Illinois General Assembly

  Bills & Resolutions  
  Compiled Statutes  
  Public Acts  
  Legislative Reports  
  IL Constitution  
  Legislative Guide  
  Legislative Glossary  

 Search By Number
 (example: HB0001)
Search Tips

Search By Keyword

Illinois Compiled Statutes

Information maintained by the Legislative Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.

Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.

ENVIRONMENTAL SAFETY
(415 ILCS 5/) Environmental Protection Act.

415 ILCS 5/12.2

    (415 ILCS 5/12.2) (from Ch. 111 1/2, par. 1012.2)
    Sec. 12.2. Water pollution construction permit fees.
    (a) Beginning July 1, 2003, the Agency shall collect a fee in the amount set forth in this Section:
        (1) for any sewer which requires a construction
    
permit under paragraph (b) of Section 12, from each applicant for a sewer construction permit under paragraph (b) of Section 12 or regulations adopted hereunder; and
        (2) for any treatment works, industrial pretreatment
    
works, or industrial wastewater source that requires a construction permit under paragraph (b) of Section 12, from the applicant for the construction permit. However, no fee shall be required for a treatment works or wastewater source directly covered and authorized under an NPDES permit issued by the Agency, nor for any treatment works, industrial pretreatment works, or industrial wastewater source (i) that is under or pending construction authorized by a valid construction permit issued by the Agency prior to July 1, 2003, during the term of that construction permit, or (ii) for which a completed construction permit application has been received by the Agency prior to July 1, 2003, with respect to the permit issued under that application.
    (b) Each applicant or person required to pay a fee under this Section shall submit the fee to the Agency along with the permit application. The Agency shall deny any construction permit application for which a fee is required under this Section that does not contain the appropriate fee.
    (c) The amount of the fee is as follows:
        (1) A $100 fee shall be required for any sewer
    
constructed with a design population of 1.
        (2) A $400 fee shall be required for any sewer
    
constructed with a design population of 2 to 20.
        (3) A $800 fee shall be required for any sewer
    
constructed with a design population greater than 20 but less than 101.
        (4) A $1200 fee shall be required for any sewer
    
constructed with a design population greater than 100 but less than 500.
        (5) A $2400 fee shall be required for any sewer
    
constructed with a design population of 500 or more.
        (6) A $1,000 fee shall be required for any industrial
    
wastewater source that does not require pretreatment of the wastewater prior to discharge to the publicly owned treatment works or publicly regulated treatment works.
        (7) A $3,000 fee shall be required for any industrial
    
wastewater source that requires pretreatment of the wastewater for non-toxic pollutants prior to discharge to the publicly owned treatment works or publicly regulated treatment works.
        (8) A $6,000 fee shall be required for any industrial
    
wastewater source that requires pretreatment of the wastewater for toxic pollutants prior to discharge to the publicly owned treatment works or publicly regulated treatment works.
        (9) A $2,500 fee shall be required for construction
    
relating to land application of industrial sludge or spray irrigation of industrial wastewater.
    All fees collected by the Agency under this Section shall be deposited into the Environmental Protection Permit and Inspection Fund in accordance with Section 22.8.
    (d) Prior to a final Agency decision on a permit application for which a fee has been paid under this Section, the applicant may propose modification to the application in accordance with this Act and regulations adopted hereunder without any additional fee becoming due, unless the proposed modifications cause an increase in the design population served by the sewer specified in the permit application before the modifications or the modifications cause a change in the applicable fee category stated in subsection (c). If the modifications cause such an increase or change the fee category and the increase results in additional fees being due under subsection (c), the applicant shall submit the additional fee to the Agency with the proposed modifications.
    (e) No fee shall be due under this Section from:
        (1) any department, agency or unit of State
    
government for installing or extending a sewer;
        (2) any unit of local government with which the
    
Agency has entered into a written delegation agreement under Section 4 which allows such unit to issue construction permits under this Title, or regulations adopted hereunder, for installing or extending a sewer; or
        (3) any unit of local government or school district
    
for installing or extending a sewer where both of the following conditions are met:
            (i) the cost of the installation or extension is
        
paid wholly from monies of the unit of local government or school district, State grants or loans, federal grants or loans, or any combination thereof; and
            (ii) the unit of local government or school
        
district is not given monies, reimbursed or paid, either in whole or in part, by another person (except for State grants or loans or federal grants or loans) for the installation or extension.
    (f) The Agency may establish procedures relating to the collection of fees under this Section. The Agency shall not refund any fee paid to it under this Section. Notwithstanding the provisions of any rule adopted before July 1, 2003 concerning fees under this Section, the Agency shall assess and collect the fees imposed under subdivision (a)(2) of this Section and the increases in the fees imposed under subdivision (a)(1) of this Section beginning on July 1, 2003, for all completed applications received on or after that date.
    (g) Notwithstanding any other provision of this Act, the Agency shall, not later than 45 days following the receipt of both an application for a construction permit and the fee required by this Section, either approve that application and issue a permit or tender to the applicant a written statement setting forth with specificity the reasons for the disapproval of the application and denial of a permit. If the Agency takes no final action within 45 days after the filing of the application for a permit, the applicant may deem the permit issued.
    (h) For purposes of this Section:
    "Toxic pollutants" means those pollutants defined in Section 502(13) of the federal Clean Water Act and regulations adopted pursuant to that Act.
    "Industrial" refers to those industrial users referenced in Section 502(13) of the federal Clean Water Act and regulations adopted pursuant to that Act.
    "Pretreatment" means the reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the nature of pollutant properties in wastewater prior to or in lieu of discharging or otherwise introducing those pollutants into a publicly owned treatment works or publicly regulated treatment works.
(Source: P.A. 93-32, eff. 7-1-03.)

415 ILCS 5/12.3

    (415 ILCS 5/12.3) (from Ch. 111 1/2, par. 1012.3)
    Sec. 12.3. Septic system sludge. Beginning January 1, 1993, any wastewater treatment facility or other appropriate waste disposal facility owned or operated by a unit of local government located in a county with a population of less than 3,000,000 may accept, for appropriate treatment or disposal, any septic system sludge generated by any private residence within that unit of local government or within any other unit of local government that is located within the same county and not served by its own wastewater treatment facility. The unit of local government may establish and charge reasonable fees for the acceptance, handling, treatment, and disposal of the sludge to defray any additional capital costs incurred specifically to comply with this Section.
    This Section does not limit any power exercised by a unit of local government under any other law.
(Source: P.A. 87-1138.)

415 ILCS 5/12.4

    (415 ILCS 5/12.4)
    Sec. 12.4. Vegetable by-product; land application; report. In addition to any other requirements of this Act, a generator of vegetable by-products utilizing land application shall prepare an annual report identifying the quantity of vegetable by-products transported for land application during the reporting period, the hauler or haulers utilized for the transportation, and the sites to which the vegetable by-products were transported. The report must be retained on the premises of the generator for a minimum of 5 calendar years after the end of the applicable reporting period and must, during that time, be made available to the Agency for inspection and copying during normal business hours.
(Source: P.A. 100-103, eff. 8-11-17.)

