29 ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO
30 For upgrading utility and infrastructure,
31 in addition to funds previously
32 appropriated ................................. $ 1,000,000
-5- BOB-CDB03
1 Total $1,000,000
2 Section 6. The following named amounts, or so much
3 thereof as may be necessary, are appropriated from the
4 Capital Development Fund to the Capital Development Board for
5 the Department of Human Services for the projects hereinafter
6 enumerated:
7 STATEWIDE
8 For replacing and repairing roads and
9 parking lots at the following locations,
10 at the approximate costs set forth
11 below ......................................... $ 2,700,000
12 Alton Mental Health Center -
13 Madison................................600,000
14 Choate Mental Health Center -
15 Anna ..................................700,000
16 Howe Developmental Center -
17 Tinley Park ...........................800,000
18 Ludeman Developmental Center
19 Park Forest ...........................600,000
20 For replacing and repairing roofing systems
21 at the following locations, at the
22 approximate cost set forth below .............. 5,635,000
23 Alton Mental Health Center -
24 Madison ...............................415,000
25 Shapiro Developmental Center -
26 Kankakee ..............................115,000
27 Ludeman Developmental Center -
28 Park Forest ............................25,000
29 Madden Mental Health Center -
30 Hines ...............................2,515,000
31 Murray Developmental Center -
32 Centralia ...........................1,905,000
33 Kiley Developmental Center -
-6- BOB-CDB03
1 Waukegan ..............................660,000
2 FOX DEVELOPMENTAL CENTER - DWIGHT
3 For replacing and repairing interior doors,
4 flooring and walls, in addition to funds
5 previously appropriated ...................... 1,105,000
6 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
7 For renovating the High School Building
8 Phase II ..................................... 1,580,000
9 For renovating the health center ............... 770,000
10 For replacing roof and upgrading the
11 mechanical system at Burns Gym ............... 2,405,000
12 For replacing the visual alert system .......... 800,000
13 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - MORGAN
14 For renovating the Girls' Dormitory, in
15 addition to funds previously appropriated .... 735,000
16 KILEY DEVELOPMENTAL CENTER - WAUKEGAN
17 For converting the facility to natural
18 gas, in addition to funds previously
19 appropriated ................................. 1,135,000
20 LUDEMAN MENTAL HEALTH CENTER - COOK COUNTY
21 For repairing and replacing furnaces and
22 duct work, in addition to funds previously
23 appropriated ................................. 500,000
24 MABLEY DEVELOPMENTAL CENTER - DIXON
25 For replacing mechanicals and upgrading
26 the fire alarm systems ....................... 960,000
27 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
28 For renovating the boiler house,
29 in addition to funds previously
30 appropriated ................................. 2,450,000
31 For replacing the emergency
32 management system, in
33 addition to funds previously
-7- BOB-CDB03
1 appropriated ................................. 585,000
2 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
3 For replacing the sewer system in
4 south campus ................................. 2,150,000
5 For planning and beginning renovation
6 of dietary ................................... 500,000
7 For work necessary to remedy fire
8 damper deficiencies .......................... 1,515,000
9 For upgrading roads and parking lots ........... 5,870,000
10 SINGER MENTAL HEALTH CENTER - ROCKFORD
11 For renovating dietary and stores .............. 1,900,000
12 Total $33,295,000
13 Section 7. The following named amounts, or so much
14 thereof as may be necessary, are appropriated from the
15 Capital Development Fund to the Capital Development Board for
16 the Department of Military Affairs for the projects
17 hereinafter enumerated:
18 CAIRO ARMORY
19 For replacing roof and renovating the
20 interior and exterior ........................ $ 1,356,000
21 ELGIN ARMORY
22 For upgrading the interior and exterior ........ 897,000
23 LITCHFIELD ARMORY
24 For remodeling and installing a
25 kitchen ...................................... 517,000
26 MATTOON ARMORY
27 For replacing the roof and renovating
28 the interior and exterior .................... 992,000
29 MONMOUTH ARMORY
30 For replacing the roof and renovating
31 the interior and exterior .................... 859,000
32 SALEM ARMORY
33 For remodeling and installing a
-8- BOB-CDB03
1 kitchen ...................................... 486,000
2 SYCAMORE ARMORY
3 For replacing the electrical system,
4 renovating the interior and installing
5 air conditioning ............................. 1,707,000
6 Total $6,814,000
7 Section 8. The following named amounts, or so much
8 thereof as may be necessary, are appropriated from the
9 Capital Development Fund to the Capital Development Board for
10 the Department of Natural Resources for the projects
11 hereinafter enumerated:
12 STATEWIDE
13 For replacing/repairing the roofing systems
14 at the following locations at the approximate
15 costs set forth below ......................... $ 240,000
16 Jubilee College State
17 Park-Peoria County ....................45,000
18 Starved Rock State Park &
19 Lodge-LaSalle County ..................60,000
20 Kaskaskia River Fish & Wildlife
21 Area-Randolph County ..................25,000
22 Pyramid State Park-
23 Perry County ..........................55,000
24 Region V Office (Benton)
25 Franklin County .......................55,000
26 For rehabilitating dams and bridges ............ 1,000,000
27 EAGLE CREEK STATE PARK - SHELBY COUNTY
28 For constructing lake access boat
29 docks at resort .............................. 2,000,000
30 FOX RIDGE STATE PARK - COLES COUNTY
31 For replacing spillway ......................... 160,000
32 GOLCONDA MARINA
-9- BOB-CDB03
1 For planning and construction of
2 marina expansion ............................. 1,915,000
3 GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY
4 For replacing floating boardwalk ............... 485,000
5 HENNEPIN CANAL PARKWAY STATE PARK
6 For rehabilitating/repairing railroad
7 bridges, in addition to funds
8 previously appropriated ...................... 900,000
9 ILLIANA HEIGHTS SWAMP - KANKAKEE COUNTY
10 For improving DuPage River Spillway ............ 110,000
11 ILLINOIS BEACH STATE PARK - LAKE COUNTY
12 For redeveloping North Unit Service
13 Area ......................................... 4,860,000
14 IROQUOIS COUNTY CONSERVATION AREA
15 For improving check station/concession
16 building ..................................... 680,000
17 KANKAKEE WILDLIFE CONSERVATION AREA - KANKAKEE COUNTY
18 For planning and constructing new
19 lodge, in addition to funds
20 previously appropriated ...................... 3,500,000
21 KICKAPOO STATE PARK - VERMILLION COUNTY
22 For replacing stairway to Long Pond ............ 230,000
23 MINE RESCUE STATION - SPRINGFIELD
24 For replacing HVAC system ...................... 125,000
25 RED HILLS STATE PARK - LAWRENCE COUNTY
26 For miscellaneous improvements ................. 850,000
27 SAM PARR STATE PARK - JASPER COUNTY
28 For renovating recreational facilities ......... 1,915,000
29 SILOAM SPRINGS STATE PARK - ADAMS COUNTY
30 For rehabilitating office/service
31 area ......................................... 1,200,000
32 SNAKEDEN HOLLOW FISH AND WILDLIFE AREA - KNOX COUNTY
33 For rehabilitating the Spillway, in
34 addition to funds previously
-10- BOB-CDB03
1 appropriated ................................. 100,000
2 SPRING LAKE CONSERVATION AREA - TAZEWELL COUNTY
3 For stabilizing levee and
4 shoreline .................................... 500,000
5 VOLO BOG NATURAL AREA - LAKE COUNTY
6 For replacing floating boardwalk and
7 deck ......................................... 1,765,000
8 WELDON SPRINGS STATE PARK - DE WITT COUNTY
9 For upgrading residence utilities .............. 40,000
10 For improving campgrounds, in addition to
11 funds previously appropriated ................ 695,000
12 WHITE PINES FOREST STATE PARK - OGLE COUNTY
13 For planning and beginning sewer system
14 replacement .................................. 100,000
15 Total $23,370,000
16 Section 9. The following named amounts, or so much
17 thereof as may be necessary, are appropriated from the
18 Capital Development Fund to the Capital Development Board for
19 the Department of Revenue for the projects hereinafter
20 enumerated:
21 WILLARD ICE BUILDING - SPRINGFIELD
22 For replacing and repairing concrete
23 stairway and completing of parking
24 deck, in addition to funds
25 previously appropriated ...................... $ 285,000
26 For upgrading fire and voice activated
27 alarm system ................................. 1,010,000
28 For replacing dock exhaust system .............. 560,000
29 For upgrading building management
30 controls ..................................... 3,545,000
31 Total $5,400,000
32 Section 10. The following named amounts, or so much
-11- BOB-CDB03
1 thereof as may be necessary, are appropriated from the
2 Capital Development Fund to the Capital Development Board for
3 the Department of State Police for the projects hereinafter
4 enumerated:
5 PESOTUM - DISTRICT 10
6 For replacing the sewer and septic
7 systems ...................................... $ 125,000
8 SPRINGFIELD - DISTRICT 9
9 For replacing the HVAC systems and
10 upgrading the electrical system .............. 733,000
11 Total $858,000
12 Section 11. The following named amounts, or so much
13 thereof as may be necessary, are appropriated from the
14 Capital Development Fund to the Capital Development Board for
15 the Department of Veterans' Affairs for the projects
16 hereinafter enumerated:
17 MANTENO VETERANS HOME
18 For replacing condensing units ................. $ 375,000
19 For upgrading or constructing
20 roads and parking lots ....................... 635,000
21 For planning and constructing
22 additional storage and support areas ......... 1,365,000
23 ANNA VETERANS HOME
24 For constructing a garage ...................... 325,000
25 QUINCY VETERANS HOME - ADAMS COUNTY
26 For constructing a bus and ambulance
27 garage ....................................... 900,000
28 Total $3,600,000
29 Section 12. The following named amounts, or so much
30 thereof as may be necessary, are appropriated from the
31 Capital Development Fund to the Capital Development Board for
32 the Courts of Illinois for the projects hereinafter
-12- BOB-CDB03
1 enumerated:
2 SUPREME COURT BUILDING - SPRINGFIELD
3 For replacing the roofing system, in addition
4 to funds previously appropriated ............. $ 170,000
5 For upgrading the air conditioning and
6 heating systems .............................. 350,000
7 APPELLATE COURT THIRD DISTRICT - OTTAWA
8 For renovating the annex interior .............. 315,000
9 Total $835,000
10 Section 13. The following named amounts, or so much
11 thereof as may be necessary, are appropriated from the
12 Capital Development Fund to the Capital Development Board for
13 the Office of the Secretary of State for the projects
14 hereinafter enumerated:
15 CAPITOL BUILDING - SPRINGFIELD
16 For upgrading the HVAC systems, in
17 addition to funds previously
18 appropriated ................................. $ 6,440,000
19 CAPITOL COMPLEX - SPRINGFIELD
20 For asbestos abatement ......................... 1,000,000
21 WILLIAM G. STRATTON BUILDING - SPRINGFIELD
22 For renovating the Stratton Office
23 Building, in addition to funds
24 previously appropriated ...................... 5,970,000
25 DRIVER'S FACILITY WEST - CHICAGO
26 For renovating the building .................... 855,000
27 Total $14,265,000
28 Section 14. The following named amounts, or so much
29 thereof as may be necessary, are appropriated from the
30 Capital Development Fund to the Capital Development Board for
31 the Illinois Board of Higher Education for the projects
32 hereinafter enumerated:
-13- BOB-CDB03
1 STATEWIDE
2 For miscellaneous capital improvements
3 including construction, capital
4 facilities, cost of planning, supplies,
5 equipment, materials, services and
6 all other expenses required to complete
7 the work at the various universities
8 This appropriated amount shall be in
9 addition to any other appropriated amounts
10 which can be expended for these purposes...... $ 20,000,000
11 Chicago State University .............322,100
12 Eastern Illinois University ..........515,500
13 Governors State University ...........189,700
14 Illinois State University ..........1,021,300
15 Northeastern Illinois
16 University ..........................383,700
17 Northern Illinois University .......1,159,000
18 Western Illinois University ..........792,200
19 Southern Illinois University -
20 Carbondale ........................1,625,000
21 Southern Illinois University -
22 Edwardsville ........................763,100
23 University of Illinois -
24 Chicago ...........................2,777,300
25 University of Illinois -
26 Springfield .........................229,100
27 University of Illinois -
28 Urbana/Champaign ..................4,150,300
29 Illinois Community
30 College Board .....................6,071,700
31 UNIVERSITY CENTER OF LAKE COUNTY
32 For constructing a university center and
33 purchasing equipment, in addition to
-14- BOB-CDB03
1 funds previously appropriated ................ 8,000,000
2 LAKELAND COLLEGE
3 Student Services Building addition ............. 6,721,600
4 ILLINOIS MATH AND SCIENCE ACADEMY
5 For constructing a mezzanine level in
6 east gymnasium and purchasing equipment,
7 in addition to funds previously
8 appropriated ................................. 5,943,800
9 UNIVERSITY OF ILLINOIS AT CHAMPAIGN-URBANA
10 Expansion of Microelectronics Lab .............. 18,000,000
11 UNIVERSITY OF ILLINOIS AT CHICAGO
12 Plan, construct, and equip the Chemical
13 Sciences Building ............................ 57,600,000
14 WESTERN ILLINOIS UNIVERSITY
15 Plan and construct Convocation Center .......... 4,000,000
16 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
17 For renovating and constructing an
18 addition to the Morris Library, in
19 addition to funds previously
20 appropriated ................................. 25,690,000
21 Total $145,955,400
22 STATE BOARD OF EDUCATION
23 Section 15. The sum of $70,000,000, or so much thereof
24 as may be necessary, is appropriated from the School
25 Construction Fund to the Capital Development Board for school
26 construction grants pursuant to the School Construction Law,
27 in addition to amounts previously appropriated for such
28 purposes.
