CAPITAL PROJECTS - TO CDB
FUND NEW APPROPS. REAPPROPS. TOTAL
General Revenue $20,000.0 $41,524.6 $61,524.6
School
Construction 200,000.0 .0 200,000.0
School
Infrastructure 38,000.0 30,000.0 68,000.0
Capital
Development 370,508.9 938,144.7 1,308,757.4
Asbestos
Abatement 0 272.2 272.2
TOTAL 628,508.9 1,009,941.5 1,638,554.2
CAPITAL PROJECTS - TO AGENCIES
CAPITAL DEVELOPMENT FUND
Sec. of St. $0 $4.6 $4.6
Space Needs
Comm. 0 4.8 4.8
EIU 0 37.9 37.9
ISU 0 1,534.7 1,534.7
NEIU 0 4,000.0 4,000.0
NIU 0 65.5 65.5
SIU-Carbondale 0 38.8 38.8
UofI-Urbana-Cham. 0 154.4 154.4
TOTAL 0 5,840.7 5,840.7
GENERAL REVENUE FUND
Historic Preservation 0 400.0 400.0
TOTAL GRF 20,000.0 41,924.6 61,924.6
TOTAL CDF 370,508.9 943,985.5 1,314,598.1
BUILD ILLINOIS PROJECTS
FUND REAPPROPRIATIONS
Build Illinois Purposes $5,306.8
Build Illinois Bond 144,072.8
TOTAL $149,379.6
BOB-CAPITAL99
BOB-CAPITAL99
1 AN ACT making appropriations and reappropriations.
2 Be it enacted by the People of the State of Illinois,
3 represented in the General Assembly:
4 ARTICLE 1
5 Section 1. The following named amounts, or so much
6 thereof as may be necessary, are appropriated from the
7 Capital Development Fund to the Capital Development Board for
8 the Department of Agriculture for the projects hereinafter
9 enumerated:
10 DUQUOIN
11 For constructing four livestock barns
12 (Phase II) ................................... $ 688,000
13 SPRINGFIELD
14 For replacing and renovating
15 racehorse barns (Phase II) ................... 1,000,000
16 For rehabilitating sidewalks, curbs,
17 streets, and gutters, in addition to funds
18 previously appropriated ...................... 1,421,000
19 For replacing and rehabilitating roofs ......... 1,279,000
20 For renovating #26 Barn ........................ 736,000
21 Total, Section 1 $5,124,000
22 Section 1a. The following named amount, or so much
23 thereof as may be necessary, is appropriated from the General
24 Revenue Fund to the Capital Development Board for the
25 Department of Agriculture for the project hereinafter
26 enumerated:
27 SPRINGFIELD
28 For surveying the electrical system ............ $ 195,000
29 Total, Section 1a $195,000
-2- BOB-CAPITAL99
1 Section 2. The following named amounts, or so much
2 thereof as may be necessary, are appropriated from the
3 Capital Development Fund to the Capital Development Board for
4 the Department of Central Management Services for the
5 projects hereinafter enumerated:
6 ILLINOIS CENTER FOR REHABILITATION
7 AND EDUCATION (ROOSEVELT) - CHICAGO
8 For converting and renovating tub rooms ........ $ 425,000
9 JAMES R. THOMPSON CENTER - CHICAGO
10 For replacing roofing system and
11 insulation, in addition to funds
12 previously appropriated ...................... 950,000
13 MARION REGIONAL OFFICE BUILDING
14 For replacing HVAC system and interior
15 lighting ..................................... 1,600,000
16 OTTAWA STATE GARAGE
17 For replacing state garage ..................... 1,400,000
18 SUBURBAN NORTH REGIONAL OFFICE
19 BUILDING - DES PLAINES
20 For renovating offices for Environmental
21 Protection Agency, in addition to funds
22 previously appropriated ...................... 1,635,000
23 Total, Section 2 $6,010,000
24 Section 2a. The following named amount, or so much
25 thereof as may be necessary, is appropriated from the General
26 Revenue Fund to the Capital Development Board for the
27 Department of Central Management Services for the project
28 hereinafter enumerated:
29 CHICAGO MEDICAL CENTER - OFFICE AND LABORATORY
30 For rehabilitating exterior .................... $ 390,000
31 Total, Section 2a $390,000
32 Section 3. The following named amounts, or so much
-3- BOB-CAPITAL99
1 thereof as may be necessary, are appropriated from the
2 Capital Development Fund to the Capital Development Board for
3 the Department of Corrections for the projects hereinafter
4 enumerated:
5 HANNA CITY WORK CAMP
6 For upgrading electrical system ................ $ 600,000
7 HILL CORRECTIONAL CENTER - GALESBURG
8 For upgrading and expanding freezer
9 capacity, in addition to funds
10 previously appropriated ...................... 950,000
11 For replacing domestic water lines ............. 410,000
12 IYC - ST. CHARLES
13 For planning upgrade of existing
14 facility ..................................... 600,000
15 IYC - VALLEY VIEW - ST. CHARLES
16 For completing upgrade of restrooms, in
17 addition to funds previously appropriated .... 300,000
18 LOGAN CORRECTIONAL CENTER - LINCOLN
19 For planning replacement of the Dietary
20 and Medical Buildings ........................ 400,000
21 MENARD CORRECTIONAL CENTER - CHESTER
22 For completing upgrade of North Cellhouse
23 plumbing system, in addition to funds
24 previously appropriated ...................... 400,000
25 For planning upgrade of the storm tunnel ....... 100,000
26 For replacing toilets and waste lines
27 at E/W Cellhouse ............................. 2,600,000
28 PONTIAC CORRECTIONAL CENTER
29 For completing replacement of hot water
30 lines, in addition to funds previously
31 appropriated ................................. 1,100,000
32 STATEVILLE CORRECTIONAL CENTER - JOLIET
33 For replacing power plant ...................... 10,000,000
34 For planning, design, construction,
-4- BOB-CAPITAL99
1 equipment and all other necessary costs
2 for an Adult Reception and Classification
3 Center ....................................... 44,000,000
4 For upgrading storm drainage and
5 wastewater systems ........................... 1,200,000
6 For upgrading electrical system and elevator
7 and installing HVAC system ................... 1,200,000
8 VIENNA CORRECTIONAL CENTER
9 For completing upgrade of the steam
10 distribution system, in addition to
11 funds previously appropriated ................ 940,000
12 For upgrading electrical system and
13 installing emergency generator ............... 1,200,000
14 STATEWIDE
15 For planning, design, construction,
16 equipment and all other necessary costs
17 for a juvenile facility ...................... 20,000,000
18 For replacing locks and doors at the
19 following locations at the approximate
20 cost set forth below ......................... 1,090,000
21 Dwight Correctional Center ......... 275,000
22 Illinois River Correctional
23 Center - Canton ................... 150,000
24 IYC - Joliet ....................... 500,000
25 IYC - Pere Marquette - Grafton ..... 165,000
26 For replacing roofing systems at the following
27 locations at the approximate cost set forth
28 below ........................................ 2,875,000
29 Dixon Correctional Center,
30 four buildings .................... 900,000
31 IYC - St. Charles, two buildings ... 455,000
32 Joliet Correctional Center,
33 six buildings ..................... 875,000
34 Logan Correctional Center - Lincoln
-5- BOB-CAPITAL99
1 three buildings ................... 115,000
2 Menard Correctional Center - Chester
3 six buildings ..................... 275,000
4 Pontiac Correctional Center,
5 one building ...................... 255,000
6 For inspecting and upgrading water towers
7 at the following locations at the approximate
8 costs set forth below ........................ 3,590,000
9 Dixon Correctional Center,
10 Upgrade Water Tower ............. 1,000,000
11 Graham Correctional Center - Hillsboro
12 Upgrade Water Tower .............. 215,000
13 Joliet Correctional Center,
14 Upgrade Water Tower ............... 150,000
15 Logan Correctional Center - Lincoln
16 Complete Water Tower Upgrade ..... 600,000
17 Menard Correctional Center - Chester
18 Upgrade Water Tower .............. 325,000
19 Stateville Correctional Center - Joliet
20 Upgrade Water Tower ............ 1,000,000
21 Statewide, Inspect and Upgrade
22 Water Towers ...................... 300,000
23 For upgrading fire and safety systems at
24 the following locations at the approximate
25 costs set forth below, in addition to
26 funds previously appropriated ................ 3,370,000
27 Menard Correctional Center -
28 Chester ......................... 2,200,000
29 Sheridan Correctional Center ....... 320,000
30 Vienna Correctional Center ......... 850,000 ____________
31 Total, Section 3 $96,925,000
32 Section 4. The following named amounts, or so much
33 thereof as may be necessary, are appropriated from the
-6- BOB-CAPITAL99
1 Capital Development Fund to the Capital Development Board for
2 the Historic Preservation Agency for the projects hereinafter
3 enumerated:
4 BEISMAN HOUSE - GALENA HISTORIC SITE
5 For rehabilitating Beisman House ............... $ 427,000
6 BISHOP HILL HISTORIC SITE -
7 HENRY COUNTY
8 For rehabilitating Bjorkland Hotel ............. 1,010,000
9 LEWIS AND CLARK STATE MEMORIAL -
10 MADISON COUNTY
11 For constructing interpretive center,
12 in addition to funds previously
13 appropriated ................................. 1,700,000
14 LINCOLN LOG CABIN HISTORIC SITE -
15 COLES COUNTY
16 For constructing visitors center, Phase II,
17 and developing day use area .................. 1,669,000
18 LINCOLN'S NEW SALEM HISTORIC SITE - PETERSBURG
19 For renovating village entrance and
20 completing visitors center ................... 735,000
21 LINCOLN PRESIDENTIAL CENTER -
22 SPRINGFIELD
23 For planning Lincoln Presidential Center,
24 in addition to funds previously
25 appropriated ................................. 2,200,000
26 OLD STATE CAPITOL - SPRINGFIELD
27 For rehabilitating Old State Capitol ........... 1,159,000
28 POSTVILLE COURTHOUSE HISTORIC SITE -
29 LINCOLN
30 For rehabilitating Courthouse and site ......... 368,000
31 VACHEL LINDSAY HOME - SPRINGFIELD
32 For rehabilitating home ........................ 762,000
33 VANDALIA STATE HOUSE HISTORIC SITE
34 For replacing roof and rehabilitating
-7- BOB-CAPITAL99
1 exterior ..................................... 508,000
2 Total, Section 4 $10,538,000
3 Section 4a. The following named amounts, or so much
4 thereof as may be necessary, are appropriated from the
5 General Revenue Fund to the Capital Development Board for the
6 Historic Preservation Agency for the projects hereinafter
7 enumerated:
8 FORT DE CHARTRES HISTORIC SITE -
9 RANDOLPH COUNTY
10 For planning restoration of powder magazine .... $ 100,000
11 LINCOLN'S NEW SALEM HISTORIC SITE -
12 PETERSBURG
13 For removing sewage lagoon and treatment
14 plant ........................................ 407,000
15 For rehabilitating saw mill and grist
16 mill ......................................... 219,000
17 METAMORA COURTHOUSE HISTORIC SITE
18 For rehabilitating courthouse .................. 474,000
19 Total, Section 4a $1,200,000
20 Section 5. The following named amounts, or so much
21 thereof as may be necessary, are appropriated from the
22 Capital Development Fund to the Capital Development Board for
23 the Department of Human Services (formerly Department of
24 Mental Health and Developmental Disabilities) for the
25 projects hereinafter enumerated:
26 CHESTER MENTAL HEALTH CENTER
27 For renovating kitchen area .................... $ 967,000
28 CHICAGO-READ MENTAL HEALTH CENTER
29 For upgrading fire/life safety systems,
30 in addition to funds previously appropriated . 235,000
31 CHOATE MENTAL HEALTH CENTER - ANNA
32 For rehabilitating Cypress Building ............ 1,546,000
-8- BOB-CAPITAL99
1 ELGIN MENTAL HEALTH CENTER
2 For replacing power plant and engineering
3 building ..................................... 8,029,000
4 FOX DEVELOPMENTAL CENTER - DWIGHT
5 For renovating dietary, in addition to funds
6 previously appropriated ...................... 857,000
7 HOWE DEVELOPMENTAL CENTER -
8 TINLEY PARK
9 For replacing roofs ............................ 81,000
10 For planning access to water supply from
11 village ...................................... 78,000
12 For planning and rehabilitation of
13 utility tunnels .............................. 250,000
14 LINCOLN DEVELOPMENTAL CENTER
15 For upgrading power plant and installing
16 EMS, in addition to funds previously
17 appropriated ................................. 1,795,000
18 For renovating Elmhurst Cottage ................ 1,905,000
19 LUDEMAN DEVELOPMENTAL CENTER -
20 PARK FOREST
21 For replacing plumbing, HVAC and boiler
22 systems ...................................... 796,000
23 MCFARLAND MENTAL HEALTH CENTER -
24 SPRINGFIELD
25 For renovating Stevenson Hall .................. 984,000
26 SHAPIRO DEVELOPMENTAL CENTER -
27 KANKAKEE
28 For planning upgrade of steam and
29 condensate lines ............................. 320,000
30 For rehabilitating HVAC systems ................ 1,166,000
31 SINGER MENTAL HEALTH CENTER - ROCKFORD
32 For replacing roofs ............................ 248,000
33 TINLEY PARK MENTAL HEALTH CENTER
34 For upgrading fire/life safety systems
-9- BOB-CAPITAL99
1 and bedroom lighting, in addition to
2 funds previously appropriated ................ 236,000
3 Total, Section 5 $19,493,000
4 Section 5a. The following named amounts, or so much
5 thereof as may be necessary, are appropriated from the