415 ILCS 5/12.5

    (415 ILCS 5/12.5)
    Sec. 12.5. NPDES discharge fees; sludge permit fees.
    (a) Beginning July 1, 2003, the Agency shall assess and collect annual fees (i) in the amounts set forth in subsection (e) for all discharges that require an NPDES permit under subsection (f) of Section 12, from each person holding an NPDES permit authorizing those discharges (including a person who continues to discharge under an expired permit pending renewal), and (ii) in the amounts set forth in subsection (f) of this Section for all activities that require a permit under subsection (b) of Section 12, from each person holding a domestic sewage sludge generator or user permit.
    Each person subject to this Section must remit the applicable annual fee to the Agency in accordance with the requirements set forth in this Section and any rules adopted pursuant to this Section.
    (b) Within 30 days after the effective date of this Section, and each year thereafter, except when a fee is not due because of the operation of subsection (c), the Agency shall send a fee notice by mail to each existing permittee subject to a fee under this Section at his or her address of record. The notice shall state the amount of the applicable annual fee and the date by which payment is required.
    Except as provided in subsection (c) with respect to initial fees under new permits and certain modifications of existing permits, fees payable under this Section are due by the date specified in the fee notice, which shall be no less than 30 days after the date the fee notice is mailed by the Agency.
    (c) The initial annual fee for discharges under a new NPDES permit or for activity under a new sludge generator or sludge user permit must be remitted to the Agency prior to the issuance of the permit. The Agency shall provide notice of the amount of the fee to the applicant during its review of the application. In the case of a new NPDES or sludge permit issued during the months of January through June, the Agency may prorate the initial annual fee payable under this Section.
    The initial annual fee for discharges or other activity under a general NPDES permit must be remitted to the Agency as part of the application for coverage under that general permit.
    Beginning January 1, 2010, in the case of construction site storm water discharges for which a coverage letter under a general NPDES permit or individual NPDES permit has been issued or for which the application for coverage under an NPDES permit has been filed with the Agency, no annual fee shall be due after payment of an initial annual fee in the amount provided in subsection (e)(10) of this Section.
    If a requested modification to an existing NPDES permit causes a change in the applicable fee categories under subsection (e) that results in an increase in the required fee, the permittee must pay to the Agency the amount of the increase, prorated for the number of months remaining before the next July 1, before the modification is granted.
    (d) Failure to submit the fee required under this Section by the due date constitutes a violation of this Section. Late payments shall incur an interest penalty, calculated at the rate in effect from time to time for tax delinquencies under subsection (a) of Section 1003 of the Illinois Income Tax Act, from the date the fee is due until the date the fee payment is received by the Agency.
    (e) The annual fees applicable to discharges under NPDES permits are as follows:
        (1) For NPDES permits for publicly owned treatment
    
works, other facilities for which the wastewater being treated and discharged is primarily domestic sewage, and wastewater discharges from the operation of public water supply treatment facilities, the fee is:
            (i) $1,500 for the 12 months beginning July 1,
        
2003 and $500 for each subsequent year, for facilities with a Design Average Flow rate of less than 100,000 gallons per day;
            (ii) $5,000 for the 12 months beginning July 1,
        
2003 and $2,500 for each subsequent year, for facilities with a Design Average Flow rate of at least 100,000 gallons per day but less than 500,000 gallons per day;
            (iii) $7,500 for facilities with a Design Average
        
Flow rate of at least 500,000 gallons per day but less than 1,000,000 gallons per day;
            (iv) $15,000 for facilities with a Design Average
        
Flow rate of at least 1,000,000 gallons per day but less than 5,000,000 gallons per day;
            (v) $30,000 for facilities with a Design Average
        
Flow rate of at least 5,000,000 gallons per day but less than 10,000,000 gallons per day; and
            (vi) $50,000 for facilities with a Design Average
        
Flow rate of 10,000,000 gallons per day or more.
        (2) For NPDES permits for treatment works or sewer
    
collection systems that include combined sewer overflow outfalls, the fee is:
            (i) $1,000 for systems serving a tributary
        
population of 10,000 or less;
            (ii) $5,000 for systems serving a tributary
        
population that is greater than 10,000 but not more than 25,000; and
            (iii) $20,000 for systems serving a tributary
        
population that is greater than 25,000.
        The fee amounts in this subdivision (e)(2) are in
    
addition to the fees stated in subdivision (e)(1) when the combined sewer overflow outfall is contained within a permit subject to subsection (e)(1) fees.
        (3) For NPDES permits for mines producing coal, the
    
fee is $5,000.
        (4) For NPDES permits for mines other than mines
    
producing coal, the fee is $5,000.
        (5) For NPDES permits for industrial activity where
    
toxic substances are not regulated, other than permits covered under subdivision (e)(3) or (e)(4), the fee is:
            (i) $1,000 for a facility with a Design Average
        
Flow rate that is not more than 10,000 gallons per day;
            (ii) $2,500 for a facility with a Design Average
        
Flow rate that is more than 10,000 gallons per day but not more than 100,000 gallons per day; and
            (iii) $10,000 for a facility with a Design
        
Average Flow rate that is more than 100,000 gallons per day.
        (6) For NPDES permits for industrial activity where
    
toxic substances are regulated, other than permits covered under subdivision (e)(3) or (e)(4), the fee is:
            (i) $15,000 for a facility with a Design Average
        
Flow rate that is not more than 250,000 gallons per day; and
            (ii) $20,000 for a facility with a Design Average
        
Flow rate that is more than 250,000 gallons per day.
        (7) For NPDES permits for industrial activity
    
classified by USEPA as a major discharge, other than permits covered under subdivision (e)(3) or (e)(4), the fee is:
            (i) $30,000 for a facility where toxic substances
        
are not regulated; and
            (ii) $50,000 for a facility where toxic
        
substances are regulated.
        (8) For NPDES permits for municipal separate storm
    
sewer systems, the fee is $1,000.
        (9) For NPDES permits for industrial storm water, the
    
fee is $500.
        (10) For NPDES permits for construction site storm
    
water, the fee
            (A) for applications received before January 1,
        
2010 is $500;
            (B) for applications received on or after January
        
1, 2010 is:
                (i) $250 if less than 5 acres are disturbed;
            
and
                (ii) $750 if 5 or more acres are disturbed.
        (11) For an NPDES permit for a Concentrated Animal
    
Feeding Operation (CAFO), the fee is:
            (A) $750 for a Large CAFO, as defined in 40
        
C.F.R. 122.23(b)(4);
            (B) $350 for a Medium CAFO, as defined in 40
        
C.F.R. 122.23(b)(6); and
            (C) $150 for a Small CAFO, as defined in 40
        
C.F.R. 122.23(b)(9).
    (f) The annual fee for activities under a permit that authorizes applying sludge on land is $2,500 for a sludge generator permit and $5,000 for a sludge user permit.
    (g) More than one of the annual fees specified in subsections (e) and (f) may be applicable to a permit holder. These fees are in addition to any other fees required under this Act.
    (h) The fees imposed under this Section do not apply to the State or any department or agency of the State, nor to any school district, or to any private sewage disposal system as defined in the Private Sewage Disposal Licensing Act (225 ILCS 225/).
    (i) The Agency may adopt rules to administer the fee program established in this Section. The Agency may include provisions pertaining to invoices, notice of late payment, refunds, and disputes concerning the amount or timeliness of payment. The Agency may set forth procedures and criteria for the acceptance of payments. The absence of such rules does not affect the duty of the Agency to immediately begin the assessment and collection of fees under this Section.
    (j) All fees and interest penalties collected by the Agency under this Section shall be deposited into the Illinois Clean Water Fund, which is hereby created as a special fund in the State treasury. Gifts, supplemental environmental project funds, and grants may be deposited into the Fund. Investment earnings on moneys held in the Fund shall be credited to the Fund.
    Subject to appropriation, the moneys in the Fund shall be used by the Agency to carry out the Agency's clean water activities.
    (k) Except as provided in subsection (l) or Agency rules, fees paid to the Agency under this Section are not refundable.
    (l) The Agency may refund the difference between (a) the amount paid by any person under subsection (e)(1)(i) or (e)(1)(ii) of this Section for the 12 months beginning July 1, 2004 and (b) the amount due under subsection (e)(1)(i) or (e)(1)(ii) as established by this amendatory Act of the 93rd General Assembly.
(Source: P.A. 96-245, eff. 8-11-09; 97-962, eff. 8-15-12.)