29 Section 16. The sum of $25,000,000, or so much thereof
30 as may be necessary, is appropriated from the Capital
31 Development Fund to the Board of Trustees of the University
32 of Illinois to plan and construct an Education and Research
-15- BOB-CDB03
1 facility for the College of Medicine in Chicago, including
2 planning, land acquisition, demolition, construction,
3 remodeling, landscaping, site improvements, equipment,
4 extension or modification of campus utility systems,
5 relocation of programs, and such expenses as may be necessary
6 to complete the facility. This appropriation is in addition
7 to funds previously appropriated.
8 Section 17. The sum of $55,000,000, or so much thereof
9 as may be necessary, is appropriated from the Capital
10 Development Fund to the Capital Development Board for the use
11 by the Department of Central Management Services for the
12 acquisition of real property and related expenses in and
13 around the Capitol Complex, in Springfield, Illinois, the
14 purchase price to be set at fair market value, as determined
15 by independent appraisal, pre-existing option, exercise of
16 right of first refusal or other appropriate means of
17 determining fair market value when the acquisition of such
18 property is deemed by the Director of the Department of
19 Central Management Services to be in the best interest of the
20 state.
21 Section 18. The sum of $2,992,000, or so much thereof as
22 may be necessary, is appropriated from the Capital
23 Development Fund to the Board of Trustees of Northeastern
24 Illinois University to purchase equipment and remodel
25 buildings A, B and E. This appropriation is in addition to
26 any funds previously appropriated.
27 Section 19. The sum of $6,000,000, or so much thereof as
28 may be necessary, is appropriated from the Capital
29 Development Fund to the Board of Trustees of Eastern Illinois
30 University to purchase equipment, renovate and expand Fine
31 Arts Center. This appropriation is in addition to any funds
-16- BOB-CDB03
1 previously appropriated.
2 Section 20. The sum of $2,400,000, or so much thereof as
3 may be necessary, is appropriated from the Capital
4 Development Fund to the Board of Trustees of Chicago State
5 University to purchase equipment to complete the construction
6 the the Convocation Center. This appropriation is in
7 addition to any funds previously appropriated.
8 Section 21. The sum of $3,944,000, or so much thereof as
9 may be necessary, is appropriated from the Capital
10 Development Fund to the Board of Trustees of Northern
11 Illinois University to purchase equipment for the College of
12 Business Building (Barsema Hall). This appropriation is in
13 addition to any funds previously appropriated.
14 Section 22. The sum of $800,000, or so much thereof as
15 may be necessary, is appropriated from the Capital
16 Development Fund to the Board of Trustees of Southern
17 Illinois University at Carbondale to purchase equipment for
18 Altgeld Hall and the Old Baptist Foundation Building. This
19 appropriation is in addition to any funds previously
20 appropriated.
21 Section 23. The sum of $15,000,000, or so much thereof
22 as may be necessary, is appropriated from the Capital
23 Development Fund to the Board of Trustees of the University
24 of Illinois to plan and construct a Classroom and Office
25 Building at the Springfield Campus and related utility
26 systems, including planning, land acquisition, demolition,
27 construction, remodeling, landscaping, site improvements,
28 equipment, extension or modification of campus utility
29 systems, and such expenses as may be necessary to complete
30 the facility. This appropriation is in addition to funds
-17- BOB-CDB03
1 previously appropriated.
2 Section 24. The sum of $3,600,000, or so much thereof as
3 may be necessary, is appropriated from the Capital
4 Development Fund to the Capital Development Board for
5 miscellaneous capital improvements at various educational
6 facilities statewide, in addition to funds previously
7 appropriated.
8 ARTICLE 1a
9 Section 1. The following named amounts, or so much
10 thereof as may be necessary and remain unexpended at the
11 close of business on June 30, 2002, from appropriations and
12 reappropriations heretofore made for such purposes in Article
13 56, Section 1, and Article 56a, Section 1 of Public Act 92-8,
14 are reappropriated from the Capital Development Fund to the
15 Capital Development Board for the Department of Agriculture
16 for the projects hereinafter enumerated:
17 DUQUOIN STATE FAIRGROUNDS
18 (From Article 56, Section 1 of Public Act 92-8)
19 For replacing horse barn roofs ................. 293,137
20 For upgrading electrical utilities, in
21 addition to funds previously
22 appropriated ................................. 700,000
23 (From Article 56a, Section 1 of Public Act 92-8)
24 For upgrading electrical utilities ............. 105,800
25 For constructing a multi-purpose
26 building ..................................... 7,914,200
27 For constructing livestock
28 facilities ................................... 15,544
29 For upgrading the racetrack, including the
30 racetrack walls .............................. 59,767
-18- BOB-CDB03
1 GALESBURG DIAGNOSTIC LABORATORY
2 For purchasing the facility .................... 3,200,000
3 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
4 (From Article 56, Section 1 of Public Act 92-8)
5 For renovating comfort stations, in addition
6 to funds previously appropriated ............. 1,100,000
7 For upgrading the electrical system ............ 966,300
8 For renovating the grandstand area ............. 1,114,363
9 (From Article 56a, Section 1 of Public Act 92-8)
10 For renovating or replacing racehorse
11 barns - Phase IV ............................. 1,646,366
12 For renovating the Emmerson Building ........... 1,704,240
13 For renovating or replacing #26 Barn ........... 775,773
14 For completing the HVAC system in the
15 Administration Building, in addition to
16 funds previously appropriated ................ 119,129
17 For renovating the Junior Home Economics
18 Building ..................................... 1,020,702
19 For replacing and repairing roofs,
20 Phase II ..................................... 37,964
21 For installing HVAC system and
22 restrooms in the Orr Building ................ 228,211
23 For designing and constructing a complex to
24 accommodate various outdoor events,
25 including site development, utilities,
26 permanent grandstands and portable
27 bleachers, support facilities, vehicle
28 and pedestrian access and related
29 work ......................................... 136,075
30 For replacing and renovating
31 racehorse barns (Phase II) ................... 79,840
32 For replacing and rehabilitating roofs ......... 9,070
33 Total, Section 1 $21,226,481
-19- BOB-CDB03
1 Section 1a. The following named amount, or so much
2 thereof as may be necessary and remains unexpended at the
3 close of business on June 30, 2002, from an appropriation
4 heretofore made for such purposes in Article 56, Section 1.1
5 of Public Act 92-8, as amended, is reappropriated from the
6 Tobacco Settlement Recovery Fund to the Capital Development
7 Board for the Department of Agriculture for the project
8 hereinafter enumerated:
9 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
10 (From Article 56, Section 1.1 of Public Act 92-8)
11 For upgrading the chemistry/seed
12 laboratory systems ........................... $ 344,000
13 Total $344,000
14 Section 2. The following named amounts, or so much
15 thereof as may be necessary and remain unexpended at the
16 close of business on June 30, 2002, from appropriations and
17 reappropriations heretofore made for such purposes in Article
18 56, Section 12 and Article 56a, Section 2 of Public Act 92-8,
19 as amended, are reappropriated from the Capital Development
20 Fund to the Capital Development Board for the Courts of
21 Illinois for the projects hereinafter enumerated:
22 MT. VERNON APPELLATE COURT BUILDING
23 (From Article 56a, Section 2 of Public Act 92-8, as amended)
24 For expanding the courthouse ................... $ 1,531,730
25 For expanding the courthouse, in
26 addition to funds previously
27 appropriated ................................. 792,000
28 SPRINGFIELD - SUPREME COURT BUILDING
29 For replacing the roof ......................... 605,149
30 For renovating the HVAC system on
31 the 3rd Floor ................................ 140,000
-20- BOB-CDB03
1 For installing humidifier and water
2 filtration systems ........................... 1,570,950
3 For upgrading the library, in
4 addition to funds previously appropriated .... 61,815
5 For replacing plumbing system .................. 159,638
6 APPELLATE COURT SECOND DISTRICT - ELGIN
7 (From Article 56, Section 12 of Public Act 92-8)
8 For miscellaneous improvements ................. 539,784
9 Total, Section 2 $5,401,066
10 Section 2.1. The following named amounts, or so much
11 thereof as may be necessary and remain unexpended at the
12 close of business on June 30, 2002, from reappropriations
13 heretofore made for such purposes in Article 56a, Section 2.1
14 of Public Act 92-8, are reappropriated from the General
15 Revenue Fund to the Capital Development Board for the
16 projects hereinafter enumerated:
17 SUPREME COURT BUILDING - SPRINGFIELD
18 (From Article 56a, Section 2.1 of Public Act 92-8)
19 For tuckpointing and cleaning exterior ......... 34,698
20 Total, Section 2.1 $34,698
21 Section 2a. The following named amounts, or so much
22 thereof as may be necessary and remain unexpended at the
23 close of business on June 30, 2002, from appropriations and
24 reappropriations heretofore made in Article 56, Section 12.1
25 and Article 56a, Section 2a of Public Act 92-8, are
26 reappropriated from the Tobacco Settlement Recovery Fund to
27 the Capital Development Board for the Courts of Illinois for
28 the projects hereinafter enumerated:
29 APPELLATE COURT BUILDING - ELGIN
30 (From Article 56a, Section 2a of Public Act 92-8)
-21- BOB-CDB03
1 For various improvements, in addition
2 to funds previously appropriated ............. $ 42,430
3 For replacing S-2 air conditioning unit ........ 159,386
4 APPELLATE COURT THIRD DISTRICT - OTTAWA
5 (From Article 56, Section 12.1 of Public Act 92-8)
6 For tuckpointing, repairing the exterior
7 and replacing the roof, in addition to
8 funds previously appropriated ................ 191,600
9 Total, Section 2a $393,416
10 Section 3. The following named amounts, or so much
11 thereof as may be necessary and remain unexpended at the
12 close of business on June 30, 2002, from appropriations and
13 reappropriations heretofore made in Article 56, Section 13
14 and Article 56a, Section 3 of Public Act 92-8, approved May
15 17, 2000, are reappropriated from the Capital Development
16 Fund to the Capital Development Board for the Office of the
17 Secretary of State for the projects hereinafter enumerated:
18 WILLIAM G. STRATTON BUILDING - SPRINGFIELD
19 (From Article 56a, Section 3 of Public Act 92-8)
20 For replacing windows and tuckpointing ......... $ 5,862,943
21 CAPITOL COMPLEX - SPRINGFIELD
22 (From Article 56, Section 13 of Public Act 92-8)
23 For completing the stone restoration, in
24 addition to funds previously appropriated .... 3,000,000
25 (From Article 56a, Section 3 of Public Act 92-8)
26 For upgrading electrical lighting and replacing
27 ceilings - Stratton Office Building .......... 5,354,508
28 For replacing mechanical piping - Klein
29 and Mason Warehouse........................... 58,850
30 For renovating the exterior of the Capitol
31 and Howlett Buildings ........................ 741,484
32 For demolition of 222 S. College,
-22- BOB-CDB03
1 and landscaping of Capitol Complex
2 in addition to funds previously
3 appropriated ................................. 1,200,000
4 For demolition of 222 South College
5 Building and landscaping of
6 Capitol Complex .............................. 2,387,894
7 STATE POWER PLANT - SPRINGFIELD
8 (From Article 56, Section 13 of Public Act 92-8)
9 For installing new water service and
10 repairing power plant systems ................ 80,000
11 STATEWIDE
12 (From Article 56, Section 13 of Public Act 92-8)