6 General Revenue Fund to the Capital Development Board for the
7 Department of Human Services (formerly Department of Mental
8 Health and Developmental Disabilities) for the projects
9 hereinafter enumerated:
10 FOX DEVELOPMENTAL CENTER - DWIGHT
11 For replacing windows .......................... $ 578,000
12 JACKSONVILLE DEVELOPMENTAL CENTER
13 For replacing stoker and controls .............. 206,000
14 For planning the rehabilitation of
15 smokestack ................................... 80,000
16 STATEWIDE
17 For resurfacing roads at Chicago-Read,
18 Tinley Park and Murray ....................... 2,000,000
19 Total, Section 5a $2,864,000
20 Section 5.1. The following named amounts, or so much
21 thereof as may be necessary, are appropriated from the
22 Capital Development Fund to the Capital Development Board for
23 the Department of Human Services (formerly Department of
24 Rehabilitation Services) for the projects hereinafter
25 enumerated:
26 ILLINOIS SCHOOL FOR THE DEAF -
27 JACKSONVILLE
28 For installing HVAC and upgrading electrical
29 and replacing doors .......................... $ 1,400,000
30 ILLINOIS SCHOOL FOR THE VISUALLY
31 IMPAIRED - JACKSONVILLE
32 For installing sewers .......................... 1,200,000
-10- BOB-CAPITAL99
1 For constructing a new building to
2 replace buildings 2, 3 and 4,
3 in addition to funds previously
4 appropriated ................................. 3,300,000
5 Total, Section 5.1 $5,900,000
6 Section 5a.1. The following named amounts, or so much
7 thereof as may be necessary, are appropriated from the
8 General Revenue Fund to the Capital Development Board for the
9 Department of Human Services (formerly Department of
10 Rehabilitation Services) for the projects hereinafter
11 enumerated:
12 ILLINOIS SCHOOL FOR THE DEAF -
13 JACKSONVILLE
14 For installing humidity controls ............... $ 155,000
15 For installing an all-weather
16 running track ................................ 190,000
17 Total, Section 5a.1 $345,000
18 Section 6. The following named amounts, or so much
19 thereof as may be necessary, are appropriated from the
20 Capital Development Fund to the Capital Development Board for
21 the Department of Military Affairs for the projects
22 hereinafter enumerated:
23 CRESTWOOD ARMORY
24 For replacing roofing system and
25 rehabilitating exterior ...................... $ 1,228,000
26 SPRINGFIELD CAMP LINCOLN
27 For renovating heating system and
28 replacing windows ............................ 908,000
29 DIXON ARMORY
30 For upgrading mechanical and electrical
31 systems ...................................... 1,866,000
32 WEST FRANKFORT ARMORY
-11- BOB-CAPITAL99
1 For replacing roofs and rehabilitating
2 exterior ..................................... 1,197,000
3 WAUKEGAN ARMORY
4 For replacing roofing system ................... 415,000
5 Total, Section 6 $5,614,000
6 Section 7. The following named amounts, or so much
7 thereof as may be necessary, are appropriated from the
8 Capital Development Fund to the Capital Development Board for
9 the Department of Natural Resources for the projects
10 hereinafter enumerated:
11 BABE WOODYARD STATE NATURAL AREA -
12 VERMILION COUNTY
13 For developing the site and associated
14 land acquisition ............................. $ 3,300,000
15 BEALL WOODS STATE CONSERVATION AREA -
16 WABASH COUNTY
17 For replacing a visitors center ................ 488,000
18 CAVE-IN-ROCK STATE PARK -
19 HARDIN COUNTY
20 For constructing a shower building
21 and upgrading the campground ................. 650,000
22 FERNE CLYFFE STATE PARK -
23 JOHNSON COUNTY
24 For rehabilitating shower building ............. 215,000
25 FOX RIDGE STATE PARK - COLES COUNTY
26 For upgrading campground ....................... 340,000
27 HORSESHOE LAKE CONSERVATION AREA -
28 ALEXANDER COUNTY
29 For replacing the hunter check station ......... 150,000
30 ILLINOIS BEACH STATE PARK -
31 LAKE COUNTY
32 For constructing an office building ............ 650,000
33 For replacing sanitary sewer lines ............. 505,000
-12- BOB-CAPITAL99
1 LINCOLN TRAIL STATE RECREATION AREA -
2 CLARK COUNTY
3 For rehabilitating the day use area
4 and site ..................................... 1,281,000
5 NAUVOO STATE PARK - HANCOCK COUNTY
6 For replacing water distribution
7 system ....................................... 241,000
8 PERE MARQUETTE STATE PARK -
9 JERSEY COUNTY
10 For replacing the lodge HVAC condensing unit, in
11 addition to funds previously appropriated .... 334,000
12 RAMSEY LAKE STATE PARK -
13 FAYETTE COUNTY
14 For rehabilitating shower building ............. 188,000
15 SPRINGFIELD
16 For constructing an office building and
17 interpretive center .......................... 30,000,000
18 STATE MUSEUM - SPRINGFIELD
19 For renovating or replacing exhibits in,
20 addition to funds previously appropriated .... 5,500,000
21 For planning replacement of the state
22 museum ....................................... 800,000
23 STARVED ROCK STATE PARK - LASALLE COUNTY
24 For rehabilitating the sewer system ............ 1,055,000
25 For rehabilitating trails, in addition
26 to funds previously appropriated ............. 500,000
27 For upgrading the HVAC system .................. 445,000
28 TUNNEL HILL-CACHE RIVER STATE NATURAL AREA
29 For constructing a visitor center and
30 purchasing land .............................. 4,000,000
31 WATER SURVEY - CHAMPAIGN
32 For upgrading and replacing the mechanical
33 system, in addition to funds
34 previously appropriated ...................... 2,200,000
-13- BOB-CAPITAL99
1 STATEWIDE
2 For replacing roofing systems at the
3 following locations at the approximate
4 costs set forth below ........................ 370,000
5 Lincoln Trail Homestead State
6 Park, Four buildings ............... 38,000
7 Silver Springs State Park, Three
8 Buildings ......................... 278,000
9 Weldon Springs State Park, Nine
10 Buildings .......................... 54,000
11 For constructing vault toilets at the following
12 locations at the approximate costs set forth
13 below ........................................ 852,000
14 Cave-In-Rock State Park ............ 192,000
15 Frank Holten State Park ............ 285,000
16 Golconda/Rauchfuss Hill ............. 79,000
17 I&M Canal - Gebhard Woods State
18 Park ............................... 35,000
19 Prophetstown State Park ............ 155,000
20 William W. Powers State Park ....... 106,000
21 For constructing hazardous material storage
22 buildings .................................... 275,000
23 Total, Section 7 $54,339,000
24 Section 7a. The following named amounts, or so much
25 thereof as may be necessary, are appropriated from the
26 General Revenue Fund to the Capital Development Board for the
27 Department of Natural Resources for the projects hereinafter
28 enumerated:
29 APPLE RIVER CANYON STATE PARK -
30 JO DAVIESS COUNTY
31 For stabilizing the river bank ................. $ 150,000
32 GOLCONDA MARINA - POPE COUNTY
33 For constructing a sewage lift station ......... 50,000
-14- BOB-CAPITAL99
1 ILLINOIS BEACH STATE PARK -
2 LAKE COUNTY
3 For stabilizing the shoreline .................. 400,000
4 STARVED ROCK STATE PARK -
5 LASALLE COUNTY
6 For constructing erosion controls .............. 300,000
7 STATEWIDE
8 For maintaining lodge and concession
9 facilities ................................... 400,000
10 For rehabilitating or replacing playground
11 equipment .................................... 300,000
12 Total, Section 7a $1,600,000
13 Section 8a. The following named amount, or so much
14 thereof as may be necessary, is appropriated from the General
15 Revenue Fund to the Capital Development Board for the
16 Department of Revenue for the project hereinafter enumerated:
17 WILLARD ICE BUILDING - SPRINGFIELD
18 For resealing and replacing atrium windows ..... $ 1,208,000
19 Total, Section 8a $1,208,000
20 Section 9. The following named amounts, or so much
21 thereof as may be necessary, are appropriated from the
22 Capital Development Fund to the Capital Development Board for
23 the Department of State Police for the projects hereinafter
24 enumerated:
25 SPRINGFIELD ARMORY
26 For planning and design of the rehabilitation
27 and site improvements of the Springfield
28 Armory, in addition to funds previously
29 appropriated ................................. 1,500,000
30 STATEWIDE
31 For replacing the roofing systems at various
32 facilities at the approximate costs set
-15- BOB-CAPITAL99
1 forth below .................................. 167,000
2 District 17 - LaSalle ............... 41,000
3 Springfield, Radio Repair
4 Laboratory ......................... 36,000
5 Springfield, Communications
6 Building ........................... 90,000
7 For replacing radio communication towers,
8 equipment buildings and installing emergency
9 power generators at the following locations:
10 Pecatonica, Elwood, Kingston, Mason
11 City ......................................... 2,000,000
12 Total, Section 9 $3,667,000
13 Section 9a. The following named amount, or so much
14 thereof as may be necessary, is appropriated from the General
15 Revenue Fund to the Capital Development Board for the
16 Department of State Police for the project hereinafter
17 enumerated:
18 TRAINING FACILITY - PAWNEE
19 For rehabilitating the driving track ........... $ 513,000
20 Total, Section 9a $513,000
21 Section 10. The following named amounts, or so much
22 thereof as may be necessary, are appropriated from the
23 Capital Development Fund to the Capital Development Board for
24 the Department of Veterans' Affairs for the projects
25 hereinafter enumerated:
26 MANTENO VETERANS' HOME
27 For constructing a multi-purpose
28 building ..................................... $ 439,000
29 QUINCY VETERANS' HOME
30 For improvements to meet licensure
31 standards .................................... 9,000,000
32 Total, Section 10 $9,439,000
-16- BOB-CAPITAL99
1 Section 10a. The following named amounts, or so much
2 thereof as may be necessary, are appropriated from the
3 General Revenue Fund to the Capital Development Board for the
4 Department of Veterans' Affairs for the projects hereinafter
5 enumerated:
6 ILLINOIS VETERANS' HOME - ANNA
7 Complete visitors center, in addition
8 to funds previously appropriated ............. $ 100,000
9 For installing lighting, benches,
10 landscaping and ADA improvements ............. 934,000
11 ILLINOIS VETERANS' HOME - LASALLE
12 For installing wall protection ................. 107,000
13 ILLINOIS VETERANS' HOME - QUINCY
14 For resurfacing Schapers Hospital
15 parking lot .................................. 91,000
16 ILLINOIS VETERANS' HOME - MANTENO
17 For tuckpointing and repairing masonry ......... 1,026,000
18 Total, Section 10a $2,258,000
19 Section 11.01. The following named amounts, or so much
20 thereof as may be necessary, are appropriated from the
21 Capital Development Fund to the Capital Development Board for
22 projects hereinafter enumerated:
23 FIFTH DISTRICT APPELLATE COURT -
24 MT. VERNON
25 For expanding the courthouse ................... $ 1,625,000
26 SUPREME COURT BUILDING - SPRINGFIELD
27 For replacing plumbing system .................. 1,000,000
28 ATTORNEY GENERAL'S OFFICE -
29 SPRINGFIELD
30 For planning an annex or addition and
31 parking facilities ........................... 200,000
32 Total, Section 11.01 $2,825,000
-17- BOB-CAPITAL99
1 Section 11.01a. The following named amounts, or so much
2 thereof as may be necessary, are appropriated from the
3 General Revenue Fund to the Capital Development Board for
4 projects hereinafter enumerated:
5 SECOND DISTRICT APPELLATE COURT - ELGIN
6 For upgrading mechanical systems
7 and building exterior ........................ 190,000
8 EXECUTIVE MANSION - SPRINGFIELD
9 For renovating interior, exterior and site,
10 in addition to funds previously appropriated . 190,000
11 Total, Section 11.01a $380,000
12 Section 11.02. The following named amounts, or so much
13 thereof as may be necessary, are appropriated from the
14 Capital Development Fund to the Capital Development Board for
15 projects hereinafter enumerated:
16 CAPITOL COMPLEX
17 For upgrading HVAC system at the Archives
18 Building, in addition to funds previously
19 appropriated ................................. $ 375,000
20 For renovating 222 South College
21 Building ..................................... 2,500,000
22 Total, Section 11.02 $2,875,000
23 Section 11.03. The following named amounts, or so much
24 thereof as may be necessary, are appropriated from the
25 Capital Development Fund to the Capital Development Board for
26 projects hereinafter enumerated:
27 For surveys and modifications to buildings
28 to meets requirements of the federal
29 Americans With Disabilities Act .............. $ 5,000,000
30 For retrofitting or upgrading mechanized
31 refrigeration equipment (CFCs) ............... 7,000,000
32 For abating hazardous materials ................ 5,000,000
-18- BOB-CAPITAL99
1 For upgrading and remediating underground