415 ILCS 5/12.6

    (415 ILCS 5/12.6)
    Sec. 12.6. Certification fees.
    (a) Beginning July 1, 2003, the Agency shall collect a fee in the amount set forth in subsection (b) from each applicant for a state water quality certification required by Section 401 of the federal Clean Water Act prior to a federal authorization pursuant to Section 404 of that Act; except that the fee does not apply to the State or any department or agency of the State, nor to any school district.
    (b) The amount of the fee for a State water quality certification is $350 or 1% of the gross value of the proposed project, whichever is greater, but not to exceed $10,000.
    (c) Each applicant seeking a federal authorization of an action requiring a Section 401 state water quality certification by the Agency shall submit the required fee to the Agency prior to the issuance of the certification. The Agency shall provide notice of the amount of the fee to the applicant during its review of the application. The Agency shall not issue a Section 401 state water quality certification until the appropriate fee has been received from the applicant.
    (d) The Agency may establish procedures relating to the collection of fees under this Section. Notwithstanding the adoption of any rules establishing such procedures, the Agency may begin collecting fees under this Section on July 1, 2003 for all complete applications received on or after that date.
    All fees collected by the Agency under this Section shall be deposited into the Illinois Clean Water Fund. Fees paid under this Section are not refundable.
(Source: P.A. 95-516, eff. 8-28-07.)

415 ILCS 5/13

    (415 ILCS 5/13) (from Ch. 111 1/2, par. 1013)
    Sec. 13. Regulations.
    (a) The Board, pursuant to procedures prescribed in Title VII of this Act, may adopt regulations to promote the purposes and provisions of this Title. Without limiting the generality of this authority, such regulations may among other things prescribe:
        (1) Water quality standards specifying among other
    
things, the maximum short-term and long-term concentrations of various contaminants in the waters, the minimum permissible concentrations of dissolved oxygen and other desirable matter in the waters, and the temperature of such waters;
        (2) Effluent standards specifying the maximum amounts
    
or concentrations, and the physical, chemical, thermal, biological and radioactive nature of contaminants that may be discharged into the waters of the State, as defined herein, including, but not limited to, waters to any sewage works, or into any well, or from any source within the State;
        (3) Standards for the issuance of permits for
    
construction, installation, or operation of any equipment, facility, vessel, or aircraft capable of causing or contributing to water pollution or designed to prevent water pollution or for the construction or installation of any sewer or sewage treatment facility or any new outlet for contaminants into the waters of this State;
        (4) The circumstances under which the operators of
    
sewage works are required to obtain and maintain certification by the Agency under Section 13.5 and the types of sewage works to which those requirements apply, which may, without limitation, include wastewater treatment works, pretreatment works, and sewers and collection systems;
        (5) Standards for the filling or sealing of abandoned
    
water wells and holes, and holes for disposal of drainage in order to protect ground water against contamination;
        (6) Standards and conditions regarding the sale,
    
offer, or use of any pesticide, detergent, or any other article determined by the Board to constitute a water pollution hazard, provided that any such regulations relating to pesticides shall be adopted only in accordance with the "Illinois Pesticide Act", approved August 14, 1979 as amended;
        (7) Alert and abatement standards relative to
    
water-pollution episodes or emergencies which constitute an acute danger to health or to the environment;
        (8) Requirements and procedures for the inspection of
    
any equipment, facility, or vessel that may cause or contribute to water pollution;
        (9) Requirements and standards for equipment and
    
procedures for monitoring contaminant discharges at their sources, the collection of samples and the collection, reporting and retention of data resulting from such monitoring.
    (b) Notwithstanding other provisions of this Act and for purposes of implementing an NPDES program, the Board shall adopt:
        (1) Requirements, standards, and procedures which,
    
together with other regulations adopted pursuant to this Section 13, are necessary or appropriate to enable the State of Illinois to implement and participate in the National Pollutant Discharge Elimination System (NPDES) pursuant to and under the Federal Water Pollution Control Act, as now or hereafter amended. All regulations adopted by the Board governing the NPDES program shall be consistent with the applicable provisions of such federal Act and regulations pursuant thereto, and otherwise shall be consistent with all other provisions of this Act, and shall exclude from the requirement to obtain any operating permit otherwise required under this Title a facility for which an NPDES permit has been issued under Section 39(b); provided, however, that for purposes of this paragraph, a UIC permit, as required under Section 12(g) and 39(d) of this Act, is not an operating permit.
        (2) Regulations for the exemption of any category or
    
categories of persons or contaminant sources from the requirement to obtain any NPDES permit prescribed or from any standards or conditions governing such permit when the environment will be adequately protected without the requirement of such permit, and such exemption is either consistent with the Federal Water Pollution Control Act, as now or hereafter amended, or regulations pursuant thereto, or is necessary to avoid an arbitrary or unreasonable hardship to such category or categories of persons or sources.
    (c) In accordance with Section 7.2, and notwithstanding any other provisions of this Act, for purposes of implementing a State UIC program, the Board shall adopt regulations which are identical in substance to federal regulations or amendments thereto promulgated by the Administrator of the United States Environmental Protection Agency in accordance with Section 1421 of the Safe Drinking Water Act (P.L. 93-523), as amended. The Board may consolidate into a single rulemaking under this Section all such federal regulations adopted within a period of time not to exceed 6 months. The provisions and requirements of Title VII of this Act shall not apply to regulations adopted under this subsection. Section 5-35 of the Illinois Administrative Procedure Act relating to procedures for rulemaking shall not apply to regulations adopted under this subsection.
    (d) The Board may adopt regulations relating to a State UIC program that are not inconsistent with and are at least as stringent as the Safe Drinking Water Act (P.L. 93-523), as amended, or regulations adopted thereunder. Regulations adopted pursuant to this subsection shall be adopted in accordance with the provisions and requirements of Title VII of this Act and the procedures for rulemaking in Section 5-35 of the Illinois Administrative Procedure Act.
(Source: P.A. 93-170, eff. 7-10-03.)

415 ILCS 5/13.1

    (415 ILCS 5/13.1) (from Ch. 111 1/2, par. 1013.1)
    Sec. 13.1. Groundwater monitoring network.
    (a) (Blank.)
    (b) The Agency shall establish a Statewide groundwater monitoring network. Such network shall include a sufficient number of testing wells to assess the current levels of contamination in the groundwaters of the State and to detect any future degradation of groundwater resources. The monitoring network shall give special emphasis to critical groundwater areas and to locations near hazardous waste disposal facilities. To the extent possible, the network shall utilize existing publicly or privately operated drinking water or monitoring wells.
    (c) (Blank.)
    (d) (Blank.)
(Source: P.A. 92-574, eff. 6-26-02.)