13 For replacing windows at the following
14 locations at the approximate cost set
15 forth below ................................... 1,705,969
16 Lexington Avenue Motor
17 Vehicle Facility .....................583,000
18 Martin Luther King, Jr. Dr.
19 Motor Vehicle Facility ...............583,000
20 North Elston Motor
21 Vehicle Facility .....................584,000 ____________
22 Total, Section 3 $20,391,648
23 Section 3.2. The sum of $8,300,000, or so much thereof
24 as may be necessary, and remains unexpended at the close of
25 business on June 30, 2002, from a reappropriation heretofore
26 made in Public Act 92-8, Article 56a, Section 3.2 is
27 reappropriated from the Capital Development Fund to the
28 Capital Development Board for the Office of the Secretary of
29 State to construct a parking garage.
30 Section 4. The following named amounts, or so much
31 thereof as may be necessary and remain unexpended at the
32 close of business on June 30, 2002, from appropriations and
-23- BOB-CDB03
1 reappropriations heretofore made for such purposes in Article
2 56, Section 2 and Article 56a, Section 4 of Public Act 92-8,
3 are reappropriated from the Capital Development Fund to the
4 Capital Development Board for the Department of Central
5 Management Services for the projects hereinafter enumerated:
6 JAMES R. THOMPSON CENTER - CHICAGO
7 (From Article 56, Section 2 of Public Act 92-8)
8 For upgrading mechanical systems, in
9 addition to funds previously appropriated..... $ 1,400,000
10 (From Article 56a, Section 4 of Public Act 92-8)
11 For upgrading mechanical systems ............... 1,403,062
12 MEDICAL CENTER (DCFS DISTRICT OFFICE) - CHICAGO
13 For replacing roof and upgrading
14 mechanical and electrical systems ............ 1,174,589
15 PARIS STATE GARAGE
16 (From Article 56, Section 2 of Public Act 92-8)
17 For replacing the roof and improving
18 the exterior .................................. 380,000
19 PEORIA REGIONAL OFFICE BUILDING - PEORIA COUNTY
20 (From Article 56a, Section 4 of Public Act 92-8)
21 For rehabilitating the HVAC system ............. 123,841
22 ROCKFORD REGIONAL OFFICE BUILDING
23 For upgrading utilities ........................ 80,000
24 SPRINGFIELD STATE GARAGE
25 For renovating the interior of the
26 central garage ............................... 553,953
27 RESEARCH AND COLLECTION CENTER - SPRINGFIELD
28 For expanding surplus warehouse ................ 3,043,289
29 ELGIN REGIONAL OFFICE BUILDING
30 For replacing the utility system ............... 684,281
31 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
32 ROOSEVELT ROAD - CHICAGO
33 For upgrading electrical systems ............... 898,048
-24- BOB-CDB03
1 For converting and renovating tub rooms ........ 221,816
2 For upgrading the HVAC system .................. 152,189
3 ILLINOIS CENTER FOR REHABILITATION AND
4 EDUCATION (WOOD) - CHICAGO
5 For upgrading fire and safety systems .......... 320,350
6 STATE OF ILLINOIS BUILDING - CHICAGO
7 For restoring exterior and rebuilding
8 foundation ................................... 1,540,901
9 OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER
10 For planning and beginning the renovation
11 of the facility .............................. 1,952,304
12 SUBURBAN NORTH REGIONAL OFFICE BUILDING -
13 DES PLAINES
14 (From Article 56, Section 2 of Public Act 92-8)
15 For planning and beginning
16 rehabilitation of the exterior and
17 upgrading the atrium ......................... 400,000
18 (From Article 56a, Section 4 of Public Act 92-8)
19 For renovating offices for Environmental
20 Protection Agency, in addition to funds
21 previously appropriated ...................... 428,471
22 For renovation of Suburban North Regional
23 Office Building (formerly Maine Township
24 North High School building), in addition
25 to funds previously appropriated for such
26 purpose, Phase III ........................... 102,803
27 OTTAWA STATE GARAGE
28 For replacing state garage ..................... 1,334,504
29 COMPUTER FACILITY - SPRINGFIELD
30 For installing a cooling tower and fire alarm
31 system and various other improvements ........ 397,846
32 For replacement of the halon fire
33 suppression system ........................... 18,598
34 ASH STREET COMPLEX -
-25- BOB-CDB03
1 MUSEUM AND COLLECTION CENTER -
2 SPRINGFIELD
3 For replacement of the roofing system .......... 167,781
4 MARION REGIONAL OFFICE BUILDING
5 For replacing HVAC system and interior
6 lighting ..................................... 149,513
7 For construction of a Regional Office
8 Building Addition ............................ 282,513
9 SPRINGFIELD REGIONAL OFFICE BUILDING
10 For replacing the potable water system ......... 483,924
11 For upgrading the parking lot .................. 56,063
12 Total, Section 4 $17,750,639
13 Section 4.1. The following named amounts, or so much
14 thereof as may be necessary and remain unexpended at the
15 close of business on June 30, 2002, from reappropriations
16 heretofore made for such purposes in Article 56a, Section 4.1
17 of Public Act 91-8, are reappropriated from the General
18 Revenue Fund to the Capital Development Board for the
19 Department of Central Management Services for the projects
20 hereinafter enumerated:
21 JAMES R. THOMPSON CENTER - CHICAGO
22 (From Article 56a, Section 4.1 of Public Act 92-8)
23 For restoring the exterior plaza ............... $ 78,933
24 CHICAGO MEDICAL CENTER - OFFICE AND LABORATORY
25 For rehabilitating exterior .................... 214,884
26 CHICAGO MEDICAL CENTER
27 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
28 For rehabilitating the pool area ............... 98,956
29 STATE OF ILLINOIS BUILDING - CHICAGO
30 For restoring exterior limestone and
31 masonry ...................................... 145,985
32 Total, Section 4.1 $538,758
-26- BOB-CDB03
1 Section 4a. The following named amounts, or so much
2 thereof as may be necessary and remain unexpended at the
3 close of business on June 30, 2002, from appropriations
4 heretofore made for such purposes in Article 56, Section 2.1
5 and Article 56a, Section 4a of Public Act 92-8, are
6 reappropriated from the Tobacco Settlement Recovery Fund to
7 the Capital Development Board for the Department of Central
8 Management Services for the projects hereinafter enumerated:
9 CHICAGO-READ - MEMORIAL CEMETERY
10 (From Article 56a, Section 4a of Public Act 92-8)
11 For upgrading site ............................. $ 92,177
12 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
13 (ROOSEVELT ROAD) - CHICAGO
14 (From Article 56, Section 2.1 of Public Act 92-8)
15 For tuckpointing exterior ...................... 1,027,900
16 (From Article 56a, Section 4a of Public Act 92-8)
17 For upgrading lighting & paging systems ........ 125,000
18 For constructing a parking lot ................. 457,846
19 Total, Section 4a $1,702,923
20 Section 5. The following named amounts, or so much
21 thereof as may be necessary and remain unexpended at the
22 close of business on June 30, 2002, from appropriations and
23 reappropriations heretofore made for such purposes in Article
24 56, Section 8, and Article 56a, Section 5 of Public Act 92-8,
25 are reappropriated from the Capital Development Fund to the
26 Capital Development Board for the Department of Natural
27 Resources for the projects hereinafter enumerated:
28 BABE WOODYARD STATE NATURAL AREA -
29 VERMILION COUNTY
30 (From Article 56a, Section 5 of Public Act 92-8)
31 For developing the site and associated
-27- BOB-CDB03
1 land acquisition ............................. $ 2,820,959
2 BEAVER DAM STATE PARK - MACOUPIN COUNTY
3 (From Article 56, Section 8 of Public Act 92-8)
4 For replacing the sewage system ................ 665,000
5 (From Article 56a, Section 5 of Public Act 92-8)
6 For rehabilitating dams, spillway, and
7 boat access facilities ....................... 369,611
8 CARLYLE LAKE STATE PARKS
9 For cabin construction and site
10 improvements at Eldon
11 Hazlet State Park, Phase II .................. 1,395,470
12 For road and site improvements at
13 Carlyle Lake ................................. 1,500,000
14 For infrastructure and site
15 improvements at Carlyle Lake ................. 2,617,312
16 CASTLE ROCK STATE PARK - OGLE COUNTY
17 (From Article 56, Section 8 of Public Act 92-8)
18 For rehabilitating the scenic
19 overlook and water system .................... 1,776,901
20 (From Article 56a, Section 5 of Public Act 92-8)
21 For replacing maintenance building ............. 279,011
22 CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
23 For upgrading sewage treatment system .......... 990,847
24 For construction of a concession building
25 and upgrading the horse concession, in
26 addition to funds previously appropriated .... 18,554
27 ELDON HAZLET STATE PARK - CLINTON COUNTY
28 (From Article 56, Section 8 of Public Act 92-8)
29 For replacing the main waterline ............... 536,231
30 FORT MASSAC STATE PARK - MASSAC COUNTY
31 (From Article 56a, Section 5 of Public Act 92-8)
32 For reconstructing the fort .................... 4,116,053
33 GEOLOGICAL SURVEY-CHAMPAIGN
34 For constructing two pole
-28- BOB-CDB03
1 storage buildings ............................ 290,961
2 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
3 For rehabilitating aqueducts
4 #3, #4 and #8 ................................ 713,581
5 For stabilizing the feeder canal bank .......... 44,484
6 For replacement and rehabilitation
7 of arch culverts and canal ................... 62,483
8 HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY
9 For dam rehabilitation and the State's share
10 to implement the ecological restoration
11 plan in cooperation with the U.S.