2 storage tanks ................................ 7,500,000
3 Total, Section 11.03 $24,500,000
4 Section 11.03a. The following named amounts, or so much
5 thereof as may be necessary, are appropriated from the
6 General Revenue Fund to the Capital Development Board for
7 projects hereinafter enumerated:
8 STATEWIDE
9 For surveying and abating asbestos-
10 containing materials ......................... $ 1,000,000
11 For remediating minor problems
12 and emergencies .............................. 3,002,000
13 For conducting construction site
14 archeological studies ........................ 245,000
15 For demolishing buildings ...................... 4,800,000
16 Total, Section 11.03a $9,047,000
17 Section 12. The following named amounts, or so much
18 thereof as may be necessary, are appropriated from the
19 Capital Development Fund to the Capital Development Board for
20 the Illinois Community College Board for the projects
21 hereinafter enumerated:
22 CITY COLLEGES OF CHICAGO/KENNEDY KING
23 For remodeling for a culinary arts
24 educational facility ......................... $ 10,875,000
25 JOHN WOOD COMMUNITY COLLEGE - QUINCY
26 For planning campus buildings and site
27 improvements ................................. 1,871,800
28 JOLIET JUNIOR COLLEGE
29 For remodeling campus buildings ................ 220,900
30 LAKE LAND COLLEGE - MATTOON
31 For constructing a classroom/administration
32 building and purchasing equipment, in addition
-19- BOB-CAPITAL99
1 to funds previously appropriated ............. 5,336,800
2 LEWIS AND CLARK COMMUNITY COLLEGE - GODFREY
3 For constructing a classroom/administration
4 building ..................................... 10,125,000
5 LINCOLN LAND COMMUNITY COLLEGE - SPRINGFIELD
6 For constructing an addition and remodeling
7 Sangamon and Menard Halls .................... 3,777,700
8 MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS
9 For constructing a classroom/administration
10 building, providing site improvements and
11 purchasing equipment, in addition to
12 funds previously appropriated ................ 8,309,200
13 REND LAKE COLLEGE - INA
14 For replacing utility piping ................... 1,546,400
15 Total, Section 12 $42,062,800
16 Section 13. The following named amounts, or so much
17 thereof as may be necessary, are appropriated from the
18 Capital Development Fund to the Capital Development Board for
19 the Board of Higher Education for the projects hereinafter
20 enumerated:
21 MATH AND SCIENCE ACADEMY - AURORA
22 For replacing carpeting, constructing storage
23 building and various site improvements,
24 including extending communications
25 conduit system ............................... $ 1,310,000
26 CHICAGO STATE UNIVERSITY - COOK COUNTY
27 For upgrading campus infrastructure, in
28 addition to the funds previously appropriated . 2,700,000
29 EASTERN ILLINOIS UNIVERSITY - CHARLESTON
30 For upgrading campus buildings for health,
31 safety and environmental improvements ........ 1,302,100
32 GOVERNORS STATE UNIVERSITY - PARK FOREST
33 For planning main building renovations,
-20- BOB-CAPITAL99
1 a child development center, and
2 faculty offices .............................. 1,500,000
3 ILLINOIS STATE UNIVERSITY - NORMAL
4 For remodeling Julian and Moulton Halls ........ 7,050,000
5 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
6 For replacing fire alarm systems, lighting
7 and ceilings ................................. 2,561,800
8 NORTHERN ILLINOIS UNIVERSITY - DEKALB
9 For upgrading storm waterway controls in
10 addition to funds previously appropriated .... 6,716,000
11 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
12 For upgrading and remodeling Anthony
13 Hall ......................................... 3,131,100
14 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
15 For purchasing equipment for the Engineering
16 Building ..................................... 6,000,000
17 SOUTHERN ILLINOIS UNIVERSITY -
18 EDWARDSVILLE/E. ST. LOUIS
19 For planning a classroom/administration
20 facility in addition to funds previously
21 appropriated ................................. 1,179,600
22 UNIVERSITY OF ILLINOIS - CHICAGO
23 For remodeling the Clinical
24 Sciences Building ............................ 15,000,000
25 UNIVERSITY OF ILLINOIS -
26 URBANA/CHAMPAIGN
27 For remodeling the Mechanical Engineering
28 Laboratory Building .......................... 7,365,000
29 UNIVERSITY OF ILLINOIS - SPRINGFIELD
30 For constructing and improving campus
31 roadways, in addition to funds previously
32 appropriated ................................. 2,412,700
33 WESTERN ILLINOIS UNIVERSITY - MACOMB
34 For constructing a utility tunnel and
-21- BOB-CAPITAL99
1 installing piping, lines and cables .......... 6,313,400
2 For remodeling Horrabin and Simpkins
3 Halls, in addition to funds
4 previously appropriated....................... 1,655,400
5 Total, Section 13 $66,197,100
6 Section 14. The sum of $11,244,000, or so much thereof
7 as may be necessary, is appropriated from the Capital
8 Development Fund to the Capital Development Board for the
9 Board of Higher Education for miscellaneous capital
10 improvements including construction, capital facilities, cost
11 of planning, various universities set forth below. This
12 appropriation shall be in addition to any other appropriated
13 amounts which can be expended for these purposes.
14 For Chicago State University ........... 226,000
15 For Eastern Illinois University ........ 423,100
16 For Governors State University ......... 136,200
17 For Illinois State University .......... 863,000
18 For Northeastern Illinois University ... 317,800
19 For Northern Illinois University ....... 965,800
20 For Western Illinois University ........ 646,800
21 For Southern Illinois University -
22 Carbondale ......................... 1,493,600
23 For Southern Illinois University -
24 Edwardsville ......................... 563,600
25 For University of Illinois - Chicago . 2,460,300
26 For University of Illinois -
27 Springfield .......................... 162,600
28 For University of Illinois -
29 Urbana-Champaign ................... 2,985,200
30 Section 15. The sum of $3,756,000, or so much thereof as
31 may be necessary, is appropriated from the Capital
32 Development Fund to the Capital Development Board for the
-22- BOB-CAPITAL99
1 Illinois Community College Board for miscellaneous capital
2 improvements including construction, capital facilities, cost
3 of planning, supplies, equipment, materials, services and all
4 other expenses required to complete the work at the various
5 universities set forth below. This appropriation shall be in
6 addition to any other appropriated amounts which can be
7 expended for these purposes.
8 Section 16. The sum of $38,000,000, or so much thereof
9 as may be necessary, is appropriated from the School
10 Infrastructure Fund to the Capital Development Board for
11 school construction grants pursuant to the School
12 Construction Law.
13 Section 17. The sum of $200,000,000, or so much thereof
14 as may be necessary, is appropriated from the School
15 Construction Fund to the Capital Development Board for school
16 construction grants pursuant to the School Construction Law.
17 Section 95. No contract shall be entered into or
18 obligation incurred for any expenditures from appropriations
19 made in this Article until after the purposes and amounts
20 have been approved in writing by the Governor.
21 ARTICLE 2
22 Section 1. The following named amounts, or so much
23 thereof as may be necessary and remain unexpended at the
24 close of business on June 30, 1998, from appropriations and
25 reappropriations heretofore made for such purposes in Section
26 52 of Public Act 90-0550 and Article 94, Sections 1 and 1A of
27 Public Act 90-0010, are reappropriated from the Capital
28 Development Fund to the Capital Development Board for the
29 Department of Agriculture for the projects hereinafter
-23- BOB-CAPITAL99
1 enumerated:
2 ANIMAL DISEASE LABORATORY - CENTRALIA
3 (From Article 94, Section 1A of Public Act 90-0010)
4 For upgrading the diagnostic laboratory
5 facility, in addition to funds previously
6 appropriated ................................. $ 200,000
7 (From Article 94, Section 1 of Public Act 90-0010)
8 For purchasing and upgrading
9 diagnostic laboratory ........................ 506,979
10 DUQUOIN STATE FAIRGROUNDS
11 (From Section 52 of Public Act 90-0550)
12 For planning the renovation of the
13 Round Houses ................................. 40,000
14 (From Article 94, Section 1 of Public Act 90-0010):
15 For replacement of the grandstand
16 bleachers .................................... 759,335
17 For planning and construction of
18 a livestock complex .......................... 6,837
19 For rehabilitation of the Grandstand ........... 13,403
20 For upgrading the racetrack, including the
21 racetrack walls .............................. 2,621,797
22 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
23 (From Section 52 of Public Act 90-0550)
24 For replacing the HVAC system in the
25 Administration Building ...................... 929,000
26 (From Article 94, Section 1A of Public Act 90-0010)
27 For replacing and/or repairing sidewalks,
28 curbs, gutters and streets, in addition
29 to funds previously appropriated ............. 726,766
30 For upgrading the storm/sanitary and water
31 systems, in addition to funds previously
32 appropriated ................................. 1,569,538
33 For renovation or replacement of
34 comfort stations, in addition
-24- BOB-CAPITAL99
1 to funds previously appropriated ............. 1,273,000
2 For upgrading Building 13, in addition to
3 funds previously appropriated ................ 354,035
4 (From Article 94, Section 1 of Public Act 90-0010)
5 For renovation of the comfort stations-
6 Phase I ...................................... 74,803
7 For upgrading Building #13 ..................... 19,844
8 For renovation of the Coliseum ................. 17,122
9 For renovation of the Jr. Livestock Building,
10 including the cover over the outdoor
11 arena, roof, HVAC, plumbing and electrical
12 systems and installation of an elevator
13 for accessibility, and for upgrading
14 the sewer system ............................. 71,858
15 For rehabilitation of the Administration
16 Building, including planning & upgrading
17 laboratories ................................. 49,869
18 For planning the renovation of the show
19 horse barns .................................. 257,229
20 For rehabilitation of six racehorse barns-
21 Phase I ...................................... 165,046
22 For planning the rehabilitation of sidewalks,
23 curbs, gutters and streets ................... 108,724
24 Total, Section 1 $9,765,185
25 Section 2. The following named amounts, or so much
26 thereof as may be necessary and remain unexpended at the
27 close of business on June 30, 1998, from appropriations and
28 reappropriations heretofore made for such purposes in Section
29 61 of Public Act 90-0550; Article 93, Section 11.01 of Public
30 Act 90-0010; and Article 94, Section 2, of Public Act 90-0010
31 are reappropriated from the Capital Development Fund to the
32 Capital Development Board for the Courts of Illinois for the
33 projects hereinafter enumerated:
-25- BOB-CAPITAL99
1 SECOND DISTRICT APPELLATE COURT BUILDING - ELGIN
2 (From Article 93, Section 11.01 of Public Act 90-0010)
3 For replacing the roof ......................... $ 104,000
4 SPRINGFIELD - SUPREME COURT BUILDING
5 (From Section 61 of Public Act 90-0550)
6 For planning the library upgrade ............... 127,000
7 (From Article 94, Section 2 of Public Act 90-0010)
8 For installation of an elevator and
9 replacement of the exterior lights ........... 29,564
10 For repairing the ramp, drainage system,
11 retaining wall and landscaping ............... 19,767
12 Total, Section 2 $280,331
13 Section 2.1. The following named amount, or so much
14 thereof as may be necessary and remains unexpended at the
15 close of business on June 30, 1998, from an appropriation
16 heretofore made for such purposes in Article 93, Section
17 11.01a of Public Act 90-0010, is reappropriated from the
18 General Revenue Fund to the Capital Development Board for the
19 project hereinafter enumerated:
20 SUPREME COURT BUILDING - SPRINGFIELD
21 For tuckpointing and cleaning exterior ...........$ 220,000
22 Section 3. The following named amounts, or so much
23 thereof as may be necessary and remain unexpended at the
24 close of business on June 30, 1998, from appropriations and
25 reappropriations heretofore made for such purposes in Section
26 53 of Public Act 90-0550; Article 93, Section 2 of Public Act
27 90-0010; Article 94, Section 3, of Public Act 90-0010; and
28 Section 3A of Public Act 90-0010, are reappropriated from the
29 Capital Development Fund to the Capital Development Board for
30 the Department of Central Management Services for the
