Illinois General Assembly

  Bills & Resolutions  
  Compiled Statutes  
  Public Acts  
  Legislative Reports  
  IL Constitution  
  Legislative Guide  
  Legislative Glossary  

 Search By Number
 (example: HB0001)
Search Tips

Search By Keyword

Illinois Compiled Statutes

Information maintained by the Legislative Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.

Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.


()

415 ILCS 5/38

    (415 ILCS 5/38) (from Ch. 111 1/2, par. 1038)
    Sec. 38. (a) Except as otherwise provided in subsection (c), if the Board fails to take final action upon a variance request within 120 days after the filing of the petition or the receipt of a request for hearing pursuant to subsection (a) of Section 37, whichever is later, the petitioner may deem the request granted under this Act, for a period not to exceed one year. However, the period of 120 days shall not run for any such period of time, not to exceed 30 days, during which the Board is without sufficient membership to constitute the quorum required by subsection (a) of Section 5 of this Act, provided that such 120 day period shall not be stayed for lack of quorum beyond 30 days regardless of whether the lack of quorum exists at the beginning of such 120 day period or occurs during the running of such 120 day period.
    (b) If any person files a petition for a variance from a rule or regulation within 20 days after the effective date of such rule or regulation, the operation of such rule or regulation shall be stayed as to such person pending the disposition of the petition; provided, however, that the operation of any rule or regulation adopted by the Board which implements, in whole or in part, a State RCRA, UIC, or NPDES program shall not be stayed.
    The Board may hold a hearing upon said petition 5 days from the date of notice of such hearing or thereafter. All the provisions of this Title shall apply to petitions for extension of existing variances and to proposed Contaminant Reduction programs designed to secure delayed compliance with the Act or with Board regulations.
    (c) Subsection (a) shall not apply to a request for a variance from any provision of this Act or any rule or regulation adopted by the Board which implements, in whole or in part, a State RCRA, UIC, or NPDES program. If the Board fails to take final action on any request for a variance from any such rule or regulation within 120 days of the filing of the petition, the Petitioner shall be entitled to an Appellate Court order pursuant to Section 41(d) of this Act.
(Source: P.A. 87-914.)

415 ILCS 5/38.5

    (415 ILCS 5/38.5)
    Sec. 38.5. Time-limited water quality standards.
    (a) To the extent consistent with the Federal Water Pollution Control Act, rules adopted by the United States Environmental Protection Agency under that Act, this Section, and rules adopted by the Board under this Section, the Board may adopt, and may conduct non-adjudicatory proceedings to adopt, a time-limited water quality standard for a watershed or one or more of the following:
        (1) water bodies;
        (2) waterbody segments; or
        (3) dischargers.
    (b) A time-limited water quality standard may be sought by:
        (1) persons who file with the Board a petition for a
    
time-limited water quality standard under this Section; and
        (2) persons who have a petition for a variance from a
    
water quality standard under Section 35 of this Act converted into a petition for a time-limited water quality standard under subsection (c) of this Section.
    (c) Any petition for a variance from a water quality standard under Section 35 of this Act that was filed with the Board before the effective date of this amendatory Act of the 99th General Assembly and that has not been disposed of by the Board shall be converted, by operation of law, into a petition for a time-limited water quality standard under this Section on the effective date of this amendatory Act of the 99th General Assembly.
    (d) The Board's hearings concerning the adoption of time-limited water quality standards shall be open to the public and must be held in compliance with 40 CFR 131.14, including, but not limited to, the public notice and participation requirements referenced in 40 CFR 25 and 40 CFR 131.20(b); this Section; and rules adopted by the Board under this Section.
    (e) Within 21 days after any petition for a time-limited water quality standard is filed with the Board under this Section, or within 21 days after the effective date of this amendatory Act of the 99th General Assembly in the case of a petition for time-limited water quality standard created under subsection (c) of this Section, the Agency shall file with the Board a response that:
        (1) identifies the discharger or classes of
    
dischargers affected by the water quality standard from which relief is sought;
        (2) identifies the watershed, water bodies, or
    
waterbody segments affected by the water quality standard from which relief is sought;
        (3) identifies the appropriate type of time-limited
    
water quality standard, based on factors, such as the nature of the pollutant, the condition of the affected water body, and the number and type of dischargers; and
        (4) recommends, for the purposes of subsection (h),
    
prompt deadlines for the classes of dischargers to file a substantially compliant petition.
    (f) Within 30 days after receipt of a response from the Agency under subsection (e) of this Section, the Board shall enter a final order that establishes the discharger or classes of dischargers that may be covered by the time-limited water quality standard and prompt deadlines by which the discharger and dischargers in the identified classes must, for the purposes of subsection (h), file with the Board either:
        (1) a petition for a time-limited water quality
    
standard, if the petition has not been previously filed; or
        (2) an amended petition for a time-limited water
    
quality standard, if the petition has been previously filed and it is necessary to file an amended petition to maintain a stay under paragraph (3) of subsection (h) of this Section.
    (g) As soon as practicable after entering an order under subsection (f), the Board shall conduct an evaluation of the petition to assess its substantial compliance with 40 CFR 131.14, this Section, and rules adopted pursuant to this Section. After the Board determines that a petition is in substantial compliance with those requirements, the Agency shall file a recommendation concerning the petition.
    (h)(1) The effectiveness of a water quality standard from which relief is sought shall be stayed as to the following persons from the effective date of the water quality standard until the stay is terminated as provided in this subsection:
            (A) any person who has a petition for a variance
        
seeking relief from a water quality standard under Section 35 of this Act converted into a petition for a time-limited water quality standard under subsection (c) of this Section;
            (B) any person who files a petition for a
        
time-limited water quality standard within 35 days after the effective date of the water quality standard from which relief is sought; and
            (C) any person, not covered by subparagraph (B)
        
of this subsection, who is a member of a class of dischargers that is identified in a Board order under subsection (f) that concerns a petition for a time-limited water quality standard that was filed within 35 days after the effective date of the water quality standard from which relief is sought and who files a petition for a time-limited water quality standard before the deadline established for that class under subsection (f) of this Section.
        (2) If the Board determines that the petition of a
    
person described in paragraph (1) of this subsection is in substantial compliance, then the stay shall continue until the Board:
            (A) denies the petition and all rights to
        
judicial review of the Board order denying the petition are exhausted; or
            (B) adopts the time-limited water quality
        
standard and the United States Environmental Protection Agency either:
                (i) approves the time-limited water quality
            
standard; or
                (ii) disapproves the time-limited water
            
quality standard for failure to comply with 40 CFR 131.14.
        (3) If the Board determines that the petition of a
    