12 Army Corps of Engineers, and
13 land acquisition ............................. 858,655
14 For construction of a pole building
15 and hunter check station ..................... 41,284
16 ILLINOIS BEACH STATE PARK - LAKE COUNTY
17 For replacing sanitary sewer line .............. 545,300
18 For rehabilitating lodge entrance .............. 18,422
19 For constructing an office building ............ 20,966
20 For replacing sanitary sewer lines ............. 457,978
21 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
22 For upgrading campground electrical ............ 35,380
23 For rehabilitation of the concession
24 building, in addition to funds
25 previously appropriated ...................... 62,818
26 For rehabilitation of the concession building .. 23,314
27 KANKAKEE RIVER STATE PARK - KANKAKEE/WILL COUNTIES
28 For constructing sanitary sewer system, in
29 addition to funds previously appropriated .... 5,000,000
30 KANKAKEE STATE PARK - KANKAKEE COUNTY
31 For planning and constructing a
32 sanitary sewer system ........................ 80,854
33 KASKASKIA RIVER FISH & WILDLIFE AREA
34 For providing electrical service ............... 44,123
-29- BOB-CDB03
1 KICKAPOO STATE PARK - VERMILION COUNTY
2 For rehabilitating the water
3 system and day-use areas ..................... 978,520
4 LAKE LE-AQUA-NA STATE PARK - STEPHENSON COUNTY
5 For replacing sewage treatment plant ........... 359,672
6 LAKE MURPHYSBORO STATE PARK - JACKSON COUNTY
7 For replacing the district office
8 building ..................................... 471,352
9 LINCOLN TRAIL STATE RECREATION AREA - CLARK COUNTY
10 For renovating the concession
11 building ..................................... 765,125
12 For upgrading campground electrical
13 and drainage ................................. 460,000
14 For rehabilitating the day use area
15 and site ..................................... 1,163,909
16 LITTLE GRASSY FISH HATCHERY - WILLIAMSON COUNTY
17 For improving drainage discharge ............... 98,702
18 MASON STATE FOREST TREE NURSERY
19 For expanding the cold storage facility ........ 579,424
20 For expanding the seed cleaning facility ....... 662,000
21 MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
22 For rehabilitating levee and well, in
23 addition to funds previously appropriated .... 266,028
24 MORAINE HILLS STATE PARK - MCHENRY COUNTY
25 For renovation of the trail .................... 86,975
26 For replacement of restrooms and upgrading
27 the water system ............................. 82,922
28 MORAINE VIEW STATE PARK - MCLEAN COUNTY
29 (From Article 56, Section 8 of Public Act 92-8)
30 For upgrading the water plant .................. 180,000
31 MORRISON-ROCKWOOD STATE PARK
32 (From Article 56a, Section 5 of Public Act 92-8)
33 For improving the water system and
34 rehabilitating the campground water .......... 406,998
-30- BOB-CDB03
1 NATURAL HISTORY SURVEY - HAVANA
2 For renovating Forbes Biological Station ....... 451,366
3 NORTH POINT MARINA - LAKE COUNTY
4 For construction of a breakwater structure ..... 1,012,492
5 PERE MARQUETTE STATE PARK - JERSEY COUNTY
6 (From Article 56, Section 8 of Public Act 92-8)
7 For upgrading youth camp sewer system .......... 140,000
8 (From Article 56a, Section 5 of Public Act 92-8)
9 PRAIRIE RIDGE SANCTUARY NATURAL AREA
10 For replacing the Service & Hazardous
11 Materials buildings and installing a fuel
12 tank ......................................... 304,944
13 RESEARCH & COLLECTIONS CENTER - SPRINGFIELD
14 For renovating the interior .................... 991,000
15 ROCK CUT STATE PARK - WINNEBAGO COUNTY
16 For upgrading the sewage system ................ 2,039,178
17 NEW OFFICE BUILDING - SPRINGFIELD
18 For completing construction of an
19 office building, in addition to funds
20 previously appropriated ...................... 1,339,287
21 SPRING GROVE FISHERIES CENTER - MCHENRY COUNTY
22 For planning and beginning renovation
23 of hatchery .................................. 341,468
24 SPRINGFIELD
25 For constructing an office building and
26 interpretive center .......................... 4,120,470
27 STARVED ROCK STATE PARK - LASALLE COUNTY
28 For construction of a visitors center, in
29 addition to funds previously appropriated .... 607,975
30 For rehabilitating the sewer system ............ 357,431
31 For rehabilitating trails, in addition
32 to funds previously appropriated ............. 30,205
33 For upgrading the HVAC system .................. 45,831
34 SOUTHERN ILLINOIS MINING OFFICE - BENTON
-31- BOB-CDB03
1 (From Article 56, Section 8 of Public Act 92-8)
2 For rehabilitating the facility ................ 150,000
3 STARVED ROCK STATE PARK AND LODGE - LASALLE COUNTY
4 For upgrading water and sewer systems .......... 600,000
5 WASTE MANAGEMENT & RESEARCH CENTER
6 (From Article 56a, Section 5 of Public Act 92-8)
7 For constructing a garage and
8 storage area ................................. 385,838
9 WHITE PINES FOREST STATE PARK - OGLE COUNTY
10 For planning and beginning lodge and cabin
11 restoration .................................. 109,108
12 WILDLIFE PRAIRIE PARK
13 For planning and beginning the upgrade
14 of the park .................................. 403,803
15 WILLIAM W. POWERS FISH & WILDLIFE AREA - COOK COUNTY
16 (From Article 56, Section 8 of Public Act 92-8)
17 For replacing sanitary sewer lines and
18 lift station ................................. 870,550
19 TUNNEL HILL-CACHE RIVER STATE NATURAL AREA
20 (From Article 56a, Section 5 of Public Act 92-8)
21 For constructing a visitor center and
22 purchasing land .............................. 982,217
23 NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER
24 (FORMERLY BURNHAM HOSPITAL)
25 For construction of a Natural History
26 Research Center for the space needs of
27 the Illinois Natural History Survey on
28 the campus of the University of Illinois...... 6,000,000
29 For planning and construction of the
30 Natural History Research Center
31 for the space needs of the
32 Illinois Natural History Survey
33 on the campus of the University
34 of Illinois in Champaign ..................... 2,103,800
-32- BOB-CDB03
1 STATE WATER SURVEY - CHAMPAIGN
2 For constructing a vehicle maintenance
3 and shop building ............................ 3,532,499
4 For upgrading and replacing the mechanical
5 system, in addition to funds
6 previously appropriated ...................... 2,081,198
7 STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
8 For the completion of site improvements ........ 190,582
9 STATE MUSEUM - SPRINGFIELD
10 (From Article 56, Section 8 of Public Act 92-8)
11 Plan, begin construction of Illinois
12 State Museum ................................. 3,600,000
13 (From Article 56a, Section 5 of Public Act 92-8)
14 For renovating or replacing exhibits, in
15 addition to funds previously appropriated .... 4,733,794
16 For planning and replacement of the main
17 museum exhibits, in addition to funds
18 previously appropriated ...................... 99,729
19 STATEWIDE
20 (From Article 56, Section 8 of Public Act 92-8)
21 For constructing, replacing and
22 renovating lodges and concession
23 buildings .................................... 6,624,000
24 For replacing roofs at the following locations,
25 at the approximate cost set forth below ....... 525,000
26 Shabbona Lake State
27 Park .................................155,000
28 Hennepin Canal Parkway
29 State Park ...........................115,000
30 Randolph Fish &
31 Wildlife Area .........................65,000
32 Dixon Springs State
33 Park .................................190,000
34 (From Article 56a, Section 5 of Public Act 92-8)
-33- BOB-CDB03
1 For fabrication of visitors centers
2 exhibit ...................................... 427,060
3 For replacing and constructing vault
4 toilets at the following locations,
5 at the approximate cost set forth
6 below ........................................ 1,749,122
7 Wayne Fitzgerrell State Park .........410,000
8 Goose Lake Prairie State Park .........64,122
9 Wolf Creek State Park ................800,000
10 Hennepin Canal Parkway
11 State Trail ..........................425,000
12 Kaskaskia River Fish &
13 Wildlife Area .........................50,000
14 For providing dump stations.................. 200,000
15 For rehabilitating bridges at the
16 following locations, at the approximate
17 cost set forth below ......................... 693,806
18 Rock Island Trail ....................341,806
19 Frank Holten State Park ..............260,000
20 Horseshoe Lake State Park .............67,000
21 Castle Rock State Park ................25,000
22 For rehabilitating dams at the
23 following locations, at the
24 approximate cost set forth below ............. 1,032,662
25 Ramsey Lake State Park ...............176,662
26 Rock Cut State Park ..................450,000
27 Snakeden Hollow State Park ...........406,000
28 For replacing roofs at the following
29 locations, at the approximate
30 cost set forth below ......................... 1,129,384
31 Southern IL Arts &
32 Crafts Center .......................272,384
33 Frank Holten State Park ...............45,000
34 DNR Geological Survey-
-34- BOB-CDB03
1 Champaign ...........................124,000
2 Sangchris Lake State
3 Park ..................................5,000
4 Illini State Park ....................125,000
5 Shelbyville Fish &
6 Wildlife Area .......................100,000
7 Trail of Tears State
8 Forest ..............................130,000
9 Sanganois Conservation Area ...........35,000
10 Rice Lake State Park ..................75,000
11 Hidden Spring State Park ..............60,000
12 Siloam Springs State Park .............10,000
13 Mississippi Palisades
14 State Park ..........................148,000
15 For replacing roofing systems at the
16 following locations, at the approximate
17 cost set forth below ......................... 433,532
18 Beall Woods Conservation Area -
19 Wabash County ........................3,000
20 Eldon Hazlet State Park -
21 Clinton County ......................14,000
22 Fox Ridge State Park -
23 Coles County ........................21,532
24 Giant City State Park -
25 Jackson/Union Counties ..............14,000
26 Goose Lake Prairie State Park -
27 Grundy County .......................10,000
28 Hennepin Canal Parkway State Trail ...45,000
29 Illinois Beach State Park -
30 Lake County ........................150,000
31 Illinois Caverns Natural Area -
32 Monroe County .......................21,000
33 Kankakee River State Park -
34 Kankakee/Will Counties ..............40,000
-35- BOB-CDB03
1 Moraine Hills State Park -
2 McHenry County ......................23,000
3 Moraine View State Park -
4 McLean County.........................4,000
5 Ramsey Lake State Park -
6 Fayette County .......................1,000
7 Randolph County Conservation Area ....10,000
8 Stephen A. Forbes State Park -
9 Marion County ........................7,000
10 Ten Mile Creek State Fish &
11 Wildlife Area - Jefferson/
12 Hamilton Counties....................21,000
13 Union County Conservation Area ........4,000
14 Washington County Conservation Area ..10,000
15 William W. Powers Conservation Area -
16 Cook County .........................34,000
17 Wolf Creek State Park -
18 Shelby County ........................1,000
19 For replacing vault toilets at the following
20 locations, at the approximate cost set forth
21 below ........................................ 446,441
22 Anderson Lake Conservation Area -
23 Fulton/Schuyler Counties ...........156,000
24 Giant City State Park -
25 Jackson/Union Counties .............196,068
26 Randolph County Conservation Area ....82,158
27 Silver Springs State Park -
28 Kendall County .....................12,215
29 For replacing roofing systems at the
30 following locations at the approximate
31 costs set forth below ........................ 38,824
32 Silver Springs State Park, Three
33 Buildings .......................... 33,679
34 Weldon Springs State Park, Nine
-36- BOB-CDB03
1 Buildings ........................... 5,145
2 For constructing vault toilets at the following
3 locations at the approximate costs set forth