31 projects hereinafter enumerated:
32 ELGIN REGIONAL OFFICE BUILDING
-26- BOB-CAPITAL99
1 (From Section 53 of Public Act 90-0550)
2 For replacing the utility system ............... $ 2,625,000
3 ILLINOIS CENTER FOR REHABILITATION AND
4 EDUCATION (WOOD) - CHICAGO
5 (From Article 93, Section 2 of Public Act 90-0010)
6 For replacing the skylight system
7 and roof flashing ............................ 45,000
8 For installing security system and
9 perimeter lighting ........................... 375,000
10 ILLINOIS CENTER FOR REHABILITATION AND
11 EDUCATION (ROOSEVELT) - CHICAGO
12 (From Article 94, Section 3a of Public Act 90-0010)
13 For upgrading the HVAC system .................. 2,250,000
14 CENTRAL STATE GARAGE - SPRINGFIELD
15 (From Article 93, Section 2 of Public Act 90-0010)
16 For replacing the roof and drainage system ..... 425,000
17 CHICAGO - STATE OF ILLINOIS CENTER
18 (From Article 94, Section 3 of Public Act 90-0010)
19 For completing the installation of elevators, in
20 addition to funds previously appropriated .... 650,760
21 For the correction of design/construction
22 deficiencies, including remedial work in
23 the heating, refrigeration, temperature
24 control and ventilation systems at the
25 State of Illinois Center at Chicago .......... 269,259
26 CHICAGO - STATE OF ILLINOIS BUILDING
27 For planning, renovation, equipment and all
28 other costs associated with the renovation
29 of the State of Illinois Building located
30 at 160 North LaSalle in Chicago, in addition
31 to any other amounts heretofore
32 appropriated for such purpose ................ 16,879
33 For planning for renovation of the building
34 at 160 North LaSalle ......................... 46,367
-27- BOB-CAPITAL99
1 CHICAGO MEDICAL CENTER
2 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
3 For completing the upgrade of HVAC system, in
4 addition to funds previously appropriated .... 81,448
5 For construction of an independent living
6 apartment building ........................... 104,140
7 For rehabilitation of the air conditioning
8 system, installation of a sprinkler system
9 and improvements for handicapped
10 accessibility ................................ 105,913
11 CHICAGO MEDICAL CENTER
12 EVELYN EDWARDS CENTER
13 For replacement of the heating system .......... 25,274
14 CHICAGO MEDICAL CENTER
15 OFFICE AND LABORATORY FACILITY
16 For replacement of the electric autoclave
17 boilers ...................................... 13,222
18 CHICAGO MEDICAL CENTER
19 VISUALLY HANDICAPPED INSTITUTE
20 For renovation of the loading dock ............. 46,058
21 REGIONAL OFFICE BUILDING - CHAMPAIGN
22 For replacement of roofing system and
23 rooftop heating and cooling unit ............. 88,451
24 (From Article 94, Section 3A of Public Act 90-0010)
25 SUBURBAN NORTH REGIONAL OFFICE BUILDING -
26 DES PLAINES
27 For renovation of Suburban North Regional
28 Office Building (formerly Maine Township
29 North High School building), in addition
30 to funds previously appropriated for such
31 purpose, Phase III ........................... 5,400,000
32 For renovation and expansion of garage ......... 375,000
33 (From Article 94, Section 3 of Public Act 90-0010)
34 For designing the renovation, phase III ........ 562,615
-28- BOB-CAPITAL99
1 For the purchase and renovation of the high
2 school ....................................... 17,210
3 OTTAWA STATE GARAGE
4 For rehabilitation of the lighting and
5 electrical systems ........................... 106,694
6 SPRINGFIELD - CAPITOL COMPLEX
7 For construction of a day care center, in
8 addition to funds previously appropriated
9 for such purpose ............................. 950,000
10 For construction of a day care center in the
11 Capitol Complex in Springfield ............... 244,348
12 COMPUTER FACILITY - SPRINGFIELD
13 (From Article 94, Section 3A of Public Act 90-0010)
14 For replacement of the halon fire
15 suppression system ........................... 861,030
16 (From Article 94, Section 3 of Public Act 90-0010)
17 ASH STREET COMPLEX -
18 MUSEUM AND COLLECTION CENTER -
19 SPRINGFIELD
20 For replacement of the roofing system .......... 667,928
21 (From Article 94, Section 3A of Public Act 90-0010)
22 MARION REGIONAL OFFICE BUILDING
23 For construction of a Regional Office
24 Building Addition ............................ 2,000,000
25 Total, Section 3 $18,352,596
26 Section 3.1. The following named amounts, or so much
27 thereof as may be necessary and remain unexpended at the
28 close of business on June 30, 1998, from appropriations and
29 reappropriations heretofore made for such purposes in Article
30 93, Section 2a of Public Act 90-0010, and Article 94, Section
31 3.1 of Public Act 90-0010, are reappropriated from the
32 General Revenue Fund to the Capital Development Board for the
33 Department of Central Management Services for the projects
-29- BOB-CAPITAL99
1 hereinafter enumerated:
2 JAMES R. THOMPSON CENTER - CHICAGO
3 (From Article 93, Section 2a of Public Act 90-0010)
4 For restoring the exterior plaza ............... $ 890,000
5 EAST ST. LOUIS - REGIONAL OFFICE
6 For replacing windows .......................... 65,000
7 CHICAGO MEDICAL CENTER
8 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
9 (From Article 94, Section 3.1 of Public Act 90-0010)
10 For rehabilitation for fire safety and
11 accessibility ................................ 11,086
12 CHICAGO MEDICAL CENTER
13 JUVENILE RESEARCH INSTITUTE
14 For rehabilitation of the interior and
15 exterior walls, planning the rehabilitation
16 of the HVAC system and renovation of
17 the elevator ................................. 23,433
18 Total, Section 3.1 $989,519
19 Section 4. The following named amounts, or so much
20 thereof as may be necessary, and remain unexpended at the
21 close of business on June 30, 1998, from appropriations and
22 reappropriations heretofore made for such purposes in Section
23 58 of Public Act 90-0550; Article 93, Section 7 of Public Act
24 90-0010; Article 94, Section 4 of Public Act 90-0010; and
25 Article 4A of Public Act 90-0010, are reappropriated from the
26 Capital Development Fund to the Capital Development Board for
27 the Department of Natural Resources for the projects
28 hereinafter enumerated:
29 CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
30 (From Article 94, Section 4A of Public Act 90-0010)
31 For construction of a concession building
32 and upgrading the horse concession, in
33 addition to funds previously appropriated .... $ 500,000
-30- BOB-CAPITAL99
1 (From Article 94, Section 4 of Public Act 90-0010)
2 For Chain O'Lakes State Park for replacement
3 of overhead power lines ...................... 21,036
4 For Chain O'Lakes State Park for planning
5 the replacement of concession buildings ...... 37,734
6 (From Article 94, Section 4A of Public Act 90-0010)
7 DELABAR STATE PARK - HENDERSON COUNTY
8 For replacement of waterlines and
9 fountains .................................... 99,925
10 (From Article 94, Section 4A of Public Act 90-0010)
11 FOR EAGLE CREEK STATE PARK - SHELBY COUNTY
12 For rehabilitation of the sewage treatment
13 system, in addition to funds previously
14 appropriated ................................. 312,000
15 (From Article 94, Section 4 of Public Act 90-0010)
16 For Eagle Creek State Park for planning and
17 rehabilitation of the sewage treatment
18 system ....................................... 269,450
19 For Fort Massac State Park for planning the
20 reconstruction of the fort ................... 141,700
21 (From Article 93, Section 7 of Public Act 90-0010)
22 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
23 For stabilizing the feeder canal bank .......... 500,000
24 (From Article 94, Section 4A of Public Act 90-0010)
25 For replacement and rehabilitation
26 of arch culverts and canal ................... 575,148
27 (From Article 94, Section 4 of Public Act 90-0010)
28 For Heron Pond-Little Black Slough for
29 improvements for erosion control ............. 213,537
30 For Horseshoe Lake Conservation Area for
31 dam rehabilitation and land acquisition ...... 858,655
32 For Horseshoe Lake State Fish and Wildlife
33 Area for construction of a pole building
34 and hunter check station ..................... 83,816
-31- BOB-CAPITAL99
1 For Illinois Beach State Park for
2 stabilization of shoreline ................... 177,565
3 For Illinois-Michigan Canal State Park for
4 stabilization of the aqueduct ................ 504,341
5 (From Article 94, Section 4A of Public Act 90-0010)
6 FOR JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
7 For rehabilitation of the concession
8 building, in addition to funds
9 previously appropriated ...................... 140,000
10 (From Article 94, Section 4 of Public Act 90-0010)
11 For Johnson Sauk Trail State Park for
12 rehabilitation of the concession building .... 87,975
13 (From Section 58 of Public Act 90-0550)
14 FOR KANKAKEE STATE PARK - KANKAKEE COUNTY
15 For planning and constructing a
16 sanitary sewer system ........................ 200,000
17 (From Article 94, Section 4A of Public Act 90-0010)
18 FOR KICKAPOO STATE PARK - VERMILION COUNTY
19 For construction of a sewage treatment
20 plant, in addition to funds
21 previously appropriated ...................... 918,194
22 (From Article 94, Section 4 of Public Act 90-0010)
23 For Mason State Forest Tree Nursery for
24 installation of an emergency power system
25 and upgrading the irrigation system .......... 5,155
26 (From Section 58 of Public Act 90-0550)
27 FOR MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
28 For rehabilitating the levee system ............ 225,000
29 (From Article 94, Section 4A of Public Act 90-0010)
30 FOR MORAINE HILLS STATE PARK - MCHENRY COUNTY
31 For renovation of the trail .................... 338,496
32 (From Article 94, Section 4 of Public Act 90-0010)
33 For Moraine Hills State Park for replacement
34 of restrooms and upgrading the
-32- BOB-CAPITAL99
1 water system ................................. 839,952
2 (From Article 94, Section 4A of Public Act 90-0010)
3 FOR MORAINE VIEW STATE PARK - MCLEAN COUNTY
4 For construction of a sewage treatment
5 system and plant ............................. 1,609,600
6 (From Article 94, Section 4 of Public Act 90-0010)
7 For North Point Marina for construction of
8 a breakwater structure ....................... 2,714,211
9 For North Point Marina for modifying
10 the marina's docking system .................. 2,122,839
11 (From Article 94, Section 4A of Public Act 90-0010)
12 FOR PERE MARQUETTE STATE PARK - JERSEY COUNTY
13 For renovation of two buildings and
14 replacement of a storage building ............ 180,000
15 (From Section 58 of Public Act 90-0550)
16 FOR RED HILLS STATE PARK - LAWRENCE COUNTY
17 For replacing the sewage treatment system,
18 in addition to funds previously appropriated . 510,000
19 For rehabilitating the dam ..................... 90,000
20 (From Article 94, Section 4 of Public Act 90-0010)
21 For Sam Dale Lake Conservation Area for
22 construction of a sewage disposal system ..... 29,162
23 (From Section 58 of Public Act 90-0550)
24 FOR SANGANOIS CONSERVATION AREA -
25 CASS, MASON AND SCHUYLER COUNTIES
26 For rehabilitating the levee system ............ 315,000
27 (From Article 94, Section 4 of Public Act 90-0010)
28 For Springfield Illinois State Fairgrounds
29 for the upgrade of access roads,
30 parking lots, and visitor trails at
31 Conservation World and the Conservation
32 Service Center ............................... 55,173
33 (From Article 94, Section 4A of Public Act 90-0010)
34 STARVED ROCK STATE PARK - LASALLE COUNTY
-33- BOB-CAPITAL99
1 For construction of a Visitors'
2 Center, in addition to funds
3 previously appropriated ...................... 365,000
4 For rehabilitation of trails, in addition
5 to funds previously appropriated ............. 1,000,000
6 For reconstruction of the seawall, in
7 addition to funds previously
8 appropriated ................................. 149,726
9 For rehabilitation of the sewer
10 system - Phase I ............................. 171,500
11 (From Article 94, Section 4 of Public Act 90-0010)
12 For Starved Rock State Park for planning the
13 rehabilitation of the trails ................. 71,900
14 For Starved Rock State Park for planning the
15 reconstruction of the seawall ................ 57,340
16 For Stephen A. Forbes State Park for extending
17 water and electrical services ................ 99,656
18 For Tri-County Park for planning
19 a park ....................................... 104,040
20 For Volo Bog Natural Area for rehabilitation
21 of the visitors' center ...................... 13,008
22 For Wayne Fitzgerrell State Park for
23 rehabilitation of the sewage treatment
24 plant ........................................ 214,249
25 For Wayne Fitzgerrell State Park for
26 planning and construction of a marina,
27 installation of additional sewage lines,
28 recreational development and overnight