person described in paragraph (1) of this subsection is not in substantial compliance, then the Board shall enter an interim order that identifies the deficiencies in the petition that must be corrected for the petition to be in substantial compliance. The petitioner must file an amended petition by the deadlines adopted by the Board pursuant to subsection (f), and the Board shall enter, after the applicable Board-established deadline, a final order that determines whether the amended petition is in substantial compliance.
        (4) If the Board determines that the amended petition
    
described in paragraph (3) of this subsection is in substantial compliance, then the stay shall continue until the Board:
            (A) denies the petition and all rights to
        
judicial review of the Board order denying the petition are exhausted; or
            (B) adopts the time-limited water quality
        
standard and the United States Environmental Protection Agency either:
                (i) approves the time-limited water quality
            
standard; or
                (ii) disapproves the time-limited water
            
quality standard for failure to comply with 40 CFR 131.14.
        (5) If the Board determines that the amended petition
    
described in paragraph (3) of this subsection is not in substantial compliance by the Board-established deadline, the Board shall deny the petition and the stay shall continue until all rights to judicial review are exhausted.
        (6) If the Board determines that a petition for a
    
time-limited water quality standard is not in substantial compliance and if the person fails to file, on or before the Board-established deadline, an amended petition, the Board shall dismiss the petition and the stay shall continue until all rights to judicial review are exhausted.
        (7) If a person other than a person described in
    
paragraph (1) of subsection (h) of this Section files a petition for a time-limited water quality standard, then the effectiveness of the water quality standard from which relief is sought shall not be stayed as to that person. However, the person may seek a time-limited water quality standard from the Board by complying with 40 CFR 131.14, this Section, and rules adopted pursuant to this Section.
    (i) Each time-limited water quality standard adopted by the Board for more than one discharger shall set forth criteria that may be used by dischargers or classes of dischargers to obtain coverage under the time-limited water quality standard during its duration. Any discharger that has not obtained a time-limited water quality standard may obtain coverage under a Board-approved time-limited water quality standard by satisfying, at the time of the renewal or modification of that person's federal National Pollutant Discharge Elimination System (NPDES) permit or at the time the person files an application for certification under Section 401 of the federal Clean Water Act, the Board-approved criteria for coverage under the time-limited water quality standard.
    (j) Any person who is adversely affected or threatened by a final Board order entered pursuant to this Section may obtain judicial review of the Board order by filing a petition for review within 35 days after the date the Board order was served on the person affected by the order, under the provisions of the Administrative Review Law, and the rules adopted pursuant thereto, except that review shall be afforded directly in the appellate court for the district in which the cause of action arose and not in the circuit court. For purposes of judicial review under this subsection, a person is deemed to have been served with the Board's final order on the date on which the order is first published by the Board on its website.
    No challenge to the validity of a final Board order under this Section shall be made in any enforcement proceeding under Title XII of this Act as to any issue that could have been raised in a timely petition for review under this subsection.
    (k) Not later than 6 months after the effective date of this amendatory Act of the 99th General Assembly, the Agency shall propose, and not later than 9 months thereafter the Board shall adopt, rules that prescribe specific procedures and standards to be used by the Board when adopting time-limited water quality standards. The public notice and participation requirements in 40 CFR 25 and 40 CFR 131.20(b) shall be incorporated into the rules adopted under this subsection.
    Until the rules adopted under this subsection are effective, the Board may adopt time-limited water quality standards to the full extent allowed under this Section and 40 C.F.R. 131.14.
    (l) Section 5-35 of the Illinois Administrative Procedure Act, Title VII of this Act, and the other Sections in Title IX of this Act do not apply to Board proceedings under this Section.
(Source: P.A. 99-937, eff. 2-24-17.)

415 ILCS 5/Tit. X

 
    (415 ILCS 5/Tit. X heading)
TITLE X: PERMITS

415 ILCS 5/39

    (415 ILCS 5/39) (from Ch. 111 1/2, par. 1039)
    Sec. 39. Issuance of permits; procedures.
    (a) When the Board has by regulation required a permit for the construction, installation, or operation of any type of facility, equipment, vehicle, vessel, or aircraft, the applicant shall apply to the Agency for such permit and it shall be the duty of the Agency to issue such a permit upon proof by the applicant that the facility, equipment, vehicle, vessel, or aircraft will not cause a violation of this Act or of regulations hereunder. The Agency shall adopt such procedures as are necessary to carry out its duties under this Section. In making its determinations on permit applications under this Section the Agency may consider prior adjudications of noncompliance with this Act by the applicant that involved a release of a contaminant into the environment. In granting permits, the Agency may impose reasonable conditions specifically related to the applicant's past compliance history with this Act as necessary to correct, detect, or prevent noncompliance. The Agency may impose such other conditions as may be necessary to accomplish the purposes of this Act, and as are not inconsistent with the regulations promulgated by the Board hereunder. Except as otherwise provided in this Act, a bond or other security shall not be required as a condition for the issuance of a permit. If the Agency denies any permit under this Section, the Agency shall transmit to the applicant within the time limitations of this Section specific, detailed statements as to the reasons the permit application was denied. Such statements shall include, but not be limited to, the following:
        (i) the Sections of this Act which may be violated if
    
the permit were granted;
        (ii) the provision of the regulations, promulgated
    
under this Act, which may be violated if the permit were granted;
        (iii) the specific type of information, if any, which
    
the Agency deems the applicant did not provide the Agency; and
        (iv) a statement of specific reasons why the Act and
    