4 below ........................................ 229,441
5 Cave-In-Rock State Park ............. 94,265
6 Golconda/Rauchfuss Hill ............. 72,360
7 Prophetstown State Park ............. 53,437
8 William W. Powers State Park ......... 9,379
9 For constructing hazardous material storage
10 buildings .................................... 200,964
11 For replacing concession buildings and
12 upgrading support facilities at the following
13 locations at the approximate costs set
14 forth below: ................................. 456,612
15 Kickapoo State Park ..................319,890
16 Rock Cut State Park ..................114,900
17 Stephen A. Forbes State Park ..........21,822
18 For constructing vault toilets at the
19 following locations at the approximate
20 cost set forth below: ........................ 501,126
21 Apple River Canyon State Park ........221,246
22 Des Plaines Conservation Area .........66,000
23 Kankakee River State Park .............31,780
24 Lake Le-Aqua-Na State Park ...........115,000
25 Marshall County Conservation Area .....30,000
26 Morrison-Rockwood State Park .............100
27 Rice Lake Conservation Area ...........37,000
28 For replacing roofing systems and structural
29 repairs at the following locations at the
30 approximate costs set forth below: ........... 33,338
31 Mine Rescue Station, One building ......7,234
32 Castle Rock State Park,
33 One building ..........................2,000
34 Dixon Springs State Park,
-37- BOB-CDB03
1 Three buildings .......................1,060
2 Cave-In-Rock State Park,
3 One building ..........................1,060
4 Ferne Clyffe State Park,
5 One building ..........................1,060
6 Hamilton County Conservation
7 Area, One building ...................15,000
8 Lake Murphysboro State Park
9 Two buildings .........................1,060
10 Red Hills State Park, Two
11 buildings .............................1,060
12 Fox Ridge State Park, Six
13 buildings .............................1,060
14 Shelbyville Fish and Wildlife
15 Area, Two buildings ...................1,060
16 Newton Lake Fish and Wildlife
17 Area, One building ....................1,684
18 For repair or replacement of roofs and
19 parapet walls and reconstruction of
20 chimneys at the following locations
21 at the approximate costs set forth below ..... 509,923
22 Geological Survey - Applied Lab ......186,375
23 Water Survey - Eight Buildings ........46,000
24 Natural History Survey - Natural
25 Resources Studies Annex ..............67,000
26 Geological Survey - Natural
27 Resources Building ...................64,000
28 Water Survey - Parapet walls at
29 Buildings No. 4, 5 and 6 .............10,000
30 Dickson Mounds - Exterior restroom
31 and picnic shelter ...................14,530
32 Jake Wolf Fish Hatchery ..............122,018
33 For land acquisition ........................... 280,169
34 For construction of hazardous material
-38- BOB-CDB03
1 storage buildings ............................ 66,293
2 For planning, construction, reconstruction,
3 land acquisition and related costs,
4 utilities, site improvements, and all other
5 expenses necessary for various capital
6 improvements at parks, conservation areas,
7 and other facilities under the jurisdiction
8 of the Department of Natural Resources ....... 2,122,014
9 Total, Section 5 $87,272,655
10 Section 5.1. The sum of $3,000,000, or so much thereof
11 as may be necessary, and remains unexpended at the close of
12 business on June 30, 2002, from a reappropriation heretofore
13 made in Article 56a, Section 5.1 of Public Act 92-8, as
14 amended, is reappropriated from the Capital Development Fund
15 to the Capital Development Board for a grant to the City of
16 Chicago for acquiring land, planning and beginning
17 construction of a visitor center at Lake Calumet.
18 Section 5.2. The following named amounts, or so much
19 thereof as may be necessary and remain unexpended from
20 reappropriations heretofore made for such purposes in Article
21 56a, Section 5.2 of Public Act 92-8, are reappropriated from
22 the General Revenue Fund to the Capital Development Board for
23 the Department of Natural Resources for the projects
24 hereinafter enumerated:
25 (From Article 56a, Section 5.2 of Public Act 92-8)
26 DICKSON MOUNDS MUSEUM - LEWISTOWN
27 For planning and beginning repair of
28 exterior walls ............................... $ 25,098
29 FOX RIDGE STATE PARK - COLES COUNTY
30 For rehabilitating historic structures ......... 194,865
31 HENNEPIN CANAL PARKWAY - ROCK ISLAND COUNTY
-39- BOB-CDB03
1 For rehabilitating Aqueduct #6 ................. 80,011
2 SPRING GROVE HATCHERY - MCHENRY COUNTY
3 For upgrading the septic system ................ 30,000
4 STATEWIDE
5 For rehabilitating or replacing
6 playground equipment ......................... 139,232
7 For rehabilitating or replacing playground
8 equipment .................................... 69,624
9 For rehabilitation of trail systems ............ 73,019
10 Total, Section 5.2 $611,849
11 Section 5.3. The sum of $200,000, or so much thereof as
12 may be necessary and remains unexpended at the close of
13 business on June 30, 2002, from a reappropriation heretofore
14 made in Article 56a, Section 5.3 of Public Act 92-8, is
15 reappropriated from the Capital Development Fund to the
16 Capital Development Board for a grant to the City of Carlyle
17 for development of a health center in association with resort
18 development at Carlyle Lake.
19 Section 5a. The following named amounts, or so much
20 thereof as may be necessary and remain unexpended at the
21 close of business on June 30, 2002, from appropriations
22 heretofore made for such purposes in Article 56, Section 8.1
23 and Article 56a, Section 5a of Public Act 92-8, are
24 reappropriated from the Tobacco Settlement Recovery Fund to
25 the Capital Development Board for the Department of Natural
26 Resources for the projects hereinafter enumerated:
27 STATEWIDE PROGRAM
28 (From Article 56, Section 8.1 of Public Act 92-8)
29 For maintaining lodge and concession
30 facilities ................................... $ 450,022
31 (From Article 56a, Section 5a of Public Act 92-8)
-40- BOB-CDB03
1 For maintaining lodge
2 and concession facilities .................... 79,486
3 For rehabilitating or
4 replacing playground equipment ............... 1,120,000
5 For land acquisition
6 relocation costs ............................. 100,000
7 For nature preserve
8 boundary fence and survey .................... 405,000
9 DICKSON MOUNDS MUSEUM - LEWISTOWN
10 For renovating E. Waterford School ............ 562,520
11 GRUBB HOLLOW PRAIRIE - PIKE COUNTY
12 For constructing a parking lot &
13 kiosk and developing trails .................. 10,000
14 ILLINOIS BEACH STATE PARK - LAKE COUNTY
15 (From Article 56, Section 8.1 of Public Act 92-8)
16 For stabilizing the shoreline .................. 400,000
17 (From Article 56a, Section 5a of Public Act 92-8)
18 For stabilizing the shoreline .................. 60,931
19 KASKASKIA BIO STATION-MOULTRIE COUNTY
20 For renovating buildings ....................... 684,600
21 KASKASKIA RIVER FISH & WILDLIFE AREA - RANDOLPH COUNTY
22 For providing boat access
23 safety improvements .......................... 210,000
24 LASALLE FISH & WILDLIFE AREA - LASALLE COUNTY
25 For upgrading fish-holding
26 and water systems ............................ 262,157
27 LITTLE GRASSY FISH HATCHERY - WILLIAMSON COUNTY
28 For replacing fish collection kettles .......... 107,066
29 NAUVOO STATE PARK - HANCOCK COUNTY
30 For renovating the Reinberger Museum ........... 205,300
31 PRAIRIE RIDGE SANCTUARY NATURAL AREA
32 For upgrading electrical
33 and providing insulation ..................... 112,346
34 RAMSEY LAKE STATE PARK - FAYETTE COUNTY
-41- BOB-CDB03
1 For replacing fjords ........................... 150,000
2 REAVIS SPRING HILL PRAIRIE NATURE PRESERVE - MASON COUNTY
3 For developing natural resources
4 protection ................................... 50,000
5 JAMES R. THOMPSON CENTER - CHICAGO
6 For renovating the art gallery ................. 416,017
7 WAYNE FITZGERRELL STATE PARK - JEFFERSON COUNTY
8 (From Article 56, Section 8.1 of Public Act 92-8)
9 For stabilizing the watershed shoreline ........ 671,945
10 Total, Section 5a $6,057,390
11 Section 6. The following named amounts, or so much
12 thereof as may be necessary and remain unexpended at the
13 close of business on June 30, 2002, from appropriations and
14 reappropriations heretofore made for such purposes in Article
15 56, Section 3, and Article 56a, Section 6 of Public Act 92-8,
16 as amended, are reappropriated from the Capital Development
17 Fund to the Capital Development Board for the Department of
18 Corrections for the projects hereinafter enumerated:
19 CENTRALIA CORRECTIONAL CENTER
20 (From Article 56, Section 3 of Public Act 92-8)
21 For planning upgrade of electrical system ...... $ 200,000
22 For upgrading building automation system ....... 1,100,000
23 DANVILLE CORRECTIONAL CENTER
24 For planning upgrade of the boilers ............ 244,800
25 DECATUR WOMEN'S CORRECTIONAL CENTER
26 (From Article 56a, Section 6 of Public Act 92-8)
27 For the planning and conversion of
28 Meyer Mental Health Center into a
29 correctional facility ........................ 67,403
30 DIXON CORRECTIONAL CENTER
31 (From Article 56, Section 3 of Public Act 92-8)
32 For planning the upgrade and expansion
-42- BOB-CDB03
1 of the medical care facility ................. 1,200,000
2 (From Article 56a, Section 6 of Public Act 92-8)
3 For constructing a gun range and
4 classroom building ........................... 426,687
5 DWIGHT CORRECTIONAL CENTER
6 For renovating C9 and Old Hospital ............. 3,701,200
7 For renovating Housing Unit C8, in
8 addition to funds previously
9 appropriated ................................. 270,000
10 For upgrading the water treatment plant ........ 279,806
11 For renovating buildings, in addition
12 to funds previously appropriated ............. 274,847
13 For constructing a gatehouse and
14 sally port and upgrading the
15 security system .............................. 218,523
16 For renovation of buildings .................... 32,161
17 EAST MOLINE CORRECTIONAL CENTER
18 (From Article 56, Section 3 of Public Act 92-8)
19 For replacing windows .......................... 605,000
20 (From Article 56a, Section 6 of Public Act 92-8)
21 For replacing the chiller/absorber ............. 387,700
22 For upgrading fire alarm and building
23 automation systems ........................... 477,795
24 For upgrading the electrical
25 system ....................................... 778,354
26 HANNA CITY WORK CAMP
27 For upgrading electrical system ................ 70,719
28 GRAHAM CORRECTIONAL CENTER
29 (From Article 56, Section 3 of Public Act 92-8)
30 For planning upgrade of building automation
31 system and fire alarm system ................. 200,000
32 For upgrading electrical system ................ 1,974,296
33 HILL CORRECTIONAL CENTER - GALESBURG
34 (From Article 56a, Section 6 of Public Act 92-8)
-43- BOB-CDB03
1 For upgrading electrical system ................ 121,791
2 HOPKINS PARK
3 For infrastructure improvements
4 in connection with the Hopkins Park
5 Correctional Center .......................... 8,176,670
6 ILLINOIS RIVER CORRECTIONAL CENTER - CANTON
7 For replacing warehouse freezers ............... 139,969
8 ILLINOIS YOUTH CENTER - KEWANEE - HENRY COUNTY
9 For constructing a 60-bed inmate
10 housing addition ............................. 3,939,770
11 ILLINOIS YOUTH CENTER - ST. CHARLES
12 For constructing an R & C building
13 and other improvements ....................... 33,642,017
14 For upgrading plumbing system and replacing
15 toilets and sinks ............................ 403,117
16 For planning and beginning the upgrade
17 of existing facility ......................... 268,643
18 ILLINOIS YOUTH CENTER - HARRISBURG
19 (From Article 56, Section 3 of Public Act 92-8)
20 For constructing a multi-purpose medical,
21 vocational and confinement building .......... 10,250,000
22 (From Article 56a, Section 6 of Public Act 92-8)
23 For upgrading mechanical control system ........ 161,127