29 accommodations to be located on Rend
30 Lake ......................................... 14,599
31 NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER
32 (FORMERLY BURNHAM HOSPITAL)
33 (From Article 94, Section 4A of Public Act 90-0010)
34 For renovation of Natural History
-34- BOB-CAPITAL99
1 Research Center (formerly Burnham
2 Hospital) in Champaign ....................... 6,000,000
3 (From Article 94, Section 4 of Public Act 90-0010)
4 For planning and initiating the renovation of the
5 Natural History Research Center (formerly
6 Burnham Hospital) ............................ 3,112,305
7 For acquisition, planning, construction,
8 reconstruction, rehabilitation, and all
9 costs for the conversion of the Natural
10 History Research Center (formerly Burnham
11 Hospital) to a laboratory facility
12 for the Natural History Survey ............... 46,527
13 NATURAL HISTORY SURVEY - CHAMPAIGN
14 For upgrading laboratories and installation
15 of storage units ............................. 725,491
16 STATE WATER SURVEY - CHAMPAIGN
17 (From Article 94, Section 4A of Public Act 90-0010)
18 For renovation of office and
19 laboratory buildings ......................... 751,538
20 For replacement and upgrade of the
21 exterior lighting system ..................... 140,283
22 (From Article 94, Section 4 of Public Act 90-0010)
23 For planning and replacement of vehicle
24 storage/shop facilities ...................... 21,150
25 (From Section 58 of Public Act 90-0550)
26 DICKSON MOUNDS - LEWISTOWN
27 For renovating Canton Liverpool
28 Toll Booth ................................... 73,000
29 (From Article 94, Section 4 of Public Act 90-0010)
30 DICKSON MOUNDS - LEWISTOWN
31 For renovation and expansion of the building,
32 including exhibits ........................... 81,340
33 (From Article 94, Section 4A of Public Act 90-0010)
34 STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
-35- BOB-CAPITAL99
1 For the completion of site improvements ........ 559,000
2 STATE MUSEUM - SPRINGFIELD
3 For planning and replacement of the main
4 museum exhibits, in addition to funds
5 previously appropriated ...................... 700,000
6 (From Article 94, Section 4 of Public Act 90-0010)
7 For planning renovation of main museum
8 exhibits and for renovation of basement
9 galleries .................................... 36,266
10 BENTON - SOUTHERN ILLINOIS MINING OFFICE
11 (FORMERLY MINE RESCUE STATION)
12 For upgrading the roofing and HVAC systems
13 and replacing exterior doors ................. 25,524
14 STATEWIDE
15 (From Section 58 of Public Act 90-0550)
16 For replacing concession buildings and
17 upgrading support facilities at the following
18 locations at the approximate costs set
19 forth below: ................................. 2,895,000
20 Kickapoo State Park ..................538,000
21 Rock Cut State Park ..................525,000
22 Stephen A. Forbes State Park .......1,832,000
23 STATEWIDE
24 For constructing vault toilets at the
25 following locations at the approximate
26 cost set forth below: ........................ 1,593,000
27 Apple River Canyon State Park ........285,000
28 Des Plaines Conservation Area ........240,000
29 Kankakee River State Park ............410,000
30 Lake Le-Aqua-Na State Park ...........295,000
31 Marshall County Conservation Area .....83,000
32 Morrison-Rockwood State Park .........195,000
33 Rice Lake Conservation Area ...........85,000
34 (From Article 93, Section 7 of Public Act 90-0010)
-36- BOB-CAPITAL99
1 STATEWIDE
2 For replacing roofing systems and structural
3 repairs at the following locations at the
4 approximate costs set forth below: ........... 452,000
5 Mine Rescue Station, One building .....36,000
6 Castle Rock State Park,
7 One building .........................37,000
8 Dixon Springs State Park,
9 Three buildings ......................49,000
10 Cave-In-Rock State Park,
11 One building .........................30,000
12 Ferne Clyffe State Park,
13 One building .........................30,000
14 Hamilton County Conservation
15 Area, One building ...................30,000
16 Lake Murphysboro State Park
17 Two buildings ........................54,000
18 Red Hills State Park, Two
19 buildings ............................34,000
20 Fox Ridge State Park, Six
21 buildings ............................73,000
22 Shelbyville Fish and Wildlife
23 Area, Two buildings ..................49,000
24 Newton Lake Fish and Wildlife
25 Area, One building ...................30,000
26 (From Article 94, Section 4 of Public Act 90-0010)
27 For repair or replacement of roofs and
28 parapet walls and reconstruction of
29 chimneys at the following locations
30 at the approximate costs set forth below ..... 599,198
31 Geological Survey - Applied Lab ......234,000
32 Water Survey - Eight Buildings .......125,000
33 Natural History Survey - Natural
34 Resources Studies Annex ..............70,000
-37- BOB-CAPITAL99
1 Geological Survey - Natural
2 Resources Building ...................10,000
3 Water Survey - Parapet walls at
4 Buildings No. 4, 5 and 6 .............10,000
5 Dickson Mounds - Exterior restroom
6 and picnic shelter ...................14,530
7 Jake Wolf Fish Hatchery -
8 one building ........................135,668
9 For land acquisition ........................... 915,505
10 For maintaining the lodge and concession
11 facilities ................................... 130,476
12 For repairing and maintaining facilities ....... 55,065
13 For construction of hazardous material
14 storage buildings ............................ 316,662
15 For abating hazards caused by the presence
16 of asbestos-containing materials ............. 51,622
17 For planning, construction, reconstruction,
18 land acquisition and related costs,
19 utilities, site improvements, and all other
20 expenses necessary for various capital
21 improvements at parks, conservation areas,
22 and other facilities under the jurisdiction
23 of the Department of Natural Resources ....... 14,134,450
24 For rehabilitation of the recreational
25 vehicle campground electrical systems at
26 the following locations at the approximate
27 costs set forth below: ....................... 68,550
28 Kankakee River State Park .............68,550
29 For construction and development of
30 multiple use facilities on lands owned
31 or managed by the Department of
32 Natural Resources, including all costs
33 for supplies, materials, labor, and
34 services required for the completion
-38- BOB-CAPITAL99
1 of the following projects at the
2 approximate costs set forth below: ........... 25,786
3 For Volo Bog Natural Area
4 for replacement of a roof
5 and rehabilitation of the
6 emergency exit stairs at the
7 visitor center ........................5,786
8 For Volo Bog Natural Area for
9 the upgrading of the
10 Interpretive Center, including
11 the heating, ventilation, and
12 air conditioning system ..............20,000 ____________
13 Total, Section 4 $50,446,420
14 Section 4.1. The following named amounts, or so much
15 thereof as may be necessary, from appropriations and
16 reappropriations heretofore made for such purposes in Article
17 93, Section 7A of Public Act 90-0010, and Article 94, Section
18 4.1 of Public Act 90-0010, are reappropriated from the
19 General Revenue Fund to the Capital Development Board for the
20 Department of Natural Resources for the projects hereinafter
21 enumerated:
22 (From Article 93, Section 7A of Public Act 90-0010)
23 ILLINOIS BEACH STATE PARK
24 For stabilizing the shoreline .................. $ 400,000
25 (From Article 94, Section 4.1 of Public Act 90-0010)
26 For stabilization of the shoreline ............. 371,052
27 STATEWIDE
28 (From Article 93, Section 7A of Public Act 90-0010)
29 For maintaining lodge and concession
30 facilities at various DNR locations .......... 400,000
31 For rehabilitating or replacing
32 playground equipment, in addition
33 to funds previously appropriated ............. 300,000
-39- BOB-CAPITAL99
1 (From Article 94, Section 4.1 of Public Act 90-0010)
2 For maintenance of lodge and
3 concession facilities ........................ 133,387
4 For rehabilitation or replacement
5 of playground equipment ...................... 250,000
6 For rehabilitation of trail systems ............ 140,000
7 For maintenance of the lodge and
8 concession facilities ........................ 10,231
9 For rehabilitation and replacement of
10 playground equipment ......................... 323,000
11 For Chain O'Lakes State Park for replacement
12 of windows and floor tile in Region 2
13 headquarters ................................. 87,000
14 For Illinois Beach State Park for
15 stabilization of the shoreline ............... 57,840
16 For Spring Grove Hatchery for upgrading the
17 septic system ................................ 30,000
18 Total, Section 4.1 $2,502,510
19 Section 5. The following named amounts, or so much
20 thereof as may be necessary and remain unexpended at the
21 close of business on June 30, 1998, from appropriations and
22 reappropriations heretofore made for such purposes in Section
23 54 of Public Act 90-0550; Article 93, Section 3 of Public Act
24 90-0010; and Article 94, Sections 5 and 5A of Public Act
25 90-0010, are reappropriated from the Capital Development Fund
26 to the Capital Development Board for the Department of
27 Corrections for the projects hereinafter enumerated:
28 (From Section 54 of Public Act 90-0550)
29 For planning, design, construction,
30 equipment and other necessary costs
31 for a Maximum Security Correctional
32 Center, in addition to funds previously
33 appropriated ................................. $ 95,000,000
-40- BOB-CAPITAL99
1 (From Article 94, Section 5A of Public Act 90-0010)
2 DANVILLE CORRECTIONAL CENTER
3 For renovation of interior and
4 exterior walls, in addition to
5 funds previously appropriated ................ 3,898,027
6 (From Article 94, Section 5 of Public Act 90-0010)
7 For renovation of interior walls and
8 exterior masonry walls ....................... 26,591
9 For correction of construction defects ......... 263,178
10 For planning, utilities, site improvements,
11 and other expenses necessary for the
12 construction of a correctional facility ...... 32,511
13 (From Article 94, Section 5A of Public Act 90-0010)
14 DECATUR WOMEN'S CORRECTIONAL CENTER
15 For the planning and conversion of
16 Meyer Mental Health Center into a
17 correctional facility ........................ 22,448,629
18 DIXON CORRECTIONAL CENTER
19 For renovation of the groundwater
20 storage tank and abatement of crawl-
21 space pipes in Bldgs. 26, 27 and 29 .......... 671,564
22 (From Article 94, Section 5 of Public 90-0010)
23 For upgrading the steam distribution system
24 and replacement of the boiler system
25 including asbestos abatement ................. 87,937
26 DWIGHT CORRECTIONAL CENTER
27 (From Article 93, Section 3 of Public Act 90-0010)
28 For upgrading water and sewer systems .......... 1,000,000
29 For renovating buildings, in addition
30 funds previously appropriated ................ 600,000
31 For constructing a gatehouse and
32 sallyport and upgrading the
33 security system .............................. 2,375,000
34 (From Article 94, Section 5A of Public Act 90-0010)
-41- BOB-CAPITAL99
1 For completion of medical unit,
2 in addition to funds previously
3 appropriated ................................. 2,771,159
4 For expansion of the Education Building
5 and Dietary and construction of
6 a warehouse .................................. 4,514,821
7 (From Article 94, Section 5 of Public Act 90-0010)
8 For renovation of buildings .................... 68,958
9 EAST MOLINE CORRECTIONAL CENTER
10 (From Article 93, Section 3 of Public Act 90-0010)
11 For upgrading the electrical
12 system ....................................... 2,300,000
13 (From Article 94, Section 5A of Public Act 90-0010)
14 For upgrading locking system, in addition
15 to funds previously appropriated ............. 800,000
16 (From Article 94, Section 5 of Public Act 90-0010)
17 For planning the upgrade of locking
18 systems in nine buildings .................... 32,815
19 ILLINOIS YOUTH CENTER - HARRISBURG
20 (From Article 94, Section 5A of Public Act 90-0010)
21 For upgrading the domestic water system ........ 675,000
22 For upgrading the HVAC system .................. 532,000
23 ILLINOIS YOUTH CENTER - JOLIET
24 (From Article 94, Section 5A of Public Act 90-0010)
25 For planning, site improvements,
26 utility upgrade, equipment and all
27 costs necessary to construct a
28 housing unit and dietary facility ............ 6,374,770
29 (From Article 94, Section 5 of Public Act 90-0010)
30 For completing the upgrade of electrical
31 systems, in addition to funds
32 previously appropriated ...................... 327,692
33 For upgrading the fire alarm system ............ 191,768
34 For completing the upgrade of the utilities, in
-42- BOB-CAPITAL99
1 addition to funds previously appropriated .... 40,647
2 ILLINOIS YOUTH CENTER - PERE MARQUETTE