the regulations might not be met if the permit were granted.
    If there is no final action by the Agency within 90 days after the filing of the application for permit, the applicant may deem the permit issued; except that this time period shall be extended to 180 days when (1) notice and opportunity for public hearing are required by State or federal law or regulation, (2) the application which was filed is for any permit to develop a landfill subject to issuance pursuant to this subsection, or (3) the application that was filed is for a MSWLF unit required to issue public notice under subsection (p) of Section 39. The 90-day and 180-day time periods for the Agency to take final action do not apply to NPDES permit applications under subsection (b) of this Section, to RCRA permit applications under subsection (d) of this Section, to UIC permit applications under subsection (e) of this Section, or to CCR surface impoundment applications under subsection (y) of this Section.
    The Agency shall publish notice of all final permit determinations for development permits for MSWLF units and for significant permit modifications for lateral expansions for existing MSWLF units one time in a newspaper of general circulation in the county in which the unit is or is proposed to be located.
    After January 1, 1994 and until July 1, 1998, operating permits issued under this Section by the Agency for sources of air pollution permitted to emit less than 25 tons per year of any combination of regulated air pollutants, as defined in Section 39.5 of this Act, shall be required to be renewed only upon written request by the Agency consistent with applicable provisions of this Act and regulations promulgated hereunder. Such operating permits shall expire 180 days after the date of such a request. The Board shall revise its regulations for the existing State air pollution operating permit program consistent with this provision by January 1, 1994.
    After June 30, 1998, operating permits issued under this Section by the Agency for sources of air pollution that are not subject to Section 39.5 of this Act and are not required to have a federally enforceable State operating permit shall be required to be renewed only upon written request by the Agency consistent with applicable provisions of this Act and its rules. Such operating permits shall expire 180 days after the date of such a request. Before July 1, 1998, the Board shall revise its rules for the existing State air pollution operating permit program consistent with this paragraph and shall adopt rules that require a source to demonstrate that it qualifies for a permit under this paragraph.
    (b) The Agency may issue NPDES permits exclusively under this subsection for the discharge of contaminants from point sources into navigable waters, all as defined in the Federal Water Pollution Control Act, as now or hereafter amended, within the jurisdiction of the State, or into any well.
    All NPDES permits shall contain those terms and conditions, including, but not limited to, schedules of compliance, which may be required to accomplish the purposes and provisions of this Act.
    The Agency may issue general NPDES permits for discharges from categories of point sources which are subject to the same permit limitations and conditions. Such general permits may be issued without individual applications and shall conform to regulations promulgated under Section 402 of the Federal Water Pollution Control Act, as now or hereafter amended.
    The Agency may include, among such conditions, effluent limitations and other requirements established under this Act, Board regulations, the Federal Water Pollution Control Act, as now or hereafter amended, and regulations pursuant thereto, and schedules for achieving compliance therewith at the earliest reasonable date.
    The Agency shall adopt filing requirements and procedures which are necessary and appropriate for the issuance of NPDES permits, and which are consistent with the Act or regulations adopted by the Board, and with the Federal Water Pollution Control Act, as now or hereafter amended, and regulations pursuant thereto.
    The Agency, subject to any conditions which may be prescribed by Board regulations, may issue NPDES permits to allow discharges beyond deadlines established by this Act or by regulations of the Board without the requirement of a variance, subject to the Federal Water Pollution Control Act, as now or hereafter amended, and regulations pursuant thereto.
    (c) Except for those facilities owned or operated by sanitary districts organized under the Metropolitan Water Reclamation District Act, no permit for the development or construction of a new pollution control facility may be granted by the Agency unless the applicant submits proof to the Agency that the location of the facility has been approved by the county board of the county if in an unincorporated area, or the governing body of the municipality when in an incorporated area, in which the facility is to be located in accordance with Section 39.2 of this Act. For purposes of this subsection (c), and for purposes of Section 39.2 of this Act, the appropriate county board or governing body of the municipality shall be the county board of the county or the governing body of the municipality in which the facility is to be located as of the date when the application for siting approval is filed.
    In the event that siting approval granted pursuant to Section 39.2 has been transferred to a subsequent owner or operator, that subsequent owner or operator may apply to the Agency for, and the Agency may grant, a development or construction permit for the facility for which local siting approval was granted. Upon application to the Agency for a development or construction permit by that subsequent owner or operator, the permit applicant shall cause written notice of the permit application to be served upon the appropriate county board or governing body of the municipality that granted siting approval for that facility and upon any party to the siting proceeding pursuant to which siting approval was granted. In that event, the Agency shall conduct an evaluation of the subsequent owner or operator's prior experience in waste management operations in the manner conducted under subsection (i) of Section 39 of this Act.
    Beginning August 20, 1993, if the pollution control facility consists of a hazardous or solid waste disposal facility for which the proposed site is located in an unincorporated area of a county with a population of less than 100,000 and includes all or a portion of a parcel of land that was, on April 1, 1993, adjacent to a municipality having a population of less than 5,000, then the local siting review required under this subsection (c) in conjunction with any permit applied for after that date shall be performed by the governing body of that adjacent municipality rather than the county board of the county in which the proposed site is located; and for the purposes of that local siting review, any references in this Act to the county board shall be deemed to mean the governing body of that adjacent municipality; provided, however, that the provisions of this paragraph shall not apply to any proposed site which was, on April 1, 1993, owned in whole or in part by another municipality.
    In the case of a pollution control facility for which a development permit was issued before November 12, 1981, if an operating permit has not been issued by the Agency prior to August 31, 1989 for any portion of the facility, then the Agency may not issue or renew any development permit nor issue an original operating permit for any portion of such facility unless the applicant has submitted proof to the Agency that the location of the facility has been approved by the appropriate county board or municipal governing body pursuant to Section 39.2 of this Act.
    After January 1, 1994, if a solid waste disposal facility, any portion for which an operating permit has been issued by the Agency, has not accepted waste disposal for 5 or more consecutive calendar years, before that facility may accept any new or additional waste for disposal, the owner and operator must obtain a new operating permit under this Act for that facility unless the owner and operator have applied to the Agency for a permit authorizing the temporary suspension of waste acceptance. The Agency may not issue a new operation permit under this Act for the facility unless the applicant has submitted proof to the Agency that the location of the facility has been approved or re-approved by the appropriate county board or municipal governing body under Section 39.2 of this Act after the facility ceased accepting waste.
    Except for those facilities owned or operated by sanitary districts organized under the Metropolitan Water Reclamation District Act, and except for new pollution control facilities governed by Section 39.2, and except for fossil fuel mining facilities, the granting of a permit under this Act shall not relieve the applicant from meeting and securing all necessary zoning approvals from the unit of government having zoning jurisdiction over the proposed facility.
    Before beginning construction on any new sewage treatment plant or sludge drying site to be owned or operated by a sanitary district organized under the Metropolitan Water Reclamation District Act for which a new permit (rather than the renewal or amendment of an existing permit) is required, such sanitary district shall hold a public hearing within the municipality within which the proposed facility is to be located, or within the nearest community if the proposed facility is to be located within an unincorporated area, at which information concerning the proposed facility shall be made available to the public, and members of the public shall be given the opportunity to express their views concerning the proposed facility.
    The Agency may issue a permit for a municipal waste transfer station without requiring approval pursuant to Section 39.2 provided that the following demonstration is made:
        (1) the municipal waste transfer station was in
    
existence on or before January 1, 1979 and was in continuous operation from January 1, 1979 to January 1, 1993;
        (2) the operator submitted a permit application to
    
the Agency to develop and operate the municipal waste transfer station during April of 1994;
        (3) the operator can demonstrate that the county
    