415 ILCS 5/13.2

    (415 ILCS 5/13.2) (from Ch. 111 1/2, par. 1013.2)
    Sec. 13.2. At the request of the owner or user of a private well, the Agency shall provide for annual testing of water from private wells located within 1/2 mile of any active or inactive sanitary landfill or hazardous waste disposal facility at no charge to the owner of the well.
    Before obtaining a sample for testing, the Agency shall, not less than 5 business days prior to obtaining the sample, notify the owner or operator of the sanitary landfill or hazardous waste disposal facility of the opportunity to obtain a split sample and specify the sampling procedure, testing procedure and analytical parameters to be evaluated.
    Sample collection shall be conducted in cooperation with the Illinois Department of Public Health and the recognized local health department, where one exists, in whose jurisdiction the well is located. The Illinois Department of Public Health and the local health department shall be provided with a written report of results upon completion of sample testing.
(Source: P.A. 83-1528.)

415 ILCS 5/13.3

    (415 ILCS 5/13.3) (from Ch. 111 1/2, par. 1013.3)
    Sec. 13.3. In accordance with Section 7.2, the Board shall adopt regulations which are identical in substance to federal regulations or amendments thereto promulgated by the Administrator of the United States Environmental Protection Agency to implement Sections 307(b), (c), (d), 402(b)(8) and 402(b)(9) of the Federal Water Pollution Control Act, as amended. The Board may consolidate into a single rulemaking under this Section all such federal regulations adopted within a period of time not to exceed 6 months. The provisions and requirements of Title VII of this Act shall not apply to regulations adopted under this Section. Sections 5-35 and 5-75 of the Illinois Administrative Procedure Act relating to procedures for rulemaking shall not apply to regulations adopted under this Section. However, the Board shall provide for notice and public comment before adopted rules are filed with the Secretary of State.
(Source: P.A. 88-45; 89-445, eff. 2-7-96.)

415 ILCS 5/13.4

    (415 ILCS 5/13.4)
    Sec. 13.4. Pretreatment market system.
    (a) The General Assembly finds:
        (1) That achieving compliance with federal, State,
    
and local pretreatment regulatory requirements calls for innovative and cost-effective implementation strategies.
        (2) That economic incentives and market-based
    
approaches can be used to achieve pretreatment compliance in an innovative and cost-effective manner.
        (3) That development and operation of a pretreatment
    
market system should significantly lessen the economic impacts associated with implementation of the pretreatment requirements and still achieve the desired water quality, sludge quality, and protection of the sewers and treatment system.
    (b) The Agency shall design a pretreatment market system that will provide more flexibility for municipalities and their tributary dischargers to develop cost-effective solutions and will result in at least the total pollutant reduction as achieved by the current application of federal categorical standards, State pretreatment limits, and locally derived limits, as applicable. Such a system should also assist publicly-owned treatment works in meeting applicable NPDES permit limits and in preventing the discharge of pollutants in quantities that would interfere with the operation of the municipal sewer system. In developing this system, the Agency shall consult with interested publicly-owned treatment works and tributary dischargers to ensure that relevant economic, environmental, and administrative factors are taken into account. As necessary, the Agency shall also consult with the United States Environmental Protection Agency regarding the suitability of such a system.
    (c) The Agency may adopt proposed rules for a market-based pretreatment pollutant reduction, banking, and trading system that will enable publicly-owned treatment works and their tributary dischargers to implement cost-effective compliance options. Any proposal shall be adopted in accordance with the provisions of the Illinois Administrative Procedure Act.
    (d) Notwithstanding the other provisions of this Act, a publicly-owned treatment works may implement a pretreatment market system that is consistent with subsection (b) of this Section, provided that the publicly-owned treatment works:
        (1) operates an approved local pretreatment program
    
pursuant to State and federal NPDES regulations;
        (2) is not currently subject to enforcement action
    
for violation of NPDES requirements;
        (3) receives wastewater from tributary dischargers
    
that are subject to federal categorical pretreatment standards or approved local pretreatment limits; and
        (4) has modified, as appropriate, the local
    
pretreatment program to incorporate such market system.
    (e) Prior to implementation of any pretreatment market system, a publicly-owned treatment works shall notify the Agency in writing of its intention and request the Agency to make a consistency determination regarding the local system's conformance with the rules promulgated pursuant to subsection (c) of this Section. Within 120 days, the Agency shall provide the determination in writing to the publicly-owned treatment works.
    (f) Notwithstanding the other provisions of this Act, any discharger that is tributary to a publicly-owned treatment works with a pretreatment market system shall be eligible to exchange trading units with dischargers tributary to the same publicly-owned treatment works or with the publicly-owned treatment works to which it is tributary.
    (g) Nothing in this Section shall be deemed to authorize a publicly-owned treatment works:
        (1) to mandate the exchange of trading units by a
    
tributary discharger in a pretreatment market system implemented pursuant to this Section; or
        (2) to mandate reductions in pollutants from any
    
tributary discharger beyond that otherwise required by federal categorical and State pretreatment standards or approved local pretreatment limits.
(Source: P.A. 90-773, eff. 8-14-98.)

415 ILCS 5/13.5

    (415 ILCS 5/13.5)
    Sec. 13.5. Sewage works; operator certification.
    (a) For the purposes of this Section, the term "sewage works" includes, without limitation, wastewater treatment works, pretreatment works, and sewers and collection systems.
    (b) The Agency may establish and enforce standards for the definition and certification of the technical competency of personnel who operate sewage works, and for ascertaining that sewage works are under the supervision of trained individuals whose qualifications have been approved by the Agency.
    (c) The Agency may issue certificates of competency to persons meeting the standards of technical competency established by the Agency under this Section, and may promulgate and enforce regulations pertaining to the issuance and use of those certificates.
    (d) The Agency shall administer the certification program established under this Section. The Agency may enter into formal working agreements with other departments or agencies of State or local government under which all or portions of its authority under this Section may be delegated to the cooperating department or agency.
    (e) This Section and the changes made to subdivision (a)(4) of Section 13 by this amendatory Act of the 93rd General Assembly do not invalidate the operator certification rules previously adopted by the Agency and codified as Part 380 of Title 35, Subtitle C, Chapter II of the Illinois Administrative Code. Those rules, as amended from time to time, shall continue in effect until they are superseded or repealed.
(Source: P.A. 93-170, eff. 7-10-03.)

415 ILCS 5/13.6

    (415 ILCS 5/13.6)
    Sec. 13.6. Release of radionuclides at nuclear power plants.
    (a) The purpose of this Section is to require the detection and reporting of unpermitted releases of any radionuclides into groundwater, surface water, or soil at nuclear power plants, to the extent that federal law or regulation does not preempt such requirements.
    (b) No owner or operator of a nuclear power plant shall violate any rule adopted under this Section.
    (c) Within 24 hours after an unpermitted release of a radionuclide from a nuclear power plant, the owner or operator of the nuclear power plant where the release occurred shall report the release to the Agency and the Illinois Emergency Management Agency. For purposes of this Section, "unpermitted release of a radionuclide" means any spilling, leaking, emitting, discharging, escaping, leaching, or disposing of a radionuclide into groundwater, surface water, or soil that is not permitted under State or federal law or regulation.
    (d) The Agency and the Illinois Emergency Management Agency shall inspect each nuclear power plant for compliance with the requirements of this Section and rules adopted pursuant to this Section no less than once each calendar quarter. Nothing in this Section shall limit the Agency's authority to make inspections under Section 4 or any other provision of this Act.
    (e) No later than one year after the effective date of this amendatory Act of the 94th General Assembly, the Agency, in consultation with the Illinois Emergency Management Agency, shall propose rules to the Board prescribing standards for detecting and reporting unpermitted releases of radionuclides. No later than one year after receipt of the Agency's proposal, the Board shall adopt rules prescribing standards for detecting and reporting unpermitted releases of radionuclides.
(Source: P.A. 94-849, eff. 6-12-06; 95-66, eff. 8-13-07.)