3 (From Article 94, Section 5A of Public Act 90-0010)
4 For upgrading the electrical
5 distribution system .......................... 215,000
6 (From Article 94, Section 5 of Public Act 90-0010)
7 ILLINOIS YOUTH CENTER - ST. CHARLES
8 For completing the upgrade of the water
9 distribution system, in addition to funds
10 previously appropriated ...................... 131,555
11 ILLINOIS YOUTH CENTER - VALLEY VIEW
12 (From Article 94, Section 5A of Public Act 90-0010)
13 For upgrading dormitory restrooms
14 and fixtures, in addition to
15 funds previously appropriated ................ 550,000
16 (From Article 94, Section 5 of Public Act 90-0010)
17 For planning the upgrade of dormitory restrooms
18 and fixtures ................................. 68,560
19 JOLIET CORRECTIONAL CENTER
20 (From Article 93, Section 3 of Public Act 90-0010)
21 For correcting erosion and
22 stabilizing the masonry wall ................. 1,800,000
23 (From Article 94, Section 5A of Public Act 90-0010)
24 For upgrading the power house and
25 installation of a generator .................. 398,400
26 (From Article 94, Section 5 of Public Act 90-0010)
27 For completing the west cellhouse renovation,
28 including asbestos abatement, in addition
29 to funds previously appropriated ............. 1,654,475
30 For renovation of the west cellhouse, in
31 addition to funds previously appropriated .... 19,405
32 For planning the rehabilitation of the
33 West Cellhouse ............................... 4,924
34 LINCOLN CORRECTIONAL CENTER
-43- BOB-CAPITAL99
1 (From Article 94, Section 5A of Public Act 90-0010)
2 For upgrading the water softener system ........ 150,000
3 (From Article 94, Section 5 of Public Act 90-0010)
4 For upgrading the locking systems and doors .... 77,700
5 For upgrading the water supply ................. 356,077
6 For renovation of the Dietary, construction
7 of a cooler addition and installation
8 of blast chillers ............................ 487,520
9 LOGAN CORRECTIONAL CENTER
10 For renovation of sewer system ................. 826,383
11 For renovation of the water tower .............. 124,144
12 For rehabilitation of the roof ventilation
13 systems ...................................... 77,948
14 MENARD CORRECTIONAL CENTER - CHESTER
15 (From Article 93, Section 3 of Public Act 90-0010)
16 For renovating the Old Hospital
17 Building, in addition to funds
18 previously appropriated ...................... 4,700,000
19 For replacing and installing
20 water storage tank ........................... 1,200,000
21 For replacing Boiler #2, in addition
22 to funds previously appropriated ............. 800,000
23 For converting a room into a shower room ....... 395,000
24 (From Article 94, Section 5A of Public Act 90-0010)
25 For upgrading roads and sidewalks .............. 276,632
26 For upgrading the plumbing systems in
27 two buildings ................................ 292,524
28 For upgrading the coal handling system
29 and repair or replace boiler system .......... 646,253
30 For conversion of the Maintenance Building
31 to an inmate dormitory ....................... 250,000
32 For conversion of the Administration
33 Building basement to a courtroom and
34 attorney offices ............................. 100,000
-44- BOB-CAPITAL99
1 For upgrading the steam and water distribution
2 systems, in addition to funds previously
3 appropriated ................................. 2,341,716
4 (From Article 94, Section 5 of Public Act 90-0010)
5 For replacement of East and West
6 Cellhouse windows and boilers ................ 91,662
7 For improving the south yard for outdoor
8 recreation ................................... 32,606
9 For repairs due to the Great Flood of
10 1993 and projects to protect the facility
11 from future floods ........................... 62,559
12 For upgrading the steam and water distribution
13 systems and replacement of the MSU
14 "C" Building ................................. 146,107
15 For replacement of the chimney stack and
16 boilers, in addition to funds previously
17 appropriated ................................. 107,664
18 For replacement of hot water heaters and
19 deairing tanks ............................... 110,000
20 For planning the renovation of the old
21 hospital building ............................ 207,540
22 For renovation of elements of the power
23 plants, including the main generator ......... 22,982
24 For planning for renovation of the
25 Administration Building ...................... 15,604
26 PONTIAC CORRECTIONAL CENTER
27 (From Article 94, Section 5A of Public Act 90-0010)
28 For renovation of main sally port .............. 300,000
29 (From Article 94, Section 5 of Public Act 90-0010)
30 SHAWNEE CORRECTIONAL CENTER
31 For upgrading the heating and hot
32 water system ................................. 498,563
33 STATEVILLE CORRECTIONAL CENTER - JOLIET
34 (From Article 94, Section 5A of Public Act 90-0010)
-45- BOB-CAPITAL99
1 For replacement of the MSU ..................... 6,500,000
2 (From Article 94, Section 5 of Public Act 90-0010)
3 For upgrading the doors, locks and hardware
4 in B Cellhouse ............................... 58,700
5 For upgrading the water supply to B house ..... 187,633
6 SOUTHWESTERN ILLINOIS CORRECTIONAL FACILITY
7 For providing equipment and telecomm,
8 constructing a warehouse and upgrading
9 a parking lot, in addition to funds
10 previously appropriated ...................... 27,876
11 For completing the conversion of existing
12 buildings into a minimum security
13 correctional facility, in addition to
14 funds previously appropriated ................ 15,001
15 VANDALIA CORRECTIONAL CENTER
16 (From Article 94, Section 5A of Public Act 90-0010)
17 For renovation of dormitory shower rooms ....... 450,000
18 VIENNA CORRECTIONAL CENTER
19 (From Article 93, Section 3 of Public Act 90-0010)
20 For renovating the kitchen ..................... 2,000,000
21 (From Article 94, Section 5A of Public Act 90-0010)
22 For upgrading the steam distribution system
23 and renovation of Powerhouse, in addition
24 to funds previously appropriated ............. 3,979,634
25 For installation of security fencing ........... 959,796
26 For upgrading air conditioning system
27 and replacement of cooling tower ............. 1,100,000
28 For upgrading the electrical, plumbing and
29 HVAC systems in four buildings ............... 850,000
30 (From Article 94, Section 5 of Public Act 90-0010)
31 For completing the rehabilitation of duct
32 systems and walls, in addition to funds
33 previously appropriated ...................... 806,456
34 For planning the upgrade of the steam
-46- BOB-CAPITAL99
1 distribution system .......................... 190,881
2 For planning the replacement of the
3 absorption chiller and cooling tower ......... 40,848
4 For upgrading the water and sewer
5 utilities .................................... 141,688
6 STATEWIDE
7 (From Article 93, Section 3 of Public Act 90-0010)
8 For replacing roofing systems at the
9 following locations at the approximate
10 costs set forth below: ....................... 2,100,000
11 Big Muddy Correctional Center, Ina
12 Two buildings ...................... 425,000
13 East Moline Correctional Center,
14 Three buildings .................... 500,000
15 Graham Correctional Center, Hillsboro
16 Seven buildings .................... 600,000
17 Sheridan Correctional Center, LaSalle
18 Three buildings .................... 410,000
19 Stateville Correctional Center, Joliet
20 One building ....................... 165,000
21 For replacing doors and locks at the
22 following locations at the approximate
23 costs set forth below: ....................... 2,575,000
24 IYC - St. Charles ................... 585,000
25 Lincoln Correctional Center .......... 50,000
26 Jacksonville Correctional Center .... 975,000
27 Sheridan Correctional Center ........ 965,000
28 For upgrading fire safety systems at the
29 following locations at the approximate
30 costs set forth below, in addition to
31 funds previously appropriated: ............... 6,500,000
32 Menard Correctional Center ........ 2,000,000
33 Pontiac Correctional Center ....... 3,000,000
34 Stateville Correctional Center .... 1,500,000
-47- BOB-CAPITAL99
1 For upgrading water and wastewater
2 systems at the following locations
3 at the approximate costs set forth below: .... 4,465,000
4 Big Muddy Correctional Center
5 for installing mechanical
6 bar screen ......................... 300,000
7 Centralia Correctional Center
8 for upgrading water
9 treatment plant .................. 1,500,000
10 East Moline Correctional Center
11 for upgrading sewer system ......... 655,000
12 Ed Jenison Work Camp (Paris)
13 for installing mechanical
14 bar screen ......................... 120,000
15 IYC - Harrisburg for upgrading
16 water distribution system .......... 500,000
17 Kankakee MSU for constructing
18 well #2 ............................ 300,000
19 IYC - St. Charles for upgrading
20 sewage/storm system ................ 850,000
21 IYC - Valley View for installing
22 mechanical bar screen .............. 240,000
23 (From Article 94, Section 5A of Public Act 90-0010)
24 For correction of deficiencies in
25 water systems at three correctional
26 facilities ................................... 100,000
27 For replacement of locks, windows and
28 doors at the following locations
29 as set forth below: .......................... 3,951,402
30 Dwight .............................. 291,400
31 IYC Harrisburg ...................... 291,400
32 IYC Joliet .......................... 367,500
33 Menard ............................ 1,350,000
34 Pontiac ............................. 680,102
-48- BOB-CAPITAL99
1 IYC Valley View ..................... 500,000
2 Vienna .............................. 471,000
3 For planning, design, construction,
4 equipment and other necessary costs
5 for a Correctional Facility for
6 juveniles .................................... 42,750,000
7 For planning, design, construction,
8 equipment and other necessary costs
9 for a Medium Security Correctional
10 Facility ..................................... 68,574,985
11 (From Article 94, Section 5 of Public Act 90-0010)
12 For planning, design, construction,
13 equipment and all other necessary
14 costs for a youth boot camp at a
15 site to be chosen from the list of
16 finalists not selected for the
17 super maximum security prison ............... 27,649
18 For completion of planning, site improvements,
19 utility upgrade, equipment and construction
20 of three housing units to add 672 cells
21 to the adult correctional system ............. 22,310
22 For planning, construction, utilities, site
23 improvements, equipment and other expenses
24 necessary for the construction of a close
25 supervision super maximum security prison .... 3,246,135
26 For upgrading for fire safety at five
27 locations and replacing boilers............... 418,088
28 For correcting defects in the food preparation
29 areas, including roofs ....................... 128,591
30 For planning, construction, utilities,
31 site improvements, and other expenses
32 necessary for the construction of two
33 minimum and one medium security
34 prisons ...................................... 29,224
-49- BOB-CAPITAL99
1 For renovation and improvements at various
2 correctional facilities at the approximate
3 costs set forth below: ....................... 117,693
4 Roof Replacement ......................70,000
5 Road Repavement .......................47,693
6 For replacement of cell doors and locks
7 and rehabilitation of locking systems at
8 the following locations at the approximate
9 costs set forth below: ....................... 118,902
10 Kankakee MSU
11 For rehabilitation of locking
12 systems .............................118,902
13 For renovation of roads and parking lots
14 and replacement of boilers at the
15 following locations at the approximate
16 costs set forth below ........................ 107,551
17 Dixon Correctional Center
18 For roads and parking .................6,000
19 Logan Correctional Center
20 For roads and parking .................5,656
21 Menard Correctional Center
22 For roads and parking and
23 replacement of boilers...............87,695
24 Vienna Correctional Center
25 For roads .............................8,200
26 For replacement of roofs at various Department of
27 Corrections locations ........................ 269,592
28 For roof replacement at the following
29 locations at the approximate costs
30 set forth below: ............................. 578,422
31 Dixon Correctional Center
32 Five Buildings .......................25,000
33 Dwight Correctional Center
34 Three buildings ......................10,425
-50- BOB-CAPITAL99
1 Graham Correctional Center
2 Five buildings ........................6,268
3 Graham Correctional Center
4 Thirty-two buildings .................14,512
5 Hanna City Work Camp
6 Thirteen buildings ...................2,500
7 Joliet Correctional Center