board of the county, if the municipal waste transfer station is in an unincorporated area, or the governing body of the municipality, if the station is in an incorporated area, does not object to resumption of the operation of the station; and
        (4) the site has local zoning approval.
    (d) The Agency may issue RCRA permits exclusively under this subsection to persons owning or operating a facility for the treatment, storage, or disposal of hazardous waste as defined under this Act. Subsection (y) of this Section, rather than this subsection (d), shall apply to permits issued for CCR surface impoundments.
    All RCRA permits shall contain those terms and conditions, including, but not limited to, schedules of compliance, which may be required to accomplish the purposes and provisions of this Act. The Agency may include among such conditions standards and other requirements established under this Act, Board regulations, the Resource Conservation and Recovery Act of 1976 (P.L. 94-580), as amended, and regulations pursuant thereto, and may include schedules for achieving compliance therewith as soon as possible. The Agency shall require that a performance bond or other security be provided as a condition for the issuance of a RCRA permit.
    In the case of a permit to operate a hazardous waste or PCB incinerator as defined in subsection (k) of Section 44, the Agency shall require, as a condition of the permit, that the operator of the facility perform such analyses of the waste to be incinerated as may be necessary and appropriate to ensure the safe operation of the incinerator.
    The Agency shall adopt filing requirements and procedures which are necessary and appropriate for the issuance of RCRA permits, and which are consistent with the Act or regulations adopted by the Board, and with the Resource Conservation and Recovery Act of 1976 (P.L. 94-580), as amended, and regulations pursuant thereto.
    The applicant shall make available to the public for inspection all documents submitted by the applicant to the Agency in furtherance of an application, with the exception of trade secrets, at the office of the county board or governing body of the municipality. Such documents may be copied upon payment of the actual cost of reproduction during regular business hours of the local office. The Agency shall issue a written statement concurrent with its grant or denial of the permit explaining the basis for its decision.
    (e) The Agency may issue UIC permits exclusively under this subsection to persons owning or operating a facility for the underground injection of contaminants as defined under this Act.
    All UIC permits shall contain those terms and conditions, including, but not limited to, schedules of compliance, which may be required to accomplish the purposes and provisions of this Act. The Agency may include among such conditions standards and other requirements established under this Act, Board regulations, the Safe Drinking Water Act (P.L. 93-523), as amended, and regulations pursuant thereto, and may include schedules for achieving compliance therewith. The Agency shall require that a performance bond or other security be provided as a condition for the issuance of a UIC permit.
    The Agency shall adopt filing requirements and procedures which are necessary and appropriate for the issuance of UIC permits, and which are consistent with the Act or regulations adopted by the Board, and with the Safe Drinking Water Act (P.L. 93-523), as amended, and regulations pursuant thereto.
    The applicant shall make available to the public for inspection all documents submitted by the applicant to the Agency in furtherance of an application, with the exception of trade secrets, at the office of the county board or governing body of the municipality. Such documents may be copied upon payment of the actual cost of reproduction during regular business hours of the local office. The Agency shall issue a written statement concurrent with its grant or denial of the permit explaining the basis for its decision.
    (f) In making any determination pursuant to Section 9.1 of this Act:
        (1) The Agency shall have authority to make the
    
determination of any question required to be determined by the Clean Air Act, as now or hereafter amended, this Act, or the regulations of the Board, including the determination of the Lowest Achievable Emission Rate, Maximum Achievable Control Technology, or Best Available Control Technology, consistent with the Board's regulations, if any.
        (2) The Agency shall adopt requirements as necessary
    
to implement public participation procedures, including, but not limited to, public notice, comment, and an opportunity for hearing, which must accompany the processing of applications for PSD permits. The Agency shall briefly describe and respond to all significant comments on the draft permit raised during the public comment period or during any hearing. The Agency may group related comments together and provide one unified response for each issue raised.
        (3) Any complete permit application submitted to the
    
Agency under this subsection for a PSD permit shall be granted or denied by the Agency not later than one year after the filing of such completed application.
        (4) The Agency shall, after conferring with the
    
applicant, give written notice to the applicant of its proposed decision on the application, including the terms and conditions of the permit to be issued and the facts, conduct, or other basis upon which the Agency will rely to support its proposed action.
    (g) The Agency shall include as conditions upon all permits issued for hazardous waste disposal sites such restrictions upon the future use of such sites as are reasonably necessary to protect public health and the environment, including permanent prohibition of the use of such sites for purposes which may create an unreasonable risk of injury to human health or to the environment. After administrative and judicial challenges to such restrictions have been exhausted, the Agency shall file such restrictions of record in the Office of the Recorder of the county in which the hazardous waste disposal site is located.
    (h) A hazardous waste stream may not be deposited in a permitted hazardous waste site unless specific authorization is obtained from the Agency by the generator and disposal site owner and operator for the deposit of that specific hazardous waste stream. The Agency may grant specific authorization for disposal of hazardous waste streams only after the generator has reasonably demonstrated that, considering technological feasibility and economic reasonableness, the hazardous waste cannot be reasonably recycled for reuse, nor incinerated or chemically, physically, or biologically treated so as to neutralize the hazardous waste and render it nonhazardous. In granting authorization under this Section, the Agency may impose such conditions as may be necessary to accomplish the purposes of the Act and are consistent with this Act and regulations promulgated by the Board hereunder. If the Agency refuses to grant authorization under this Section, the applicant may appeal as if the Agency refused to grant a permit, pursuant to the provisions of subsection (a) of Section 40 of this Act. For purposes of this subsection (h), the term "generator" has the meaning given in Section 3.205 of this Act, unless: (1) the hazardous waste is treated, incinerated, or partially recycled for reuse prior to disposal, in which case the last person who treats, incinerates, or partially recycles the hazardous waste prior to disposal is the generator; or (2) the hazardous waste is from a response action, in which case the person performing the response action is the generator. This subsection (h) does not apply to any hazardous waste that is restricted from land disposal under 35 Ill. Adm. Code 728.
    (i) Before issuing any RCRA permit, any permit for a waste storage site, sanitary landfill, waste disposal site, waste transfer station, waste treatment facility, waste incinerator, or any waste-transportation operation, any permit or interim authorization for a clean construction or demolition debris fill operation, or any permit required under subsection (d-5) of Section 55, the Agency shall conduct an evaluation of the prospective owner's or operator's prior experience in waste management operations, clean construction or demolition debris fill operations, and tire storage site management. The Agency may deny such a permit, or deny or revoke interim authorization, if the prospective owner or operator or any employee or officer of the prospective owner or operator has a history of:
        (1) repeated violations of federal, State, or local
    
laws, regulations, standards, or ordinances in the operation of waste management facilities or sites, clean construction or demolition debris fill operation facilities or sites, or tire storage sites; or
        (2) conviction in this or another State of any crime
    