24 ILLINOIS YOUTH CENTER - JOLIET
25 (From Article 56, Section 3 of Public Act 92-8)
26 For replacing rooftop units at
27 Administration Building ...................... 195,000
28 ILLINOIS YOUTH CENTER - RUSHVILLE
29 (From Article 56a, Section 6 of Public Act 92-8)
30 For planning, design, construction, equipment
31 and all other necessary costs to add
32 a cellhouse .................................. 12,077,980
33 ILLINOIS YOUTH CENTER - VALLEY VIEW
34 For replacing boilers, controls, hot
-44- BOB-CDB03
1 water heaters and softeners in
2 residential units and administration
3 building ..................................... 203,038
4 ILLINOIS YOUTH CENTER - WARRENVILLE
5 (From Article 56, Section 3 of Public Act 92-8)
6 For upgrading site utilities ................... 345,000
7 (From Article 56a, Section 6 of Public Act 92-8)
8 For rehabilitation of the administration
9 building ..................................... 742,084
10 JOLIET CORRECTIONAL CENTER
11 (From Article 56, Section 3 of Public Act 92-8)
12 For replacing the transfer switch and
13 emergency generator .......................... 980,000
14 (From Article 56a, Section 6 of Public Act 92-8)
15 For correcting erosion and
16 stabilizing the masonry wall ................. 398,354
17 LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE
18 For constructing two cellhouses, in
19 addition to funds previously appropriated .... 760,820
20 LINCOLN CORRECTIONAL CENTER
21 (From Article 56, Section 3 of Public Act 92-8)
22 For replacing water supply lines ............... 1,121,300
23 LOGAN CORRECTIONAL CENTER
24 (From Article 56a, Section 6 of Public Act 92-8)
25 For constructing a medical building
26 and dietary building ......................... 10,989,246
27 MENARD CORRECTIONAL CENTER - CHESTER
28 (From Article 56, Section 3 of Public Act 92-8)
29 For replacing the Administration
30 Building ..................................... 1,000,000
31 For replacing the sally port ................... 925,000
32 (From Article 56a, Section 6 of Public Act 92-8)
33 For stabilizing dam, in addition to funds
34 previously appropriated ...................... 462,231
-45- BOB-CDB03
1 For correcting slope failure & MSU
2 improvements ................................. 446,365
3 For upgrading electrical distribution
4 system ....................................... 1,869,755
5 For replacing the HVAC system .................. 457,493
6 For improving ventilation and dehumidification
7 systems in the kitchen and dining rooms ...... 95,303
8 For replacing shower room and guard tower ...... 102,641
9 For upgrading mechanical bar screen and storm
10 and sanitary sewer system .................... 215,550
11 For completing upgrade of North Cellhouse
12 plumbing system, in addition to funds
13 previously appropriated ...................... 207,248
14 For replacing toilets and waste lines
15 at E/W Cellhouse and upgrade
16 North Cellhouse plumbing ..................... 442,832
17 For renovation or replacement of the
18 Old Hospital Building, in addition to
19 funds previously appropriated ................ 2,819,184
20 For replacing Boiler #2, in addition
21 to funds previously appropriated ............. 19,450
22 For replacement of the chimney stack and
23 boilers, in addition to funds previously
24 appropriated ................................. 87,501
25 For planning and construction of the
26 Administration Building ...................... 1,200,000
27 PONTIAC CORRECTIONAL CENTER
28 For expanding the main sally port .............. 400,000
29 For renovating the exterior of North/
30 South Cellhouses ............................. 552,172
31 For completing replacement of hot water
32 lines, in addition to funds previously
33 appropriated ................................. 565,233
34 For renovation of main sally port .............. 270,405
-46- BOB-CDB03
1 SHERIDAN CORRECTIONAL CENTER
2 (From Article 56, Section 3 of Public Act 92-8)
3 For upgrading electrical system and
4 installing a generator ....................... 905,000
5 (From Article 56a, Section 6 of Public Act 92-8)
6 For upgrading the storm sewers ................. 103,661
7 For replacing doors and locks .................. 145,936
8 SOUTHWESTERN CORRECTIONAL CENTER
9 (From Article 56, Section 3 of Public Act 92-8)
10 For replacing sewer lines ...................... 398,084
11 STATEVILLE CORRECTIONAL CENTER - JOLIET
12 For replacing windows in Cellhouse B,
13 in addition to funds previously
14 appropriated ................................. 2,500,000
15 (From Article 56a, Section 6 of Public Act 92-8)
16 For planning and beginning renovation of
17 H & I houses ................................. 402,088
18 For replacing the water line ................... 3,220,795
19 For upgrading electrical system in
20 "B" House .................................... 1,428,300
21 For constructing a housing unit, cellhouse,
22 vehicle maintenance building and
23 warehouse for the reception and
24 classification center, in addition to
25 funds previously appropriated ................ 4,873,743
26 For replacing windows in B House ............... 2,876,644
27 For replacing cell fronts in F House ........... 941,480
28 For upgrading plumbing system in F House,
29 in addition to funds previously
30 appropriated ................................. 3,497,820
31 For replacing power plant and
32 utility distribution system .................. 4,739,578
33 For planning, design, construction,
34 equipment and all other necessary costs
-47- BOB-CDB03
1 for an Adult Reception and Classification
2 Center ....................................... 16,817,412
3 For upgrading storm drainage and
4 wastewater systems ........................... 1,088,016
5 For upgrading electrical system and elevator
6 and installing HVAC system ................... 1,179,600
7 TAYLORVILLE CORRECTIONAL CENTER
8 For upgrading shower ventilation system ........ 20,085
9 THOMSON CORRECTIONAL CENTER
10 For constructing three cellhouses and
11 expanding educational and vocational
12 space, in addition to funds previously
13 appropriated ................................. 10,786,381
14 VANDALIA CORRECTIONAL CENTER
15 For constructing a multi-purpose program
16 building ..................................... 358,528
17 For converting Administration Building and
18 planning construction of an Administration/
19 Health Care Unit ............................. 455,520
20 For upgrading the primary water
21 distribution system .......................... 383,142
22 For planning and beginning construction
23 for a slaughter house and meat plant ......... 253,995
24 For repairing exterior masonry, in addition
25 to funds previously appropriated ............. 229,502
26 VIENNA CORRECTIONAL CENTER
27 (From Article 56, Section 3 of Public Act 92-8)
28 For upgrading the HVAC system and replacing
29 water lines in six housing units ............. 1,770,018
30 (From Article 56a, Section 6 of Public Act 92-8)
31 For replacing windows, in addition to
32 funds previously appropriated ................ 236,201
33 For completing upgrade of the steam
34 distribution system, in addition to
-48- BOB-CDB03
1 funds previously appropriated ................ 216,179
2 For upgrading electrical system and
3 installing emergency generator ............... 51,270
4 For renovating the kitchen ..................... 350,157
5 For upgrading the steam distribution system
6 and renovation of Powerhouse, in addition
7 to funds previously appropriated ............. 131,139
8 For upgrading air conditioning system
9 and replacement of cooling tower ............. 109,384
10 WESTERN ILLINOIS CORRECTIONAL CENTER - MT. STERLING
11 For replacing warehouse freezers ............... 146,900
12 STATEWIDE
13 (From Article 56, Section 3 of Public Act 92-8)
14 For replacing doors and locks
15 at the following locations at the
16 approximate costs set forth below ............ 4,091,162
17 Dixon Correctional Center ..........1,300,000
18 Hill Correctional Center .............500,000
19 Sheridan Correctional Center .......1,300,000
20 Vienna Correctional Center ...........991,162
21 For replacing roofing systems at
22 the following locations at the
23 approximate cost set forth below ............. 690,000
24 Illinois Youth Center -
25 St. Charles .........................100,000
26 Illinois Youth Center -
27 Warrenville ..........................330,000
28 Logan Correctional Center ............260,000
29 For upgrading showers at the following
30 locations at the approximate
31 cost set forth below ......................... 3,233,800
32 Hill Correctional
33 Center ............................1,140,000
34 Illinois River Correctional
-49- BOB-CDB03
1 Center ..............................635,000
2 Taylorville Correctional
3 Center ..............................823,800
4 Western Illinois Correctional
5 Center ..............................635,000
6 For upgrading water distribution systems at
7 the following locations at the approximate
8 cost set forth below ......................... 2,950,503
9 Dixon Correctional
10 Center ............................1,500,000
11 Joliet Correctional
12 Center ............................1,450,503
13 For upgrading water towers at the following
14 locations at the approximate
15 cost set forth below ......................... 4,400,000
16 Dixon Correctional
17 Center ............................2,800,000
18 Illinois Youth Center -
19 St. Charles .......................1,300,000
20 Illinois Youth Center -
21 Valley View .........................300,000
22 (From Article 56a, Section 6 of Public Act 92-8)
23 For planning, design, construction, equipment
24 and all other necessary costs for a
25 maximum security facility .................... 126,120,700
26 For planning a medium security facility
27 and land acquisition ......................... 4,583,534
28 For replacing locks and control panels
29 at the following locations at the
30 approximate costs set forth below ............ 2,509,381
31 Illinois River
32 Correctional Center .................850,000
33 Western Illinois
34 Correctional Center .................850,000
-50- BOB-CDB03
1 Danville Correctional
2 Center ..............................809,381
3 For replacing roofing systems at
4 the following locations at the
5 approximate cost set forth below ............. 1,453,783
6 Menard Correctional Center ...........157,883
7 Vienna Correctional Center ............81,100
8 Illinois Youth Center -
9 Harrisburg ...........................43,800
10 Dixon Correctional Center ............500,000
11 Pontiac Correctional Center ..........440,000
12 Illinois Youth Center - Joliet .......231,000
13 For replacing or upgrading security and
14 monitoring systems at the following
15 locations at the approximate cost set
16 forth below .................................. 478,706
17 Vienna Correctional
18 Center ..............................250,000
19 Pontiac Correctional
20 Center ..............................200,000
21 Joliet Correctional
22 Center ...............................28,706
23 For planning and replacing windows at the
24 following locations at the approximate cost
25 set forth below .............................. 2,993,234
26 Vienna Correctional
27 Center ............................1,780,000
28 Sheridan Correctional
29 Center ..............................399,959
30 Illinois Youth Center -
31 Valley View .........................500,000
32 Illinois Youth Center -
33 Joliet ...............................81,499
34 Dixon Correctional
-51- BOB-CDB03
1 Center ..............................206,292
2 Shawnee Correctional
3 Center ...............................25,484
4 For upgrading and renovating showers at
5 the following locations at the approximate
6 cost set forth below ......................... 1,894,962
7 Shawnee Correctional
8 Center ..............................785,847
9 Danville Correctional
10 Center ..............................734,115
11 Graham Correctional
12 Center ..............................200,000
13 Centralia Correctional
14 Center ..............................175,000
15 For replacing security fencing at the
16 following locations at the approximate