415 ILCS 5/13.7

    (415 ILCS 5/13.7)
    Sec. 13.7. Carbon dioxide sequestration sites.
    (a) For purposes of this Section, the term "carbon dioxide sequestration site" means a site or facility for which the Agency has issued a permit for the underground injection of carbon dioxide.
    (b) The Agency shall inspect carbon dioxide sequestration sites for compliance with this Act, rules adopted under this Act, and permits issued by the Agency.
    (c) If the Agency issues a seal order under Section 34 of this Act in relation to a carbon dioxide sequestration site, or if a civil action for an injunction to halt activity at a carbon dioxide sequestration site is initiated under Section 43 of this Act at the request of the Agency, then the Agency shall post notice of such action on its website.
    (d) Persons seeking a permit or permit modification for the underground injection of carbon dioxide shall be liable to the Agency for all reasonable and documented costs incurred by the Agency that are associated with review and issuance of the permit, including, but not limited to, costs associated with public hearings and the review of permit applications. Once a permit is issued, the permittee shall be liable to the Agency for all reasonable and documented costs incurred by the Agency that are associated with inspections and other oversight of the carbon dioxide sequestration site. Persons liable for costs under this subsection (d) must pay the costs upon invoicing, or other request or demand for payment, by the Agency. Costs for which a person is liable under this subsection (d) are in addition to any other fees, penalties, or other relief provided under this Act or any other law.
    Moneys collected under this subsection (d) shall be deposited into the Environmental Protection Permit and Inspection Fund established under Section 22.8 of this Act. The Agency may adopt rules relating to the collection of costs due under this subsection (d).
    (e) The Agency shall not issue a permit or permit modification for the underground injection of carbon dioxide unless all costs for which the permittee is liable under subsection (d) of this Section have been paid.
    (f) No person shall fail or refuse to pay costs for which the person is liable under subsection (d) of this Section.
(Source: P.A. 97-96, eff. 7-13-11; 97-239, eff. 8-2-11.)

415 ILCS 5/13.8

    (415 ILCS 5/13.8)
    Sec. 13.8. Algicide permits. No person shall be required to obtain a permit from the Agency to apply a commercially available algicide, such as copper sulfate or a copper sulfate solution, in accordance with the instructions of its manufacturer, to a body of water that: (i) is located wholly on private property, (ii) is not a water of the United States for purposes of the Federal Water Pollution Control Act, and (iii) is not used as a community water supply source.
(Source: P.A. 100-802, eff. 8-10-18.)

415 ILCS 5/13.9

    (415 ILCS 5/13.9)
    Sec. 13.9. Mahomet Aquifer natural gas storage study.
    (a) Subject to appropriation, the Prairie Research Institute shall:
        (1) use remote sensing technologies, such as
    
helicopter-based time domain electromagnetics, post-processing methods, and geologic modeling software, to examine, characterize, and prepare three-dimensional models of the unconsolidated geologic materials overlying any underground natural gas storage facility located within the boundaries of the Mahomet Aquifer; and
        (2) to the extent possible, identify within those
    
unconsolidated geologic materials potential structures and migration pathways for natural gas that may be released from the underground natural gas storage facility.
    (b) For purposes of this Section, "underground natural gas storage facility" has the meaning provided in Section 5 of the Illinois Underground Natural Gas Storage Safety Act.
(Source: P.A. 101-573, eff. 1-1-20.)

415 ILCS 5/13.10

    (415 ILCS 5/13.10)
    Sec. 13.10. Microplastics. By March 1, 2024, the Agency shall make publicly available on its website the following information:
        (1) a description of microplastics and their effects
    
on aquatic life and human health, including relevant background information and sources of microplastics;
        (2) any federal and State regulatory actions taken to
    
address microplastics and their effects on aquatic life and human health;
        (3) contact information for an employee of the Agency
    
who is available to provide information on microplastics if a member of the public has questions or concerns; and
        (4) additional resources, including, but not limited
    
to, links to webpages containing information on microplastics on the United States Environmental Protection Agency's website, the National Oceanic and Atmospheric Administration's website, the National Institutes of Health's website, the websites of other State agencies and universities, and other scientifically reputable websites that may contain additional relevant information on microplastics.
    The Agency shall update the website as additional information or data regarding microplastics in the State becomes available.
    By October 1, 2024, the Agency shall submit a report to the General Assembly and the Governor that provides an overview of any Agency actions relating to microplastics, a comparative analysis of actions in other states regarding microplastics in the environment, and information on the latest guidance from the United States Environmental Protection Agency.
(Source: P.A. 103-93, eff. 1-1-24.)

415 ILCS 5/Tit. IV

 
    (415 ILCS 5/Tit. IV heading)
TITLE IV: PUBLIC WATER SUPPLIES

415 ILCS 5/14

    (415 ILCS 5/14) (from Ch. 111 1/2, par. 1014)
    Sec. 14. The General Assembly finds that state supervision of public water supplies is necessary in order to protect the public from disease and to assure an adequate supply of pure water for all beneficial uses.
    It is the purpose of this Title to assure adequate protection of public water supplies.
(Source: P.A. 76-2429.)

415 ILCS 5/14.1

    (415 ILCS 5/14.1) (from Ch. 111 1/2, par. 1014.1)
    Sec. 14.1. Community water supply; minimum setback zone. A minimum setback zone is established for the location of each new community water supply well as follows:
    (a) No new community water supply well may be located within 200 feet of any potential primary or potential secondary source or any potential route.
    (b) No new community water supply well deriving water from fractured or highly permeable bedrock or from an unconsolidated and unconfined sand and gravel formation may be located within 400 feet of any potential primary or potential secondary source or any potential route. Such 400 foot setback is not applicable to any new community water supply well where the potential primary or potential secondary source is located within a site for which certification is currently in effect pursuant to Section 14.5.
    (c) Nothing in this Section shall affect any location and construction requirement imposed in Section 6 of the "Illinois Water Well Construction Code", approved August 20, 1965, as amended, and the regulations promulgated thereunder.
    (d) For the purposes of this Section, a community water supply well is "new" if it is constructed after September 24, 1987.
    (e) Nothing in this Section shall affect the minimum distance requirements for new community water supply wells relative to common sources of sanitary pollution as specified by rules adopted under Section 17 of this Act.
(Source: P.A. 92-574, eff. 6-26-02.)