which is a felony under the laws of this State, or conviction of a felony in a federal court; or conviction in this or another state or federal court of any of the following crimes: forgery, official misconduct, bribery, perjury, or knowingly submitting false information under any environmental law, regulation, or permit term or condition; or
        (3) proof of gross carelessness or incompetence in
    
handling, storing, processing, transporting, or disposing of waste, clean construction or demolition debris, or used or waste tires, or proof of gross carelessness or incompetence in using clean construction or demolition debris as fill.
    (i-5) Before issuing any permit or approving any interim authorization for a clean construction or demolition debris fill operation in which any ownership interest is transferred between January 1, 2005, and the effective date of the prohibition set forth in Section 22.52 of this Act, the Agency shall conduct an evaluation of the operation if any previous activities at the site or facility may have caused or allowed contamination of the site. It shall be the responsibility of the owner or operator seeking the permit or interim authorization to provide to the Agency all of the information necessary for the Agency to conduct its evaluation. The Agency may deny a permit or interim authorization if previous activities at the site may have caused or allowed contamination at the site, unless such contamination is authorized under any permit issued by the Agency.
    (j) The issuance under this Act of a permit to engage in the surface mining of any resources other than fossil fuels shall not relieve the permittee from its duty to comply with any applicable local law regulating the commencement, location, or operation of surface mining facilities.
    (k) A development permit issued under subsection (a) of Section 39 for any facility or site which is required to have a permit under subsection (d) of Section 21 shall expire at the end of 2 calendar years from the date upon which it was issued, unless within that period the applicant has taken action to develop the facility or the site. In the event that review of the conditions of the development permit is sought pursuant to Section 40 or 41, or permittee is prevented from commencing development of the facility or site by any other litigation beyond the permittee's control, such two-year period shall be deemed to begin on the date upon which such review process or litigation is concluded.
    (l) No permit shall be issued by the Agency under this Act for construction or operation of any facility or site located within the boundaries of any setback zone established pursuant to this Act, where such construction or operation is prohibited.
    (m) The Agency may issue permits to persons owning or operating a facility for composting landscape waste. In granting such permits, the Agency may impose such conditions as may be necessary to accomplish the purposes of this Act, and as are not inconsistent with applicable regulations promulgated by the Board. Except as otherwise provided in this Act, a bond or other security shall not be required as a condition for the issuance of a permit. If the Agency denies any permit pursuant to this subsection, the Agency shall transmit to the applicant within the time limitations of this subsection specific, detailed statements as to the reasons the permit application was denied. Such statements shall include but not be limited to the following:
        (1) the Sections of this Act that may be violated if
    
the permit were granted;
        (2) the specific regulations promulgated pursuant to
    
this Act that may be violated if the permit were granted;
        (3) the specific information, if any, the Agency
    
deems the applicant did not provide in its application to the Agency; and
        (4) a statement of specific reasons why the Act and
    
the regulations might be violated if the permit were granted.
    If no final action is taken by the Agency within 90 days after the filing of the application for permit, the applicant may deem the permit issued. Any applicant for a permit may waive the 90-day limitation by filing a written statement with the Agency.
    The Agency shall issue permits for such facilities upon receipt of an application that includes a legal description of the site, a topographic map of the site drawn to the scale of 200 feet to the inch or larger, a description of the operation, including the area served, an estimate of the volume of materials to be processed, and documentation that:
        (1) the facility includes a setback of at least 200
    
feet from the nearest potable water supply well;
        (2) the facility is located outside the boundary of
    
the 10-year floodplain or the site will be floodproofed;
        (3) the facility is located so as to minimize
    
incompatibility with the character of the surrounding area, including at least a 200 foot setback from any residence, and in the case of a facility that is developed or the permitted composting area of which is expanded after November 17, 1991, the composting area is located at least 1/8 mile from the nearest residence (other than a residence located on the same property as the facility);
        (4) the design of the facility will prevent any
    
compost material from being placed within 5 feet of the water table, will adequately control runoff from the site, and will collect and manage any leachate that is generated on the site;
        (5) the operation of the facility will include
    
appropriate dust and odor control measures, limitations on operating hours, appropriate noise control measures for shredding, chipping and similar equipment, management procedures for composting, containment and disposal of non-compostable wastes, procedures to be used for terminating operations at the site, and recordkeeping sufficient to document the amount of materials received, composted, and otherwise disposed of; and
        (6) the operation will be conducted in accordance
    
with any applicable rules adopted by the Board.
    The Agency shall issue renewable permits of not longer than 10 years in duration for the composting of landscape wastes, as defined in Section 3.155 of this Act, based on the above requirements.
    The operator of any facility permitted under this subsection (m) must submit a written annual statement to the Agency on or before April 1 of each year that includes an estimate of the amount of material, in tons, received for composting.
    (n) The Agency shall issue permits jointly with the Department of Transportation for the dredging or deposit of material in Lake Michigan in accordance with Section 18 of the Rivers, Lakes, and Streams Act.
    (o) (Blank).
    (p) (1) Any person submitting an application for a permit for a new MSWLF unit or for a lateral expansion under subsection (t) of Section 21 of this Act for an existing MSWLF unit that has not received and is not subject to local siting approval under Section 39.2 of this Act shall publish notice of the application in a newspaper of general circulation in the county in which the MSWLF unit is or is proposed to be located. The notice must be published at least 15 days before submission of the permit application to the Agency. The notice shall state the name and address of the applicant, the location of the MSWLF unit or proposed MSWLF unit, the nature and size of the MSWLF unit or proposed MSWLF unit, the nature of the activity proposed, the probable life of the proposed activity, the date the permit application will be submitted, and a statement that persons may file written comments with the Agency concerning the permit application within 30 days after the filing of the permit application unless the time period to submit comments is extended by the Agency.
    When a permit applicant submits information to the Agency to supplement a permit application being reviewed by the Agency, the applicant shall not be required to reissue the notice under this subsection.
    (2) The Agency shall accept written comments concerning the permit application that are postmarked no later than 30 days after the filing of the permit application, unless the time period to accept comments is extended by the Agency.
    (3) Each applicant for a permit described in part (1) of this subsection shall file a copy of the permit application with the county board or governing body of the municipality in which the MSWLF unit is or is proposed to be located at the same time the application is submitted to the Agency. The permit application filed with the county board or governing body of the municipality shall include all documents submitted to or to be submitted to the Agency, except trade secrets as determined under Section 7.1 of this Act. The permit application and other documents on file with the county board or governing body of the municipality shall be made available for public inspection during regular business hours at the office of the county board or the governing body of the municipality and may be copied upon payment of the actual cost of reproduction.
    (q) Within 6 months after July 12, 2011 (the effective date of Public Act 97-95), the Agency, in consultation with the regulated community, shall develop a web portal to be posted on its website for the purpose of enhancing review and promoting timely issuance of permits required by this Act. At a minimum, the Agency shall make the following information available on the web portal:
        (1) Checklists and guidance relating to the
    