8 Five buildings .......................14,512
9 Logan Correctional Center
10 Two buildings .........................9,920
11 Menard Psychiatric Center
12 Six buildings ........................33,624
13 Menard Correctional Center
14 Warehouse Building ...................55,093
15 Menard Correctional Center
16 Five buildings ......................269,508
17 Pontiac Correctional Center
18 Nine buildings .......................23,222
19 Pontiac Correctional Center
20 Eight buildings ......................10,686
21 Illinois Youth Center-St. Charles
22 Three buildings .......................3,580
23 Sheridan Correctional Center
24 Six buildings ........................15,482
25 Stateville Correctional Center
26 Seven buildings ......................38,000
27 Ill Youth Center-Valley View
28 Administration Building and
29 Kitchen Addition ....................23,954
30 Illinois Youth Center-Warrenville
31 One residential building .............22,136 ____________
32 Total, Section 5 $317,961,627
33 Section 5.1. The following named amounts, or so much
-51- BOB-CAPITAL99
1 thereof as may be necessary and remain unexpended at the
2 close of business on June 30, 1998, from appropriations and
3 reappropriations heretofore made for such purposes in Article
4 93, Section 3A of Public Act 90-0010, and Article 94, Section
5 5.1 of Public Act 90-0010, are reappropriated from the
6 General Revenue Fund to the Capital Development Board for the
7 Department of Corrections for the projects hereinafter
8 enumerated:
9 DIXON CORRECTIONAL CENTER
10 (From Article 94, Section 5.1 of Public Act 90-0010)
11 For replacement of two freezer compressors
12 and motors ................................... $ 24,579
13 EAST MOLINE CORRECTIONAL CENTER
14 For retubing boiler #3 ......................... 132,683
15 MENARD CORRECTIONAL CENTER - CHESTER
16 (From Article 93, Section 3A of Public Act 90-0010)
17 For stabilizing dams ........................... 100,000
18 For repairing masonry and
19 waterproofing exterior ....................... 245,000
20 STATEVILLE CORRECTIONAL CENTER - JOLIET
21 For tuckpointing buildings ..................... 200,000
22 VANDALIA CORRECTIONAL CENTER
23 (From Article 93, Section 3A of Public Act 90-0010)
24 For tuckpointing, waterproofing and
25 replacing facade ............................. 165,000
26 STATEWIDE
27 (From Article 94, Section 5.1 of Public Act 90-0010)
28 For energy conservation improvements at the
29 following locations at the approximate
30 costs set forth below: ....................... 56,018
31 Dwight Correctional Center ............ 7,000
32 Joliet Correctional Center
33 School Building ...................... 4,500
34 Menard Psychiatric Center
-52- BOB-CAPITAL99
1 Randolph Hall ........................ 7,500
2 Stateville Correctional Center
3 Law Library .......................... 7,400
4 Pontiac Correctional Center .......... 27,893
5 Vienna Correctional Center ............ 1,725
6 For upgrading doors and locking systems at
7 the following locations at the approximate
8 costs set forth below: ....................... 577,182
9 Illinois Youth Center-Warrenville
10 For replacement of doors
11 and locking systems ............... 577,182 ____________
12 Total, Section 5.1 $1,500,462
13 Section 5.2. The sum of $2,666,667, or so much thereof
14 as may be necessary and remains unexpended at the close of
15 business on June 30, 1998, from a reappropriation heretofore
16 made for such purposes in Article 94, Section 5.2 of Public
17 Act 90-0010, is reappropriated from the Capital Development
18 Fund to the Capital Development Board for the State's
19 one-third share of land acquisition, equipment and
20 construction of a boot camp in the Cook County area.
21 Section 5.3. The amount of $21,874, or so much thereof
22 as may be necessary and remains unexpended at the close of
23 business on June 30, 1998, from a reappropriation heretofore
24 made for such purposes in Article 94, Section 5.3 of Public
25 Act 90-0010, is reappropriated from the Capital Development
26 Fund to the Capital Development Board for the Department of
27 Corrections for planning and other expenses necessary for a
28 medical unit facility at Dwight Correctional Center.
29 Section 5.4. The amount of $2,876,193, or so much
30 thereof as may be necessary and remains unexpended from the
31 General Revenue Fund at the close of business on June 30,
-53- BOB-CAPITAL99
1 1998, from a reappropriation heretofore made for such
2 purposes in Article 94, Section 5.4 of Public Act 90-0010, is
3 reappropriated to the Capital Development Board for the
4 Department of Corrections for all costs associated with the
5 completion of the super maximum security prison at Tamms,
6 Illinois.
7 Section 5.5. The amount of $6,108,093, or so much
8 thereof as may be necessary and remains unexpended at the
9 close of business on June 30, 1998, from a reappropriation
10 heretofore made for such purposes in Article 94, Section 5.5
11 of Public Act 90-0010, is reappropriated from the General
12 Revenue Fund to the Capital Development Board for the
13 Department of Corrections for the projects hereinafter
14 enumerated at the approximate costs set forth below:
15 Danville Correctional Center -
16 For upgrading the hot water
17 distribution system ..................$514,393
18 Joliet Correctional Center -
19 For replacement of the deep well ........270,046
20 Stateville Correctional Center-
21 For upgrading the plumbing systems in
22 four buildings ......................3,790,252
23 Menard Correctional Center -
24 For planning and to begin upgrading
25 the plumbing systems in two
26 buildings .............................144,440
27 Pontiac Correctional Center -
28 For upgrading the mechanical systems
29 and renovation of shower rooms ........339,166
30 Shawnee Correctional Center -
31 For upgrading the hot water
32 distribution system .................1,049,796
-54- BOB-CAPITAL99
1 Section 5.6. The following named amounts, or so much
2 thereof as may be necessary and remain unexpended at the
3 close of business on June 30, 1998, from appropriations
4 heretofore made for such purposes in Article 94, Section 5.6
5 of Public Act 90-0010, are reappropriated from the General
6 Revenue Fund to the Capital Development Board for the
7 Department of Corrections for the projects hereinafter
8 enumerated:
9 DIXON CORRECTIONAL CENTER
10 For tuckpointing two buildings ................. $ 65,000
11 STATEVILLE CORRECTIONAL CENTER - JOLIET
12 For tuckpointing seven buildings ............... 268,592
13 Total $333,592
14 Section 6. The following named amounts, or so much
15 thereof as may be necessary and remains unexpended at the
16 close of business on June 30, 1998, from appropriations and
17 reappropriations heretofore made for such purposes in Section
18 55 of Public Act 90-0550; Article 93, Section 4 of Public Act
19 90-0010; and Article 94, Sections 6 and 6A of Public Act
20 90-0010 are reappropriated from the Capital Development Fund
21 to the Capital Development Board for the Historic
22 Preservation Agency for the projects hereinafter enumerated:
23 (From Article 94, Section 6A of Public Act 90-0010)
24 CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
25 For renovation of the Cahokia Courthouse
26 and the Jarrot House ......................... $ 387,000
27 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
28 For replacement of Monk's Mounds stairs ........ 465,000
29 For restoration of Monk's Mound ................ 1,380,220
30 (From Article 94, Section 6 of Public Act 90-0010)
31 To extend a water line for providing
32 reliable water service ....................... 145,288
33 For purchasing private land within historic
-55- BOB-CAPITAL99
1 site boundary ................................ 210,245
2 For replacement of Monk's Mounds stairs ........ 207,252
3 DAVID DAVIS MANSION - BLOOMINGTON
4 (From Article 94, Section 6A of Public Act 90-0010)
5 For renovation of the David Davis Mansion
6 to eliminate basement leakage ................ 231,000
7 DAVID DAVIS HOME
8 (From Article 94, Section 6 of Public Act 90-0010)
9 To acquire a residence to be
10 converted to a Visitors Center ............... 250,000
11 (From Section 55 of Public Act 90-0550)
12 FORT DE CHARTRES - RANDOLPH COUNTY
13 For replacing Maintenance Building ............. 264,000
14 FT. KASKASKIA HISTORIC SITE
15 (From Article 94, Section 6 of Public Act 90-0010)
16 For providing a new water supply ............... 138,463
17 LEWIS AND CLARK STATE HISTORIC SITE
18 For the construction of an interpretive
19 center ....................................... 440,000
20 LINCOLN LOG CABIN HISTORIC SITE - CAMPBELL
21 (From Article 94, Section 6A of Public Act 90-0010)
22 For construction of a visitors center .......... 1,373,611
23 For replacement of bridges ..................... 180,000
24 (From Article 94, Section 6 of Public Act 90-0010)
25 For rehabilitation of historic structures ...... 16,424
26 For construction of a visitor center and
27 museum, Phase I .............................. 90,783
28 LINCOLN NEW SALEM HISTORIC SITE - PETERSBURG
29 (From Article 94, Section 6A of Public Act 90-0010)
30 For renovation of the River Ridge
31 Restaurant and improvements to the
32 domestic water system ........................ 248,726
33 (From Article 94, Section 6 of Public Act 90-0010)
34 For rehabilitation of the sewage treatment
-56- BOB-CAPITAL99
1 plant ........................................ 92,450
2 PULLMAN FACTORY HISTORIC SITE - CHICAGO
3 For stabilization of the structure and for planning
4 and beginning restoration .................... 793,764
5 OLD STATE CAPITOL - SPRINGFIELD
6 (From Article 93, Section 4 of Public Act 90-0010)
7 For renovating garage ramp ..................... 419,000
8 (From Article 94, Section 6A of Public Act 90-0010)
9 For renovation of the Old State
10 Capitol to eliminate basement
11 leakage ...................................... 598,626
12 (From Article 94, Section 6 of Public Act 90-0010)
13 VACHEL LINDSAY HOME
14 For mechanical/system replacement,
15 restoration of the foundation and other
16 structural improvements ...................... 22,340
17 VANDALIA STATE HOUSE
18 (From Section 55 of Public Act 90-0550)
19 For rehabilitating HVAC and electrical
20 systems and interior ......................... 378,000
21 STATEWIDE
22 (From Article 93, Section 4 of Public Act 90-0010)
23 For replacing roofing systems at the
24 following locations at the approximate
25 costs set forth below: ....................... 462,000
26 Fort De Chartres, Randolph County .... 93,000
27 Washburne House, Galena .............. 50,000
28 David Davis Mansion, Bloomington ..... 25,000
29 Bishop Hill House, Henry County ..... 294,000
30 (From Article 94, Section 6A of Public Act 90-0010)
31 For matching ISTEA federal grant funds ......... 500,000
32 (From Article 94, Section 6 of Public Act 90-0010)
33 For land acquisition and related costs ......... 19,411
34 Total, Section 6 $9,313,603
-57- BOB-CAPITAL99
1 Section 6.1. The amount of $54,510, or so much thereof
2 as may be necessary and remains unexpended at the close of
3 business on June 30, 1998, from a reappropriation heretofore
4 made for such purpose in Article 94, Section 6.1 of Public
5 Act 90-0010, is reappropriated from the Capital Development
6 Fund to the Capital Development Board for the Historic
7 Preservation Agency for the purchase and rehabilitation of
8 the State Journal Register Building in Springfield.
9 Section 6.2. The amount of $52,326, or so much thereof
10 as may be necessary and remains unexpended at the close of
11 business on June 30, 1998, from a reappropriation heretofore
12 made for such purpose in Article 94, Section 6.2 of Public
13 Act 90-0010, is reappropriated from the Capital Development
14 Fund to the Capital Development Board for the Historic
15 Preservation Agency for acquiring the Zimmerman
16 archaeological site in LaSalle County and for associated
17 costs, planning, stabilization, restoration and all other
18 expenses necessary to comply with the intent of this
19 appropriation.
20 Section 6.3. The amount of $2,300,000, or so much
21 thereof as may be necessary and remains unexpended at the
22 close of business on June 30, 1998, from a reappropriation
23 heretofore made for such purposes in Article 94, Section 6.3
24 of Public Act 90-0010, is reappropriated from the Capital
25 Development Fund to the Capital Development Board for
26 planning a new historical library and Lincoln Center.
27 Section 6.4. The amount of $400,000, or so much thereof
28 as may be necessary and remains unexpended from the General
29 Revenue Fund, from the reappropriations heretofore made for
30 such purposes in Article 94, Section 6.4 of Public Act
31 90-0010, is reappropriated to the Historic Preservation
-58- BOB-CAPITAL99
1 Agency (formerly to Capital Development Board for Historic
2 Preservation Agency) for planning a new historical library
3 and Lincoln Center.