415 ILCS 5/14.2

    (415 ILCS 5/14.2) (from Ch. 111 1/2, par. 1014.2)
    Sec. 14.2. New potential source or route; minimum setback zone. A minimum setback zone is established for the location of each new potential source or new potential route as follows:
    (a) Except as provided in subsections (b), (c) and (h) of this Section, no new potential route or potential primary source or potential secondary source may be placed within 200 feet of any existing or permitted community water supply well or other potable water supply well.
    (b) The owner of a new potential primary source or a potential secondary source or a potential route may secure a waiver from the requirement of subsection (a) of this Section for a potable water supply well other than a community water supply well. A written request for a waiver shall be made to the owner of the water well and the Agency. Such request shall identify the new or proposed potential source or potential route, shall generally describe the possible effect of such potential source or potential route upon the water well and any applicable technology-based controls which will be utilized to minimize the potential for contamination, and shall state whether, and under what conditions, the requestor will provide an alternative potable water supply. Waiver may be granted by the owner of the water well no less than 90 days after receipt of the request unless prior to such time the Agency notifies the well owner that it does not concur with the request.
    The Agency shall not concur with any such request which fails to accurately describe reasonably foreseeable effects of the potential source or potential route upon the water well or any applicable technology-based controls. Such notification by the Agency shall be in writing, and shall include a statement of reasons for the nonconcurrence. Waiver of the minimum setback zone established under subsection (a) of this Section shall extinguish the water well owner's rights under Section 6b of the Illinois Water Well Construction Code but shall not preclude enforcement of any law regarding water pollution. If the owner of the water well has not granted a waiver within 120 days after receipt of the request or the Agency has notified the owner that it does not concur with the request, the owner of a potential source or potential route may file a petition for an exception with the Board and the Agency pursuant to subsection (c) of this Section.
    No waiver under this Section is required where the potable water supply well is part of a private water system as defined in the Illinois Groundwater Protection Act, and the owner of such well will also be the owner of a new potential secondary source or a potential route. In such instances, a prohibition of 75 feet shall apply and the owner shall notify the Agency of the intended action so that the Agency may provide information regarding the potential hazards associated with location of a potential secondary source or potential route in close proximity to a potable water supply well.
    (c) The Board may grant an exception from the setback requirements of this Section and subsection (e) of Section 14.3 to the owner of a new potential route, a new potential primary source other than landfilling or land treating, or a new potential secondary source. The owner seeking an exception with respect to a community water supply well shall file a petition with the Board and the Agency. The owner seeking an exception with respect to a potable water supply well other than a community water supply well shall file a petition with the Board and the Agency, and set forth therein the circumstances under which a waiver has been sought but not obtained pursuant to subsection (b) of this Section. A petition shall be accompanied by proof that the owner of each potable water supply well for which setback requirements would be affected by the requested exception has been notified and been provided with a copy of the petition. A petition shall set forth such facts as may be required to support an exception, including a general description of the potential impacts of such potential source or potential route upon groundwaters and the affected water well, and an explanation of the applicable technology-based controls which will be utilized to minimize the potential for contamination of the potable water supply well.
    The Board shall grant an exception, whenever it is found upon presentation of adequate proof, that compliance with the setback requirements of this Section would pose an arbitrary and unreasonable hardship upon the petitioner, that the petitioner will utilize the best available technology controls economically achievable to minimize the likelihood of contamination of the potable water supply well, that the maximum feasible alternative setback will be utilized, and that the location of such potential source or potential route will not constitute a significant hazard to the potable water supply well.
    The Board shall adopt procedural rules governing requests for exceptions under this subsection. The rulemaking provisions of Title VII of this Act and of Section 5-35 of the Illinois Administrative Procedure Act shall not apply to such rules. A decision made by the Board pursuant to this subsection shall constitute a final determination.
    The granting of an exception by the Board shall not extinguish the water well owner's rights under Section 6b of the Illinois Water Well Construction Code in instances where the owner has elected not to provide a waiver pursuant to subsection (b) of this Section.
    (d) Except as provided in subsections (c) and (h) of this Section and Section 14.5, no new potential route or potential primary source or potential secondary source may be placed within 400 feet of any existing or permitted community water supply well deriving water from an unconfined shallow fractured or highly permeable bedrock formation or from an unconsolidated and unconfined sand and gravel formation. The Agency shall notify the owner and operator of each well which is afforded this setback protection and shall maintain a directory of all community water supply wells to which the 400 foot minimum setback zone applies.
    (e) The minimum setback zones established under subsections (a) and (b) of this Section shall not apply to new common sources of sanitary pollution as specified pursuant to Section 17 and the regulations adopted thereunder by the Agency; however, no such common sources may be located within the applicable minimum distance from a community water supply well specified by such regulations.
    (f) Nothing in this Section shall be construed as limiting the power of any county or municipality to adopt ordinances which are consistent with but not more stringent than the prohibitions herein.
    (g) Nothing in this Section shall preclude any arrangement under which the owner or operator of a new source or route does the following:
        (1) purchases an existing water supply well and
    
attendant property with the intent of eventually abandoning or totally removing the well;
        (2) replaces an existing water supply well with a new
    
water supply of substantially equivalent quality and quantity as a precondition to locating or constructing such source or route;
        (3) implements any other arrangement which is
    
mutually agreeable with the owner of a water supply well; or
        (4) modifies the on-site storage capacity at an
    
agrichemical facility such that the volume of pesticide storage does not exceed 125% of the available capacity in existence on April 1, 1990, or the volume of fertilizer storage does not exceed 150% of the available capacity in existence on April 1, 1990; provided that a written endorsement for an agrichemical facility permit is in effect under Section 39.4 of this Act and the maximum feasible setback is maintained. This on-site storage capacity includes mini-bulk pesticides, package agrichemical storage areas, liquid or dry fertilizers, and liquid or dry pesticides.
    (h) A new potential route, which is an excavation for stone, sand or gravel and which becomes active on lands which were acquired or were being held as mineral reserves prior to September 24, 1987, shall only be subject to the setback requirements of subsections (a) and (d) of this Section with respect to any community water supply well, non-community water system well, or semi-private water system well in existence prior to January 1, 1988.
(Source: P.A. 92-574, eff. 6-26-02.)