completion of permit applications, developed pursuant to subsection (s) of this Section, which may include, but are not limited to, existing instructions for completing the applications and examples of complete applications. As the Agency develops new checklists and develops guidance, it shall supplement the web portal with those materials.
        (2) Within 2 years after July 12, 2011 (the
    
effective date of Public Act 97-95), permit application forms or portions of permit applications that can be completed and saved electronically, and submitted to the Agency electronically with digital signatures.
        (3) Within 2 years after July 12, 2011 (the
    
effective date of Public Act 97-95), an online tracking system where an applicant may review the status of its pending application, including the name and contact information of the permit analyst assigned to the application. Until the online tracking system has been developed, the Agency shall post on its website semi-annual permitting efficiency tracking reports that include statistics on the timeframes for Agency action on the following types of permits received after July 12, 2011 (the effective date of Public Act 97-95): air construction permits, new NPDES permits and associated water construction permits, and modifications of major NPDES permits and associated water construction permits. The reports must be posted by February 1 and August 1 each year and shall include:
            (A) the number of applications received for each
        
type of permit, the number of applications on which the Agency has taken action, and the number of applications still pending; and
            (B) for those applications where the Agency has
        
not taken action in accordance with the timeframes set forth in this Act, the date the application was received and the reasons for any delays, which may include, but shall not be limited to, (i) the application being inadequate or incomplete, (ii) scientific or technical disagreements with the applicant, USEPA, or other local, state, or federal agencies involved in the permitting approval process, (iii) public opposition to the permit, or (iv) Agency staffing shortages. To the extent practicable, the tracking report shall provide approximate dates when cause for delay was identified by the Agency, when the Agency informed the applicant of the problem leading to the delay, and when the applicant remedied the reason for the delay.
    (r) Upon the request of the applicant, the Agency shall notify the applicant of the permit analyst assigned to the application upon its receipt.
    (s) The Agency is authorized to prepare and distribute guidance documents relating to its administration of this Section and procedural rules implementing this Section. Guidance documents prepared under this subsection shall not be considered rules and shall not be subject to the Illinois Administrative Procedure Act. Such guidance shall not be binding on any party.
    (t) Except as otherwise prohibited by federal law or regulation, any person submitting an application for a permit may include with the application suggested permit language for Agency consideration. The Agency is not obligated to use the suggested language or any portion thereof in its permitting decision. If requested by the permit applicant, the Agency shall meet with the applicant to discuss the suggested language.
    (u) If requested by the permit applicant, the Agency shall provide the permit applicant with a copy of the draft permit prior to any public review period.
    (v) If requested by the permit applicant, the Agency shall provide the permit applicant with a copy of the final permit prior to its issuance.
    (w) An air pollution permit shall not be required due to emissions of greenhouse gases, as specified by Section 9.15 of this Act.
    (x) If, before the expiration of a State operating permit that is issued pursuant to subsection (a) of this Section and contains federally enforceable conditions limiting the potential to emit of the source to a level below the major source threshold for that source so as to exclude the source from the Clean Air Act Permit Program, the Agency receives a complete application for the renewal of that permit, then all of the terms and conditions of the permit shall remain in effect until final administrative action has been taken on the application for the renewal of the permit.
    (y) The Agency may issue permits exclusively under this subsection to persons owning or operating a CCR surface impoundment subject to Section 22.59.
    (z) If a mass animal mortality event is declared by the Department of Agriculture in accordance with the Animal Mortality Act:
        (1) the owner or operator responsible for the
    
disposal of dead animals is exempted from the following:
            (i) obtaining a permit for the construction,
        
installation, or operation of any type of facility or equipment issued in accordance with subsection (a) of this Section;
            (ii) obtaining a permit for open burning in
        
accordance with the rules adopted by the Board; and
            (iii) registering the disposal of dead animals as
        
an eligible small source with the Agency in accordance with Section 9.14 of this Act;
        (2) as applicable, the owner or operator responsible
    
for the disposal of dead animals is required to obtain the following permits:
            (i) an NPDES permit in accordance with subsection
        
(b) of this Section;
            (ii) a PSD permit or an NA NSR permit in
        
accordance with Section 9.1 of this Act;
            (iii) a lifetime State operating permit or a
        
federally enforceable State operating permit, in accordance with subsection (a) of this Section; or
            (iv) a CAAPP permit, in accordance with Section
        
39.5 of this Act.
    All CCR surface impoundment permits shall contain those terms and conditions, including, but not limited to, schedules of compliance, which may be required to accomplish the purposes and provisions of this Act, Board regulations, the Illinois Groundwater Protection Act and regulations pursuant thereto, and the Resource Conservation and Recovery Act and regulations pursuant thereto, and may include schedules for achieving compliance therewith as soon as possible.
    The Board shall adopt filing requirements and procedures that are necessary and appropriate for the issuance of CCR surface impoundment permits and that are consistent with this Act or regulations adopted by the Board, and with the RCRA, as amended, and regulations pursuant thereto.
    The applicant shall make available to the public for inspection all documents submitted by the applicant to the Agency in furtherance of an application, with the exception of trade secrets, on its public internet website as well as at the office of the county board or governing body of the municipality where CCR from the CCR surface impoundment will be permanently disposed. Such documents may be copied upon payment of the actual cost of reproduction during regular business hours of the local office.
    The Agency shall issue a written statement concurrent with its grant or denial of the permit explaining the basis for its decision.
(Source: P.A. 101-171, eff. 7-30-19; 102-216, eff. 1-1-22; 102-558, eff. 8-20-21; 102-813, eff. 5-13-22.)