4 Section 6.5. The following named amounts, or so much
5 thereof as may be necessary and remain unexpended at the
6 close of business on June 30, 1998, from appropriations
7 heretofore made for such purposes in Article 93, Section 4A
8 of Public Act 90-0010, are reappropriated from the General
9 Revenue Fund to the Capital Development Board for the
10 Historic Preservation Agency for the projects hereinafter
11 enumerated:
12 JOURNAL REGISTER BUILDING - SPRINGFIELD
13 For renovating building ........................ $ 702,000
14 DANA THOMAS HOUSE - SPRINGFIELD
15 For restoring the exterior and interior ........ 417,000
16 Total, Section 6.5 $1,119,000
17 Section 7. The sum of $103,997, or so much thereof as
18 may be necessary and remains unexpended at the close of
19 business on June 30, 1998, from a reappropriation heretofore
20 made for such purposes in Article 94, Section 8 of Public Act
21 90-0010, is reappropriated from the Capital Development Fund
22 to the Capital Development Board for the Legislative Space
23 Needs Commission for architectural/engineering fees,
24 planning, construction, reconstruction, rehabilitation, and
25 all other necessary costs for remodeling and relocation of
26 various legislative services agencies located in the Capitol
27 and Stratton Office buildings at the approximate costs set
28 forth below:
29 For the Joint Committee on
30 Administrative Rules .......................$ 103,997
31 Section 8. The following named amounts, or so much
-59- BOB-CAPITAL99
1 thereof as may be necessary and remain unexpended at the
2 close of business on June 30, 1997, from appropriations and
3 reappropriations heretofore made for such purposes in Section
4 56 of Public Act 90-0550; Article 93, Section 5 of Public Act
5 90-0010; and Article 94, Sections 9 and 9A of Public Act
6 90-0010, are reappropriated from the Capital Development Fund
7 to the Capital Development Board for the Department of Human
8 Services (formerly the Department of Mental Health and
9 Developmental Disabilities) for the projects hereinafter
10 enumerated:
11 ALTON MENTAL HEALTH CENTER - MADISON COUNTY
12 (From Section 56 of Public Act 90-0550)
13 For constructing two building additions
14 at the Forensic Complex ...................... 11,924,000
15 (From Article 94, Section 9A of Public Act 90-0010)
16 For rehabilitation of the central dietary ...... 1,950,000
17 For replacement of life/safety and
18 security system in a residential
19 building ..................................... 234,550
20 (From Article 94, Section 9 of Public Act 90-0010)
21 For replacement of domestic hot water
22 lines in seven buildings ..................... 4,859
23 For upgrading fire safety systems in
24 eight buildings ............................ 5,708
25 For replacement of the chiller and
26 connection of the HVAC to the energy
27 management system ............................ 14,911
28 For replacement of two cooling towers in
29 the Willow Building .......................... 35,169
30 CHESTER MENTAL HEALTH CENTER - CHESTER
31 (From Article 93, Section 5 of Public Act 90-0010)
32 For replacing fencing and upgrading
33 recreational yard ............................ 1,400,000
34 For renovating support and residential
-60- BOB-CAPITAL99
1 area ......................................... 3,910,000
2 (From Article 94, Section 9A of Public Act 90-0010)
3 For installation of emergency generator
4 and upgrading EMS system ..................... 350,000
5 (From Article 94, Section 9 of Public Act 90-0010)
6 For construction of a storage building ........ 76,610
7 For construction of a Rehabilitative
8 Services building ............................ 54,775
9 For replacement of the emergency generator ..... 61,354
10 CHICAGO METRO C&A
11 For planning and renovation of residential
12 and program units for children and
13 adolescent services .......................... 794,770
14 CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
15 (From Article 94, Section 9A of Public Act 90-0010)
16 For renovating residential units, in
17 addition to funds previously
18 appropriated ................................. 2,171,000
19 (From Article 94, Section 9 of Public Act 90-0010)
20 For renovation of utility rooms and installation
21 of drinking fountains ........................ 218,000
22 For renovation of the West Campus Nurses'
23 Stations ..................................... 619,788
24 For renovation of Henry Horner Children's
25 Center and West Campus for fire and
26 life safety codes ............................ 1,365,057
27 For renovation of the West Campus shower
28 and toilet rooms ............................. 385,908
29 For rehabilitation of the bathroom shower
30 walls in ten buildings ....................... 58,147
31 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
32 (From Article 93, Section 5 of Public Act 90-0010)
33 For completing HVAC system upgrade,
34 in addition to funds previously
-61- BOB-CAPITAL99
1 appropriated ................................. 1,433,000
2 (From Article 94, Section 9A of Public Act 90-0010)
3 For upgrading the mechanical equipment,
4 in addition to funds previously
5 appropriated ................................. 837,000
6 For renovating a residential building,
7 in addition to funds previously
8 appropriated ................................. 2,334,000
9 (From Article 94, Section 9 of Public Act 90-0010)
10 For upgrading the mechanical equipment,
11 in addition to funds previously
12 appropriated ................................. 367,430
13 For planning and beginning the renovation of a
14 residential building ......................... 70,714
15 For renovation of the kitchen and residential
16 units for rethermalization and air
17 condition the kitchen, in addition to
18 funds previously appropriated ............... 17,051
19 For separating and upgrading of the combined
20 sewer system, in addition to funds
21 previously appropriated ...................... 154,660
22 For rehabilitation of resident buildings
23 and upgrading of temperature controls ........ 81,260
24 ELGIN MENTAL HEALTH CENTER - KANE COUNTY
25 (From Article 93, Section 5 of Public Act 90-0010):
26 For renovating the central dietary
27 and kitchen .................................. 3,994,000
28 (From Article 94, Section 9A of Public Act 90-0010)
29 For construction of an Adult Psychiatric
30 Building, in addition to funds previously
31 appropriated ................................. 3,681,000
32 For construction of roads, parking lots
33 and street lights ............................ 2,500,000
34 For upgrading and expanding the mechanical
-62- BOB-CAPITAL99
1 infrastructure, in addition to funds
2 previously appropriated ...................... 4,005,100
3 For construction of a forensic services complex
4 at Elgin Mental Health Center, in addition
5 to funds previously appropriated ............. 4,815,500
6 (From Article 94, Section 9 of Public Act 90-0010)
7 For construction of a forensic services
8 complex, in addition to funds previously
9 appropriated ................................. 1,784,500
10 For upgrading and expanding the mechanical
11 infrastructure, in addition to funds
12 previously appropriated ...................... 105,305
13 For renovation of the HVAC systems,
14 replacement of windows and installation
15 of security screens, in addition
16 to funds previously appropriated ............. 2,092,543
17 For construction of a Forensic Services
18 Facility, in addition to funds
19 previously appropriated ..................... 2,787,866
20 For upgrading and expanding mechanical
21 infrastructure, in addition to funds
22 previously appropriated ...................... 142,140
23 For upgrading for fire and life safety ......... 880,849
24 For planning the renovation of the Forensic
25 Building and abating asbestos ................ 251,946
26 For renovation of the Central Stores
27 Building ..................................... 85,679
28 For upgrading the security systems and
29 constructing a multi-purpose building
30 for the Forensic Complex ..................... 64,550
31 For the demolition of the Old Main Building
32 and construction of an Adult
33 Psychiatric Center ........................... 836,748
34 FOX DEVELOPMENTAL CENTER
-63- BOB-CAPITAL99
1 (From Article 94, Section 9A of Public Act 90-0010)
2 For replacement of absorbers and
3 upgrading HVAC system ........................ 738,000
4 For renovation of dietary ...................... 826,400
5 (From Article 94, Section 9 of Public Act 90-0010)
6 For renovation of Building #8 and
7 window replacement of Building
8 #1, in addition to funds
9 previously appropriated ...................... 323,575
10 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
11 (From Article 94, Section 9A of Public Act 90-0010)
12 For renovation of residential buildings ........ 2,557,600
13 (From Article 94, Section 9 of Public Act 90-0010)
14 For replacement of steam and
15 condensate lines ............................. 113,418
16 For renovation of the boilers in the power
17 plant ........................................ 29,856
18 JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
19 (From Article 93, Section 5 of Public Act 90-0010)
20 For extending chilled water line ............... 327,000
21 (From Article 94, Section 9A of Public Act 90-0010)
22 For rehabilitation of bathrooms and
23 replacing doors .............................. 1,286,023
24 For rehabilitation of the electrical
25 distributions system, in addition to
26 Funds previously appropriated ................ 1,257,000
27 (From Article 94, Section 9 of Public Act 90-0010)
28 For replacement of code compliance
29 generators ................................... 8,833
30 For planning and beginning electrical
31 distribution renovation ...................... 21,950
32 For replacement of piping and heating units .... 56,809
33 For rehabilitation of bathrooms and replacement
34 of doors ..................................... 75,048
-64- BOB-CAPITAL99
1 For installation of fire safety systems in
2 four buildings and replacement of a
3 code compliance generator .................... 235,941
4 KILEY DEVELOPMENTAL CENTER - WAUKEGAN
5 (From Article 93, Section 5 of Public Act 90-0010)
6 For renovating homes ........................... 741,000
7 (From Article 94, Section 9 of Public Act 90-0010)
8 For renovation of homes ........................ 79,434
9 LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY
10 (From Article 94, Section 9A of Public Act 90-0010)
11 For installation of a rethermalization food
12 service system, in addition to funds
13 previously appropriated ...................... 732,000
14 (From Article 94, Section 9 of Public Act 90-0010)
15 For upgrading the architectural and mechanical
16 systems, in addition to funds
17 previously appropriated ...................... 1,339,313
18 For installation of a code compliance
19 generator .................................... 99,238
20 For rehabilitation of the coal bunker
21 in the Powerhouse ............................ 33,640
22 For installation of rethermalization food
23 service system ............................... 83,274
24 For expansion of the sprinkler system in
25 four buildings ............................... 185,080
26 For renovation of the boilers, replacement of
27 controls and tuckpointing the exterior ....... 106,984
28 For installation of air conditioning in
29 Coty and Dietary Buildings ................... 44,883
30 For upgrading the HVAC systems, including
31 chillers ..................................... 25,157
32 LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
33 (From Article 94, Section 9A of Public Act 90-0010)
34 For renovation of residential buildings,
-65- BOB-CAPITAL99
1 in addition to funds previously
2 appropriated ................................. 1,888,500
3 For rehabilitation of the roads and parking
4 areas and constructing walks ................. 800,000
5 (From Article 94, Section 9 of Public Act 90-0010)
6 For renovation of residences ................... 460,189
7 For renovation of residences ................... 156,005
8 For renovation of restrooms for accessibility
9 in two buildings ............................. 19,460
10 For renovation of bathrooms in 15 residences ... 94,368
11 MADDEN MENTAL HEALTH CENTER - HINES
12 (From Article 93, Section 5 of Public Act 90-0010)
13 For renovating dietary ......................... 930,000
14 (From Article 94, Section 9A of Public Act 90-0010)
15 For renovation of pavilions, in addition
16 to funds previously appropriated ............. 844,000
17 (From Article 94, Section 9 of Public Act 90-0010)
18 For renovation of pavilions .................... 347,956
19 For upgrading residences for safety and
20 security ..................................... 279,521
21 For replacement of a cooling tower and
22 chiller ...................................... 225,987
23 For replacement of hot water heaters ........... 86,160
24 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
25 (From Article 94, Section 9A of Public Act 90-0010)
26 For replacement of the HVAC management
27 control panel, in addition to funds
28 previously appropriated ...................... 150,000
29 For rehabilitation of the dietary facility ..... 398,120
30 (From Article 94, Section 9 of Public Act 90-0010)
31 For renovation of a residential building ....... 49,591
32 For replacement of the HVAC control panel ...... 86,105
33 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
34 (From Article 93, Section 5 of Public Act 90-0010)
-66- BOB-CAPITAL99
1 For rehabilitating the emergency
2 electrical system ............................ 314,000
3 For renovating Elm Cottage ..................... 3,082,000
4 (From Article 94, Section 9A of Public Act 90-0010)
5 For replacement of the boiler
6 shells and controls, in addition
7 to funds previously appropriated ............. 85,067
8 For rehabilitation of the hot water
9 distribution system, in addition to
10 funds previously appropriated ................ 189,713
11 For replacement of cooling towers and
12 support beams, in addition to funds
13 previously appropriated ..................