415 ILCS 5/14.3

    (415 ILCS 5/14.3) (from Ch. 111 1/2, par. 1014.3)
    Sec. 14.3. Community water supply; maximum setback zone. A maximum setback zone may be established for a community water supply well as follows:
    (a) Owners of community water supplies which utilize any water well, or any county or municipality served by any community water supply well, may determine the lateral area of influence of the well under normal operational conditions. The Agency shall adopt procedures by which such determinations may be made including, where appropriate, pumping tests and estimation techniques.
    (b) Where the results of any determination made pursuant to subsection (a) of this Section disclose that the distance from the well to the outermost boundary of the lateral area of influence of the well under normal operational conditions exceeds the radius of the minimum setback zone established for that well pursuant to Section 14.2, any county or municipality served by such water supply may in writing request the Agency to review and confirm the technical adequacy of such determination. The Agency shall, within 90 days of the request, notify the county or municipality whether the determination is technically adequate for describing the outer boundary of drawdown of the affected groundwater by the well under normal operational conditions. Any action by the Agency hereunder shall be in writing and shall constitute a final determination of the Agency.
    (c) Upon receipt of Agency confirmation of the technical adequacy of such determination, the county or municipality may, after notice and opportunity for comment, adopt an ordinance setting forth the location of each affected well and specifying the boundaries of a maximum setback zone, which boundaries may be irregular. In no event, however, shall any portion of such a boundary be in excess of 1,000 feet from the wellhead, except as provided by subsection (f) of this Section. Such ordinance shall include the area within the applicable minimum setback zone and shall incorporate requirements which are consistent with but not more stringent than the prohibitions of this Act and the regulations promulgated by the Board under Section 14.4, except as provided by subsection (f) of this Section. Upon adoption, the county or municipality shall provide a copy of the ordinance to the Agency. Any county or municipality which fails to adopt such an ordinance within 2 years of receipt of Agency confirmation of technical adequacy may not proceed under the authority of this Section without obtaining a new confirmation of the technical adequacy pursuant to subsection (b) of this Section.
    (d) After July 1, 1989, and upon written notice to the county or municipality, the Agency may propose to the Board a regulation establishing a maximum setback zone for any well subject to this Section. Such proposal shall be based upon all reasonably available hydrogeologic information, include the justification for expanding the zone of wellhead protection, and specify the boundaries of such zone, no portion of which boundaries shall be in excess of 1,000 feet from the wellhead. Such justification may include the need to protect a sole source of public water supply or a highly vulnerable source of groundwater, or an Agency finding that the presence of potential primary or potential secondary sources or potential routes represents a significant hazard to the public health or the environment. The Agency may proceed with the filing of such a proposal unless the county or municipality, within 30 days of the receipt of the written notice, files a written request for a conference with the Agency. Upon receipt of such a request, the Agency shall schedule a conference to be held within 90 days thereafter. At the conference, the Agency shall inform the county or municipality regarding the proposal. Within 30 days after the conference, the affected unit of local government may provide written notice to the Agency of its intent to establish a maximum setback zone in lieu of the Agency acting on a proposal. Upon receipt of such a notice of intent, the Agency may not file a proposal with the Board for a period of 6 months. Rulemaking proceedings initiated by the Agency under this subsection shall be conducted by the Board pursuant to Title VII of this Act, except that subsection (b) of Section 27 shall not apply.
    Nothing in this Section shall be construed as limiting the general authority of the Board to promulgate regulations pursuant to Title VII of this Act. Nothing in this subsection shall limit the right of any person to participate in rulemaking proceedings conducted by the Board under this subsection.
    (e) Except as provided in subsection (c) of Section 14.2, no new potential primary source shall be placed within the maximum setback zone established for any community water supply well pursuant to subsection (c) or (d) of this Section. Nothing in this subsection shall be construed as limiting the power of any county or municipality to adopt ordinances which are consistent with but not more stringent than the prohibition as stated herein.
    (f) If an active community water supply well is withdrawing groundwater from within the alluvial deposits and is located within 1000 feet of public waters, the boundaries of a maximum setback zone adopted by ordinance pursuant to subsection (c) may be established to a distance of 2,500 feet from the wellhead. No new potential route shall be placed, operated or utilized within the maximum setback zone established for any community water supply well pursuant to this subsection. Restrictions provided in subsection (e) shall not be applied beyond 1,000 feet from the wellhead for maximum setback zones adopted pursuant to this subsection. An ordinance which creates a maximum setback zone as described by this subsection shall also be consistent with subsections (a), (b) and (c) of this Section, including incorporation of requirements which are consistent with but no more stringent than the prohibitions of this Act. For purposes of this subsection, the term "public waters" means public waters as defined in Section 18 of the Rivers, Lakes, and Streams Act, as now or hereafter amended.
(Source: P.A. 92-574, eff. 6-26-02.)

415 ILCS 5/14.4

    (415 ILCS 5/14.4) (from Ch. 111 1/2, par. 1014.4)
    Sec. 14.4. Groundwater rules.
    (a) No later than January 1, 1989, the Agency, after consultation with the Interagency Coordinating Committee on Groundwater and the Groundwater Advisory Council, shall propose regulations to the Board prescribing standards and requirements for the following activities:
        (1) landfilling, land treating, surface impounding or
    
piling of special waste and other wastes which could cause contamination of groundwater and which are generated on the site, other than hazardous, livestock and landscape waste, and construction and demolition debris;
        (2) storage of special waste in an underground
    
storage tank for which federal regulatory requirements for the protection of groundwater are not applicable;
        (3) storage and related handling of pesticides and
    
fertilizers at a facility for the purpose of commercial application;
        (4) storage and related handling of road oils and
    
de-icing agents at a central location; and
        (5) storage and related handling of pesticides and
    
fertilizers at a central location for the purpose of distribution to retail sales outlets.
    In preparing such regulation, the Agency shall provide as it deems necessary for more stringent provisions for those activities enumerated in this subsection which are not already in existence. Any activity for which such standards and requirements are proposed may be referred to as a new activity. For the purposes of this Section, the term "commercial application" shall not include the use of pesticides or fertilizers in a manner incidental to the primary business activity.
    (b) No later than October 1, 1993, the Board shall promulgate appropriate regulations for existing activities. In promulgating these regulations, the Board shall, in addition to the factors set forth in Title VII of this Act, consider the following:
        (1) appropriate programs for water quality monitoring;
        (2) reporting, recordkeeping and remedial response
    
measures;
        (3) appropriate technology-based measures for
    
pollution control; and
        (4) requirements for closure or discontinuance of
    
operations.
    Such regulations as are promulgated pursuant to this subsection shall be for the express purpose of protecting groundwaters. The applicability of such regulations shall be limited to any existing activity which is located:
        (A) within a setback zone regulated by this Act,
    
other than an activity located on the same site as a non-community water system well and for which the owner is the same for both the activity and the well; or
        (B) within a regulated recharge area as delineated by
    
Board regulation, provided that:
            (i) the boundary of the lateral area of influence
        
of a community water supply well located within the recharge area includes such activity therein;
            (ii) the distance from the wellhead of the
        
community water supply to the activity does not exceed 2500 feet; and
            (iii) the community water supply well was in
        
existence prior to January 1, 1988.
    In addition, the Board shall ensure that the promulgated regulations are consistent with and not pre-emptive of the certification system provided by Section 14.5. The Board shall modify the regulations adopted under this subsection to provide an exception for existing activities subject to Section 14.6.
    (c) Concurrently with the action mandated by subsection (a), the Agency shall evaluate, with respect to the protection of groundwater, the adequacy of existing federal and State regulations regarding the disposal of hazardous waste and the offsite disposal of special and municipal wastes. The Agency shall then propose, as it deems necessary, additional regulations for such new disposal activities as may be necessary to achieve a level of groundwater protection that is consistent with the regulations proposed under subsection (a) of this Section.
    (d) Following receipt of proposed regulations submitted by the Agency pursuant to subsection (a) of this Section, the Board shall promulgate appropriate regulations for new activities. In promulgating these regulations, the Board shall, in addition to the factors set forth in Title VII of this Act, consider the following:
        (1) appropriate programs for water quality
    
monitoring, including, where appropriate, notification limitations to trigger preventive response activities;
        (2) design practices and technology-based measures
    
appropriate for minimizing the potential for groundwater contamination;
        (3) reporting, recordkeeping and remedial response
    