415 ILCS 5/39.1

    (415 ILCS 5/39.1) (from Ch. 111 1/2, par. 1039.1)
    Sec. 39.1. (a) In addition to such other procedures as may be available, owners or operators of emission sources individually or collectively, may apply for and obtain from the Agency permits under this Section authorizing the construction and operation, or both, of a source or sources by use of emission control strategies alternative but environmentally equivalent to emission limitations required of such sources by Board regulations or by the terms of this Act.
    The Agency shall issue such a permit or permits upon a finding that: 1) the alternative control strategy in the permit provides for attainment in the aggregate, with respect to each regulated contaminant, of equivalent or less total emissions than would otherwise be required by Board regulations for the sources subject to such permit; and 2) that air quality will otherwise be maintained consistent with Board regulations.
    (b) The Agency shall receive and process applications pursuant to subsection (a) of Section 39. The Agency may impose such permit conditions as are necessary and reasonable to assure enforceability of the permit and continuing compliance of the subject sources in the event of a change in ownership or operation of the subject sources.
    (c) At least 30 days prior to the issuance of such a permit, the Agency shall give notice of the receipt of the permit application and the Agency's proposed decision in a newspaper of general circulation in the county or counties where any source to be covered by such permit is located and shall make all documents in its record available for public inspection in accordance with and to the extent provided by Sections 7 and 7.1. The Agency shall give such further notice and opportunity for public comment, if any, as is required by the Clean Air Act, for the specific permit application.
    (d) The Agency shall, after conferring with the applicant, give detailed written notice to the applicant of the Agency's proposed decision on the application, including the terms and conditions of the permit to be issued and the facts, legal citation, conduct or other basis upon which the Agency will rely to support its proposed action. Following such notice, the Agency shall give the applicant a reasonable opportunity for a hearing in accordance with procedures adopted by the Agency.
    (e) The Agency shall act promptly upon permit applications pursuant to this Section. If the Agency fails to take final action within 180 days of receipt of a complete application, or if the application was amended, within 180 days of receipt of the last amended application, the applicant may deem the application approved as applied for or, if amended, as last amended.
    (f) At the request of the applicant, permits approved pursuant to this Section shall be submitted by the Agency to the U.S. Environmental Protection Agency as revisions to the State Implementation Plan required by Section 110 of the Clean Air Act if and when necessary to comply with the Clean Air Act. The permit applicant shall be responsible for providing any information required by the U.S. Environmental Protection Agency to justify federal approval of a State Implementation Plan, except the Agency shall be responsible for provision of information acquired during its review and for provision of any record of the public hearing when applicable.
    (g) Disapproval of a permit or approval thereof with conditions shall be subject to review by the Board pursuant to subsection (a) of Section 40, upon timely petition of the applicant.
    (h) Except as expressly required by Section 9.3 (c), economic impact analysis, including the study of economic impact provided for in Section 27, shall not be required with respect to action under this Section, nor shall any source issued a permit hereunder be subject to the emission limitations of Board regulations, other than the limitations contained in the permit issued for such source hereunder.
(Source: P.A. 82-540.)

415 ILCS 5/39.2

    (415 ILCS 5/39.2) (from Ch. 111 1/2, par. 1039.2)
    Sec. 39.2. Local siting review.
    (a) The county board of the county or the governing body of the municipality, as determined by paragraph (c) of Section 39 of this Act, shall approve or disapprove the request for local siting approval for each pollution control facility which is subject to such review. An applicant for local siting approval shall submit sufficient details describing the proposed facility and evidence to demonstrate compliance, and local siting approval shall be granted only if the proposed facility meets the following criteria:
        (i) the facility is necessary to accommodate the
    
waste needs of the area it is intended to serve;
        (ii) the facility is so designed, located and
    
proposed to be operated that the public health, safety and welfare will be protected;
        (iii) the facility is located so as to minimize
    
incompatibility with the character of the surrounding area and to minimize the effect on the value of the surrounding property;
        (iv) (A) for a facility other than a sanitary
    
landfill or waste disposal site, the facility is located outside the boundary of the 100 year flood plain or the site is flood-proofed; (B) for a facility that is a sanitary landfill or waste disposal site, the facility is located outside the boundary of the 100-year floodplain, or if the facility is a facility described in subsection (b)(3) of Section 22.19a, the site is flood-proofed;
        (v) the plan of operations for the facility is
    
designed to minimize the danger to the surrounding area from fire, spills, or other operational accidents;
        (vi) the traffic patterns to or from the facility are
    
so designed as to minimize the impact on existing traffic flows;
        (vii) if the facility will be treating, storing or
    
disposing of hazardous waste, an emergency response plan exists for the facility which includes notification, containment and evacuation procedures to be used in case of an accidental release;
        (viii) if the facility is to be located in a county
    
where the county board has adopted a solid waste management plan consistent with the planning requirements of the Local Solid Waste Disposal Act or the Solid Waste Planning and Recycling Act, the facility is consistent with that plan; for purposes of this criterion (viii), the "solid waste management plan" means the plan that is in effect as of the date the application for siting approval is filed; and
        (ix) if the facility will be located within a
    