17 cost set forth below ......................... 1,147,101
18 Hill Correctional
19 Center ..............................379,153
20 Western IL Correctional
21 Center ..............................129,829
22 Joliet Correctional
23 Center ...............................49,119
24 Logan Correctional
25 Center ..............................200,000
26 Dixon Correctional
27 Center ..............................100,000
28 Shawnee Correctional
29 Center ..............................100,000
30 Graham Correctional
31 Center ...............................89,000
32 Danville Correctional
33 Center ..............................100,000
34 For upgrading roads and parking lots at
-52- BOB-CDB03
1 the following locations at the approximate
2 cost set forth below ......................... 660,647
3 Dwight Correctional
4 Center ..............................443,773
5 Illinois Youth Center -
6 Valley View .........................216,874
7 For planning, design, construction, equipment
8 and all other necessary costs for a
9 female multi-security level
10 correctional center .......................... 78,054,054
11 For replacing roofing systems at the
12 following locations at the approximate
13 cost set forth below ......................... 259,016
14 Vienna Correctional Center ..........241,231
15 Sheridan Correctional Center .........17,785
16 For replacing or installing mechanical bar
17 screens at the following locations at the
18 approximate cost set forth below ............. 117,976
19 Graham Correctional Center -
20 Hillsboro ...........................84,976
21 Western Illinois Correctional
22 Center - Mt. Sterling ...............33,000
23 For upgrading security control systems and
24 panels in housing units at the following
25 locations at the approximate cost set
26 forth below .................................. 3,753,580
27 Danville Correctional Center ........500,000
28 Hill Correctional Center -
29 Galesburg ..........................903,580
30 Western Illinois Correctional
31 Center - Mt. Sterling ..............675,000
32 Illinois River Correctional
33 Center - Canton ....................675,000
34 Shawnee Correctional Center -
-53- BOB-CDB03
1 Vienna ...........................1,000,000
2 For planning, design, construction,
3 equipment and all other necessary costs
4 for a juvenile facility ...................... 14,778,129
5 For replacing locks and doors at the
6 following locations at the approximate
7 cost set forth below ......................... 118,621
8 Dwight Correctional Center ......... 103,239
9 Illinois River Correctional
10 Center - Canton ..................... 3,610
11 IYC - Joliet ......................... 3,785
12 IYC - Pere Marquette - Grafton ....... 7,987
13 For replacing roofing systems at the following
14 locations at the approximate cost set forth
15 below ........................................ 493,218
16 Dixon Correctional Center,
17 four buildings .................... 173,370
18 IYC - St. Charles, two buildings ... 193,500
19 Joliet Correctional Center,
20 six buildings ...................... 62,335
21 Logan Correctional Center - Lincoln
22 three buildings ..................... 8,086
23 Menard Correctional Center - Chester
24 six buildings ...................... 24,738
25 Pontiac Correctional Center,
26 one building ....................... 31,189
27 For inspecting and upgrading water towers
28 at the following locations at the approximate
29 costs set forth below ........................ 675,230
30 Dixon Correctional Center,
31 Upgrade Water Tower ............... 369,928
32 Graham Correctional Center - Hillsboro
33 Upgrade Water Tower ............... 62,524
34 Joliet Correctional Center,
-54- BOB-CDB03
1 Upgrade Water Tower ................ 76,108
2 Logan Correctional Center - Lincoln
3 Complete Water Tower Upgrade ...... 13,000
4 Menard Correctional Center - Chester
5 Upgrade Water Tower ............... 22,443
6 Stateville Correctional Center - Joliet
7 Upgrade Water Tower ............... 36,112
8 Statewide, Inspect and Upgrade
9 Water Towers ....................... 95,115
10 For upgrading fire and safety systems at
11 the following locations at the approximate
12 costs set forth below, in addition to
13 funds previously appropriated ................ 2,619,002
14 Menard Correctional Center -
15 Chester ......................... 1,854,559
16 Sheridan Correctional Center ....... 295,481
17 Vienna Correctional Center ......... 468,962
18 For replacing roofing systems at the
19 following locations at the approximate
20 costs set forth below: ....................... 29,338
21 East Moline Correctional Center,
22 Three buildings ..................... 25,238
23 Graham Correctional Center, Hillsboro
24 Seven buildings ...................... 4,000
25 Sheridan Correctional Center, LaSalle
26 Three buildings ........................ 100
27 For replacing doors and locks at the
28 following locations at the approximate
29 costs set forth below: ....................... 349,738
30 IYC - St. Charles ................... 160,081
31 Lincoln Correctional Center .......... 98,481
32 Jacksonville Correctional Center ..... 12,473
33 Sheridan Correctional Center ......... 78,703
34 For upgrading fire safety systems at the
-55- BOB-CDB03
1 following locations at the approximate
2 costs set forth below, in addition to
3 funds previously appropriated: ............... 4,219,722
4 Menard Correctional Center ........... 27,000
5 Pontiac Correctional Center ....... 2,766,722
6 Stateville Correctional Center .... 1,426,000
7 For upgrading water and wastewater
8 systems at the following locations
9 at the approximate costs set forth below: .... 535,525
10 Big Muddy Correctional Center
11 for installing mechanical
12 bar screen ........................... 7,347
13 Centralia Correctional Center
14 for upgrading water
15 treatment plant ..................... 81,816
16 East Moline Correctional Center
17 for upgrading sewer system ........... 4,310
18 Ed Jenison Work Camp (Paris)
19 for installing mechanical
20 bar screen ........................... 2,530
21 IYC - Harrisburg for upgrading
22 water distribution system ........... 59,198
23 Kankakee MSU for constructing
24 well #2 ............................ 288,550
25 IYC - St. Charles for upgrading
26 sewage/storm system ................. 80,000
27 IYC - Valley View for installing
28 mechanical bar screen ............... 11,774
29 For correction of deficiencies in
30 water systems at three correctional
31 facilities ................................... 76,555
32 For replacement of locks, windows and
33 doors at the following locations
34 as set forth below: .......................... 211,416
-56- BOB-CDB03
1 IYC Harrisburg ........................ 9,684
2 IYC Joliet ............................ 1,000
3 Menard .............................. 177,562
4 IYC Valley View ...................... 22,170
5 Vienna ................................ 1,000
6 For planning, design, construction,
7 equipment and other necessary costs
8 for a Maximum Security Correctional
9 Center, in addition to funds previously
10 appropriated ................................. 125,851
11 For planning, design, construction,
12 equipment and other necessary costs
13 for a Correctional Facility for
14 juveniles .................................... 437,994
15 For planning, design, construction,
16 equipment and other necessary costs
17 for a Medium Security Correctional
18 Facility ..................................... 481,161
19 For correcting defects in the food preparation
20 areas, including roofs ....................... 108,588
21 For replacement of roofs at various Department of
22 Corrections locations ........................ 31,724
23 For roof replacement at the following
24 locations at the approximate costs
25 set forth below: ............................. 179,437
26 Graham Correctional Center
27 Five buildings ........................6,543
28 Graham Correctional Center
29 Thirty-two buildings ..................6,000
30 Menard Correctional Center
31 Warehouse Building ...................26,000
32 Menard Correctional Center
33 Five buildings .......................70,394
34 Pontiac Correctional Center
-57- BOB-CDB03
1 Eight buildings .......................6,500
2 Sheridan Correctional Center
3 Six buildings ........................16,000
4 Stateville Correctional Center
5 Seven buildings ......................24,000
6 Ill Youth Center-Valley View
7 Administration Building and
8 Kitchen Addition ....................24,000 ____________
9 Total, Section 6 $435,043,526
10 Section 6.1. The following named amounts, or so much
11 thereof as may be necessary and remain unexpended at the
12 close of business on June 30, 2002, from reappropriations
13 heretofore made for such purposes in Article 56a, Section
14 6.1 of Public Act 92-8, are reappropriated from the General
15 Revenue Fund to the Capital Development Board for the
16 Department of Corrections for the projects hereinafter
17 enumerated:
18 (From Article 56a, Section 6.1 of Public Act 92-8)
19 STATEWIDE
20 For energy conservation improvements at the
21 following locations at the approximate
22 costs set forth below: ....................... $ 32,218
23 Dwight Correctional Center ............ 6,000
24 Joliet Correctional Center
25 School Building ...................... 1,000
26 Menard Psychiatric Center
27 Randolph Hall ........................ 1,000
28 Stateville Correctional Center
29 Law Library .......................... 7,400
30 Pontiac Correctional Center .......... 15,093
31 Vienna Correctional Center ............ 1,725
32 For upgrading doors and locking systems at
-58- BOB-CDB03
1 the following locations at the approximate
2 costs set forth below: ....................... 547,588
3 Illinois Youth Center-Warrenville
4 For replacement of doors
5 and locking systems ............... 547,588 ____________
6 Total, Section 6.1 $579,806
7 Section 6.2. The amount of $435,987, or so much thereof
8 as may be necessary and remains unexpended at the close of
9 business on June 30, 2002, from a reappropriation heretofore
10 made for such purposes in Article 56a, Section 6.2 of Public
11 Act 92-8, is reappropriated from the General Revenue Fund to
12 the Capital Development Board for the Department of
13 Corrections for the projects hereinafter enumerated at the
14 approximate costs set forth below:
15 Danville Correctional Center -
16 For upgrading the hot water
17 distribution system ..................$1,000
18 Stateville Correctional Center-
19 For upgrading the plumbing systems in
20 four buildings ......................384,659
21 Menard Correctional Center -
22 For planning and to begin upgrading
23 the plumbing systems in two
24 buildings ............................12,394
25 Pontiac Correctional Center -
26 For upgrading the mechanical systems
27 and renovation of shower rooms .......37,934
28 Section 7. The following named amounts, or so much
29 thereof as may be necessary and remain unexpended at the
30 close of business on June 30, 2002, from appropriations and
31 reappropriations heretofore made for such purposes in Article
-59- BOB-CDB03
1 56, Section 4, and Article 56a, Section 7 of Public Act 92-8,
2 are reappropriated from the Capital Development Fund to the
3 Capital Development Board for the Historic Preservation
4 Agency for the projects hereinafter enumerated:
5 BISHOP HILL HISTORIC SITE - HENRY COUNTY
6 (From Article 56, Section 4 of Public Act 92-8)
7 For restoring interior and exterior ............ $ 500,000
8 (From Article 56a, Section 7 of Public Act 92-8)
9 For rehabilitating Bjorkland Hotel ............. 904,535
10 BLACKHAWK STATE HISTORIC SITE
11 For rehabilitating lodge ....................... 1,097,426
12 For a grant to the City of Rock Island
13 to relocate the existing sewer line .......... 120,000
14 BRYANT COTTAGE STATE MEMORIAL - BEMENT
15 For rehabilitating interior and exterior ....... 209,030
16 CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
17 For providing structural stabilization ......... 274,683
18 For renovation of the Cahokia Courthouse
19 and the Jarrot House ......................... 59,600