regulated recharge area, any applicable requirements specified by the Board for such areas have been met.
    The county board or the governing body of the municipality may also consider as evidence the previous operating experience and past record of convictions or admissions of violations of the applicant (and any subsidiary or parent corporation) in the field of solid waste management when considering criteria (ii) and (v) under this Section.
    If the facility is subject to the location restrictions in Section 22.14 of this Act, compliance with that Section shall be determined as of the date the application for siting approval is filed.
    (b) No later than 14 days before the date on which the county board or governing body of the municipality receives a request for site approval, the applicant shall cause written notice of such request to be served either in person or by registered mail, return receipt requested, on the owners of all property within the subject area not solely owned by the applicant, and on the owners of all property within 250 feet in each direction of the lot line of the subject property, said owners being such persons or entities which appear from the authentic tax records of the County in which such facility is to be located; provided, that the number of all feet occupied by all public roads, streets, alleys and other public ways shall be excluded in computing the 250 feet requirement; provided further, that in no event shall this requirement exceed 400 feet, including public streets, alleys and other public ways.
    Such written notice shall also be served upon members of the General Assembly from the legislative district in which the proposed facility is located and shall be published in a newspaper of general circulation published in the county in which the site is located.
    Such notice shall state the name and address of the applicant, the location of the proposed site, the nature and size of the development, the nature of the activity proposed, the probable life of the proposed activity, the date when the request for site approval will be submitted, and a description of the right of persons to comment on such request as hereafter provided.
    (c) An applicant shall file a copy of its request with the county board of the county or the governing body of the municipality in which the proposed site is located. The request shall include (i) the substance of the applicant's proposal and (ii) all documents, if any, submitted as of that date to the Agency pertaining to the proposed facility, except trade secrets as determined under Section 7.1 of this Act. All such documents or other materials on file with the county board or governing body of the municipality shall be made available for public inspection at the office of the county board or the governing body of the municipality and may be copied upon payment of the actual cost of reproduction.
    Any person may file written comment with the county board or governing body of the municipality concerning the appropriateness of the proposed site for its intended purpose. The county board or governing body of the municipality shall consider any comment received or postmarked not later than 30 days after the date of the last public hearing.
    (d) At least one public hearing, at which an applicant shall present at least one witness to testify subject to cross-examination, is to be held by the county board or governing body of the municipality no sooner than 90 days but no later than 120 days after the date on which it received the request for site approval. No later than 14 days prior to such hearing, notice shall be published in a newspaper of general circulation published in the county of the proposed site, and delivered by certified mail to all members of the General Assembly from the district in which the proposed site is located, to the governing authority of every municipality contiguous to the proposed site or contiguous to the municipality in which the proposed site is to be located, to the county board of the county where the proposed site is to be located, if the proposed site is located within the boundaries of a municipality, and to the Agency. Members or representatives of the governing authority of a municipality contiguous to the proposed site or contiguous to the municipality in which the proposed site is to be located and, if the proposed site is located in a municipality, members or representatives of the county board of a county in which the proposed site is to be located may appear at and participate in public hearings held pursuant to this Section. The public hearing shall develop a record sufficient to form the basis of appeal of the decision in accordance with Section 40.1 of this Act. The fact that a member of the county board or governing body of the municipality has publicly expressed an opinion on an issue related to a site review proceeding shall not preclude the member from taking part in the proceeding and voting on the issue.
    (e) Decisions of the county board or governing body of the municipality are to be in writing, confirming a public hearing was held with testimony from at least one witness presented by the applicant, specifying the reasons for the decision, such reasons to be in conformance with subsection (a) of this Section. In granting approval for a site the county board or governing body of the municipality may impose such conditions as may be reasonable and necessary to accomplish the purposes of this Section and as are not inconsistent with regulations promulgated by the Board. Such decision shall be available for public inspection at the office of the county board or governing body of the municipality and may be copied upon payment of the actual cost of reproduction. If there is no final action by the county board or governing body of the municipality within 180 days after the date on which it received the request for site approval, the applicant may deem the request approved.
    At the public hearing, at any time prior to completion by the applicant of the presentation of the applicant's factual evidence, testimony, and an opportunity for cross-examination by the county board or governing body of the municipality and any participants, the applicant may file not more than one amended application upon payment of additional fees pursuant to subsection (k); in which case the time limitation for final action set forth in this subsection (e) shall be extended for an additional period of 90 days.
    If, prior to making a final local siting decision, a county board or governing body of a municipality has negotiated and entered into a host agreement with the local siting applicant, the terms and conditions of the host agreement, whether written or oral, shall be disclosed and made a part of the hearing record for that local siting proceeding. In the case of an oral agreement, the disclosure shall be made in the form of a written summary jointly prepared and submitted by the county board or governing body of the municipality and the siting applicant and shall describe the terms and conditions of the oral agreement.
    (e-5) Siting approval obtained pursuant to this Section is transferable and may be transferred to a subsequent owner or operator. In the event that siting approval has been transferred to a subsequent owner or operator, that subsequent owner or operator assumes and takes subject to any and all conditions imposed upon the prior owner or operator by the county board of the county or governing body of the municipality pursuant to subsection (e). However, any such conditions imposed pursuant to this Section may be modified by agreement between the subsequent owner or operator and the appropriate county board or governing body. Further, in the event that siting approval obtained pursuant to this Section has been transferred to a subsequent owner or operator, that subsequent owner or operator assumes all rights and obligations and takes the facility subject to any and all terms and conditions of any existing host agreement between the prior owner or operator and the appropriate county board or governing body.
    (f) A local siting approval granted under this Section shall expire at the end of 2 calendar years from the date upon which it was granted, unless the local siting approval granted under this Section is for a sanitary landfill operation, in which case the approval shall expire at the end of 3 calendar years from the date upon which it was granted, and unless within that period the applicant has made application to the Agency for a permit to develop the site. In the event that the local siting decision has been appealed, such expiration period shall be deemed to begin on the date upon which the appeal process is concluded.
    Except as otherwise provided in this subsection, upon the expiration of a development permit under subsection (k) of Section 39, any associated local siting approval granted for the facility under this Section shall also expire.
    If a first development permit for a municipal waste incineration facility expires under subsection (k) of Section 39 after September 30, 1989 due to circumstances beyond the control of the applicant, any associated local siting approval granted for the facility under this Section may be used to fulfill the local siting approval requirement upon application for a second development permit for the same site, provided that the proposal in the new application is materially the same, with respect to the criteria in subsection (a) of this Section, as the proposal that received the original siting approval, and application for the second development permit is made before January 1, 1990.
    (g) The siting approval procedures, criteria and appeal procedures provided for in this Act for new pollution control facilities shall be the exclusive siting procedures and rules and appeal procedures for facilities subject to such procedures. Local zoning or other local land use requirements shall not be applicable to such siting decisions.
    (h) Nothing in this Section shall apply to any existing or new pollution control facility located within the corporate limits of a municipality with a population of over 1,000,000.
    (i) (Blank.)
    The Board shall adopt regulations establishing the geologic and hydrologic siting criteria necessary to protect usable groundwater resources which are to be followed by the Agency in its review of permit applications for new pollution control facilities. Such regulations, insofar as they apply to new pollution control facilities authorized to store, treat or dispose of any hazardous waste, shall be at least as stringent as the requirements of the Resource Conservation and Recovery Act and any State or federal regulations adopted pursuant thereto.
    (j) Any new pollution control facility which has never obtained local siting approval under the provisions of this Section shall be required to obtain such approval after a final decision on an appeal of a permit denial.
    (k) A county board or governing body of a municipality may charge applicants for siting review under this Section a reasonable fee to cover the reasonable and necessary costs incurred by such county or municipality in the siting review process.
    (l) The governing Authority as determined by subsection (c) of Section 39 of this Act may request the Department of Transportation to perform traffic impact studies of proposed or potential locations for required pollution control facilities.
    (m) An applicant may not file a request for local siting approval which is substantially the same as a request which was disapproved pursuant to a finding against the applicant under any of criteria (i) through (ix) of subsection (a) of this Section within the preceding 2 years.
    (n) In any review proceeding of a decision of the county board or governing body of a municipality made pursuant to the local siting review process, the petitioner in the review proceeding shall pay to the county or municipality the cost of preparing and certifying the record of proceedings. Should the petitioner in the review proceeding fail to make payment, the provisions of Section 3-109 of the Code of Civil Procedure shall apply.
    In the event the petitioner is a citizens' group that participated in the siting proceeding and is so located as to be affected by the proposed facility, such petitioner shall be exempt from paying the costs of preparing and certifying the record.
    (o) Notwithstanding any other provision of this Section, a transfer station used exclusively for landscape waste, where landscape waste is held no longer than 24 hours from the time it was received, is not subject to the requirements of local siting approval under this Section, but is subject only to local zoning approval.