20 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
21 For replacement of Monk's Mounds stairs ........ 339,695
22 For restoration of Monk's Mound ................ 1,009,932
23 For purchasing private land within historic
24 site boundary ................................ 189,979
25 DAVID DAVIS HOME
26 To acquire a residence to be
27 converted to a Visitors Center ............... 249,400
28 FORT DE CHARTRES HISTORIC SITE - RANDOLPH COUNTY
29 For rehabilitating the stone gatehouse
30 wall and foundation .......................... 729,655
31 GALENA HISTORIC SITE
32 For structural stabilization and
33 rehabilitation of five historic
-60- BOB-CDB03
1 structures in the Grant Home District
2 including the Biesman, Nolan, Gill,
3 Coville, and Donegan houses .................. 377,131
4 JARROT MANSION STATE HISTORICAL SITE
5 For restoring the mansion, in addition
6 to funds previously appropriated ............. 1,644,865
7 LEWIS AND CLARK STATE MEMORIAL -
8 MADISON COUNTY
9 For constructing interpretive center,
10 and development of the historic site
11 in addition to funds previously
12 appropriated ................................. 97,861
13 LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD
14 For rehabilitating site and providing
15 irrigation system ............................ 246,247
16 LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD
17 For rehabilitating interior and exterior ....... 710,003
18 LINCOLN LOG CABIN HISTORIC SITE -
19 COLES COUNTY
20 For constructing visitors center, Phase II,
21 and developing day use area .................. 428,803
22 LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY
23 (From Article 56, Section 4 of Public Act 92-8)
24 For rehabilitating the saw and grist mill, in
25 addition to funds previously appropriated..... 750,000
26 (From Article 56a, Section 7 of Public Act 92-8)
27 For renovating village entrance and
28 completing visitors center ................... 50,639
29 LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD
30 (From Article 56, Section 4 of Public Act 92-8)
31 For constructing library and museum, in
32 addition to funds previously appropriated .... 49,993,476
33 (From Article 56a, Section 7 of Public Act 92-8)
34 For constructing a Lincoln Presidential
-61- BOB-CDB03
1 Library ...................................... 26,758,158
2 For planning and beginning the Lincoln
3 Presidential Center, in addition to
4 funds previously appropriated ................ 714,989
5 OLD STATE CAPITOL - SPRINGFIELD
6 For providing structural stabilization ......... 130,277
7 For rehabilitating Old State Capitol ........... 282,190
8 SHAWNEETOWN BANK HISTORIC SITE - GALLATIN COUNTY
9 (From Article 56, Section 4 of Public Act 92-8)
10 For rehabilitating exterior .................... 1,620,000
11 UNION STATION - SPRINGFIELD
12 (From Article 56a, Section 7 of Public Act 92-8)
13 For purchasing and rehabilitating .............. 2,523,319
14 VACHEL LINDSAY HOME
15 For rehabilitating home ........................ 152,395
16 For rehabilitating HVAC and electrical
17 systems and interior ......................... 49,351
18 STATEWIDE
19 For statewide ISTEA 21 Match ................... 637,000
20 For replacing roofing systems at the
21 following locations at the approximate
22 costs set forth below: ....................... 115,622
23 Fort De Chartres, Randolph County ....... 100
24 Washburne House, Galena ............... 5,378
25 David Davis Mansion, Bloomington ..... 22,051
26 Bishop Hill House, Henry County ...... 88,093
27 For matching ISTEA federal grant funds ......... 390,385
28 Total, Section 7 $93,356,646
29 Section 7.2. The sum of $800,000, or so much thereof as
30 may be necessary and as remains unexpended at the close of
31 business on June 30, 2002, from a reappropriation heretofore
32 made in Article 56a, Section 7.2 of Public Act 92-8, is
33 reappropriated from the Capital Development Fund to the
-62- BOB-CDB03
1 Capital Development Board for the Historic Preservation
2 Agency for the construction of an interpretive center and
3 development of the historic site at the Lewis and Clark
4 National Trail Site No. 1 in Madison County.
5 Section 7.3. The following named amounts, or so much
6 thereof as may be necessary and remain unexpended at the
7 close of business on June 30, 2002, from reappropriations
8 heretofore made for such purposes in Article 56a, Section 7.3
9 of Public Act 92-8, are reappropriated from the General
10 Revenue Fund to the Capital Development Board for the
11 Historic Preservation Agency for the projects hereinafter
12 enumerated:
13 DANA THOMAS HOUSE - SPRINGFIELD
14 (From Article 56a, Section 7.3 of Public Act 92-8)
15 For restoring exterior and interior ............ $ 229,143
16 GALENA HISTORIC SITE
17 For rehabilitating Washburne House ............. 388,265
18 LINCOLN'S NEW SALEM HISTORIC SITE -
19 PETERSBURG
20 For resurfacing village and service roads ...... 18,225
21 For rehabilitating saw mill and grist
22 mill ......................................... 208,075
23 METAMORA COURTHOUSE HISTORIC SITE
24 For rehabilitating courthouse .................. 436,370
25 OLD STATE CAPITOL - SPRINGFIELD
26 For replacing the bottom cylinder of
27 the hydraulic elevator ....................... 50,000
28 Total, Section 7.3 $1,330,078
29 Section 7a. The following named amounts, or so much
30 thereof as may be necessary and remain unexpended at the
31 close of business on June 30, 2002, from appropriations and
-63- BOB-CDB03
1 reappropriations made for such purposes in Article 56,
2 Section 4.1 and Article 56a, Section 7a of Public Act 92-8,
3 are reappropriated from the Tobacco Settlement Recovery Fund
4 to the Capital Development Board for the Historic
5 Preservation Agency for the projects hereinafter enumerated:
6 CAHOKIA MOUNDS HISTORIC SITE - ST. CLAIR COUNTY
7 (From Article 56a, Section 7a of Public Act 92-8)
8 For replacing Orientation Theater
9 screen and film .............................. $ 615,360
10 LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
11 (From Article 56, Section 4.1 of Public Act 92-8)
12 For providing roads, parking areas, lighting
13 plaza and pedestrian bridges, in addition
14 to funds previously appropriated ............. 400,000
15 (From Article 56a, Section 7a of Public Act 92-8)
16 For providing roads, parking areas and
17 pedestrian bridges ........................... 125,000
18 OLD STATE CAPITOL - SPRINGFIELD
19 For providing back-up generator ................ 210,902
20 Total, Section 7a $1,351,262
21 Section 8. The following named amounts, or so much
22 thereof as may be necessary and remain unexpended at the
23 close of business on June 30, 2002, from appropriations and
24 reappropriations heretofore made for such purposes in Article
25 56, Section 6, and Article 56a, Section 9 of Public Act 92-8,
26 as amended, are reappropriated from the Capital Development
27 Fund to the Capital Development Board for the Department of
28 Human Services for the projects hereinafter enumerated:
29 ALTON MENTAL HEALTH CENTER - MADISON COUNTY
30 (From Article 56, Section 6 of Public Act 92-8)
31 For renovating the Forensic Complex and
-64- BOB-CDB03
1 constructing two building additions, in
2 addition to funds previously appropriated .... $ 3,900,000
3 (From Article 56a, Section 9 of Public Act 92-8)
4 For renovating the central dietary,
5 Phase II, in addition to funds previously
6 appropriated ................................. 1,205,365
7 For constructing two building additions
8 at the Forensic Complex ...................... 10,903,549
9 For rehabilitation of the central dietary ...... 452,848
10 CHESTER MENTAL HEALTH CENTER
11 (From Article 56, Section 6 of Public Act 92-8)
12 For renovating support and residential areas,
13 in addition to funds previously
14 appropriated ................................. 996,000
15 For replacing smoke/heat detectors ............. 395,000
16 (From Article 56a, Section 9 of Public Act 92-8)
17 For upgrading energy management system ......... 234,334
18 For replacing sewer lines ...................... 648,047
19 For upgrading access control/duress system ..... 1,072,422
20 For renovating kitchen area .................... 891,592
21 For replacing fencing and upgrading
22 recreational yard ............................ 141,667
23 For renovating support and residential
24 area ......................................... 533,063
25 CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
26 For upgrading fire/life safety systems, in
27 addition to funds previously appropriated .... 114,374
28 For renovating residential units, in
29 addition to funds previously
30 appropriated ................................. 2,171,000
31 For renovation of the West Campus Nurses'
32 Stations ..................................... 228,250
33 For renovation of Henry Horner Children's
34 Center and West Campus for fire and
-65- BOB-CDB03
1 life safety codes ............................ 70,147
2 For renovation of the West Campus shower
3 and toilet rooms ............................. 248,923
4 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
5 For replacing cooling towers ................... 439,421
6 For planning and beginning the
7 renovation of Life Skills Building .......... 845,939
8 ELGIN MENTAL HEALTH CENTER - KANE COUNTY
9 For replacing power plant and engineering
10 building ..................................... 7,957,077
11 For renovating the central dietary
12 and kitchen .................................. 3,786,331
13 For construction of an Adult Psychiatric
14 Building, in addition to funds previously
15 appropriated ................................. 3,681,000
16 For construction of roads, parking lots
17 and street lights ............................ 1,130,038
18 For upgrading and expanding the mechanical
19 infrastructure, in addition to funds
20 previously appropriated ...................... 2,144,367
21 For construction of a forensic services complex
22 at Elgin Mental Health Center, in addition
23 to funds previously appropriated ............. 3,350,612
24 For construction of a forensic services
25 complex, in addition to funds previously
26 appropriated ................................. 43,144
27 For renovation of the HVAC systems,
28 replacement of windows and installation
29 of security screens, in addition
30 to funds previously appropriated ............. 2,062,047
31 For construction of a Forensic Services
32 Facility, in addition to funds
33 previously appropriated ..................... 227,380
34 For planning the renovation of the Forensic
-66- BOB-CDB03
1 Building and abating asbestos ................ 237,723
2 For renovation of the Central Stores
3 Building ..................................... 85,679
4 For the demolition of the Old Main Building
5 and construction of an Adult
6 Psychiatric Center ........................... 75,736
7 FOX DEVELOPMENTAL CENTER - DWIGHT
8 (From Article 56, Section 6 of Public Act 92-8)
9 For planning and beginning replacement
10 of interior doors and flooring
11 and repairing walls in the Main and
12 Administration Buildings ..................... 1,205,000
13 (From Article 56a, Section 9 of Public Act 92-8)
14 For replacing sewer lines ...................... 71,801
15 For upgrading electrical system and installing
16 an emergency generator ....................... 523,185
17 For replacement of absorbers and
18 upgrading HVAC system ........................ 35,808
19 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
20 (From Article 56, Section 6 of Public Act 92-8)
21 For replacing HVAC and duct work ............... 480,003
22 (From Article 56a, Section 9 of Public Act 92-8)
23 For completing upgrade of tunnels,
24 Phase II, in addition to funds previously
25 appropriated ................................. 2,970,000
26 For renovating the kitchen ..................... 103,316
27 For renovating residences, in addition to
28 funds previously appropriated ................ 2,230,384
29 For replacing roofs ............................ 21,272
30 For planning and rehabilitation of
31 utility tunnels .............................. 48,655
32 For renovation of residential bu