measures; and
        (4) requirements for closure or discontinuance of
    
operations.
    Such regulations as are promulgated pursuant to this subsection shall be for the express purpose of protecting groundwaters. The applicability of such regulations shall be limited to any new activity which is to be located within a setback zone regulated by this Act, or which is to be located within a regulated recharge area as delineated by Board regulation. In addition, the Board shall ensure that the promulgated regulations are consistent with and not pre-emptive of the certification system provided by Section 14.5. The Board shall modify the regulations adopted under this subsection to provide an exception for new activities subject to Section 14.6.
    (e) Nothing in this Section shall be construed as prohibiting any person for whom regulations are promulgated by the Board pursuant to subsection (b) or (c) of this Section, from proposing and obtaining, concurrently with the regulations proposed by the Agency pursuant to subsection (a) of this Section, a rule specific to individual persons or sites pursuant to Title VII of this Act which codifies alternative groundwater protection methods that provide substantially equivalent protection for community water supplies.
    (f) Nothing in this Section shall be construed as limiting the power of any county or municipality to adopt ordinances, which are consistent with but not more stringent than the regulations adopted by the Board pursuant to this Section, for application of standards and requirements within such setback zones as are provided by this Act.
    (g) The Agency shall prepare a groundwater protection regulatory agenda for submittal to the Interagency Coordinating Committee on Groundwater and the Groundwater Advisory Council. In preparing this agenda, the Agency shall consider situations where gaps may exist in federal or State regulatory protection for groundwater, or where further refinements could be necessary to achieve adequate protection of groundwater.
    (h) Nothing in this Section shall be construed as limiting the general authority of the Board to promulgate regulations pursuant to Title VII of this Act.
    (i) The Board's rulemaking with respect to subsection (a)(3) of this Section shall take into account the relevant aspects of the Department of Agriculture's Part 255 regulations which specify containment rules for agrichemical facilities.
(Source: P.A. 92-574, eff. 6-26-02.)

415 ILCS 5/14.5

    (415 ILCS 5/14.5) (from Ch. 111 1/2, par. 1014.5)
    Sec. 14.5. (a) The Agency shall administer a certification system for sites which represent a minimal hazard with respect to contamination of groundwaters by potential primary or potential secondary sources. No later than January 1, 1988, the Agency shall develop and make available a minimal hazard certification form and guidelines for the use and management of containers and above ground tanks, and for the piling of waste.
    (b) After January 1, 1988, the owner of any site which would otherwise be subject to the provisions of subsection (d) of Section 14.2 or Section 14.4 and regulations adopted thereunder may provide a certification of minimal hazard to the Agency if the following conditions are met:
        (1) no on-site landfilling, land treating, or surface
    
impounding of waste, other than landscape waste or construction and demolition debris, has taken place and such circumstance will continue;
        (2) no on-site piles of special or hazardous waste
    
are present and such circumstance will continue, and any piling of other wastes which could cause contamination of groundwater will be consistent with guidelines developed by the Agency;
        (3) no underground storage tanks are present on the
    
site and such circumstances will continue;
        (4) use and management of containers and above ground
    
tanks will be consistent with guidelines developed by the Agency;
        (5) no on-site release of any hazardous substance or
    
petroleum has taken place which was of sufficient magnitude to contaminate groundwaters;
        (6) no more than 100 gallons of either pesticides or
    
organic solvents, or 10,000 gallons of any hazardous substances, or 30,000 gallons of petroleum, will be present at any time; and
        (7) notice has been given to the owner of each
    
community water supply well within 1,000 feet of the site.
    (c) Upon receipt of a certification pursuant to subsection (b) of this Section the Agency shall, within 90 days, take one of the following actions:
        (1) notify the owner of the site in writing that the
    
certification is complete and adequate;
        (2) notify the owner of the site in writing that the
    
certification is not adequate, including a statement of the reasons therefor;
        (3) notify the owner of the site in writing that a
    
site inspection will be held within 120 days, and that following such inspection but still within the 120 day period further action will be taken pursuant to item (1) or (2) of this subsection; or
        (4) notify in writing the owner of the site that
    
pursuant to Section 17.1 a county or municipality is conducting a groundwater protection needs assessment or the Agency is conducting a well site survey which encompasses the site for which certification is being processed, and specify a time period, not to exceed a total of 180 days from the date of the notice, for consideration of the findings from such assessment or survey and by which further action will be taken pursuant to item (1) or (2) of this subsection.
    A certification is not adequate if it fails to address each of the conditions required to be met by subsection (b) of this Section, or if the Agency possesses information which reasonably suggests that any statement made in the certification is inaccurate or incomplete. Action under item (1) or (2) of this subsection shall constitute a final determination of the Agency.
    (d) When a certification has been provided with respect to which the Agency has made a finding of adequacy or has failed to act in a timely manner pursuant to subsection (c) of this Section, the site shall not be subject to the provisions of subsection (d) of Section 14.2 or Section 14.4 and regulations adopted thereunder for the following time periods:
        (1) one year, if the Agency has failed to act in a
    
timely manner pursuant to subsection (c) of this Section, during which time the owner must recertify to continue such status;
        (2) three years, if the site is located within a
    
minimum or maximum setback zone, during which time the owner must recertify to continue such status;
        (3) five years, if the site is located within a
    
regulated recharge area, during which time the owner must recertify to continue such status; or
        (4) 90 days past the time when a change of ownership
    
takes place, during which time the new owner must recertify to continue such status.
    (e) During the effective period of a certification, the owner of the site shall maintain compliance with the conditions specified in subsection (b) of this Section. Any failure by the owner to maintain such compliance shall be just cause for decertification by the Agency. Such action may only be taken after the Agency has provided the owner with a written notice which identifies the noncompliance and specifies a 30 day period during which a written response may be provided by the owner. Such response may describe any actions taken by the owner which relate to the conditions of certification. If such response is deficient or untimely, the Agency shall serve notice upon the owner that the site has been decertified and is subject to the applicable provisions of subsection (d) of Section 14.2 or Section 14.4 and regulations adopted thereunder. Such notification shall constitute a final determination of the Agency.
    (f) The Agency shall maintain a master listing, indexed by county, of those sites for which certifications are in effect. Upon the establishment of a regional planning committee pursuant to Section 17.2, the Agency shall provide a copy of the pertinent portions of such listing to such committee on a quarterly basis. The Agency shall also make copies of such listing available to units of local government and the public upon request.
    (g) The Agency may enter into a written delegation agreement with any county or municipality, which has adopted an ordinance consistent with Section 14.2 or 14.3, to administer the provisions of this Section. Such delegation agreements shall require that the work to be performed thereunder shall be in accordance with criteria established by the Agency, be subject to periodic review by the Agency, and shall include such financial and program auditing by the Agency as may be necessary.
(Source: P.A. 91-357, eff. 7-29-99.)

415 ILCS 5/14.6

    (415 ILCS 5/14.6) (from Ch. 111 1/2, par. 1014.6)
    Sec. 14.6. Agrichemical facilities.
    (a) Notwithstanding the provisions of Section 14.4, groundwater protection for storage and related handling of pesticides and fertilizers at a facility for the purpose of commercial application or at a central location for the purpose of distribution to retail sales outlets may be provided by adherence to the provisions of this Section. For any such activity to be subject to this Section, the following action must be taken by an owner or operator:
        (1) with respect to agrichemical facilities, as
    
defined by the Illinois Pesticide Act, the Illinois Fertilizer Act and regulations adopted thereunder, file a written notice of intent to be subject to the provisions of this Section with the Department of Agriculture by January 1, 1993, or within 6 months after the date on which a maximum setback zone is established or a regulated recharge area regulation is adopted that affects such a facility;
        (2) with respect to lawn care facilities that are
    
subject to the containment area provisions of the Lawn Care Products Application and Notice Act and its regulations, file a written notice of intent to be subject to the provisions of this Section with the Department of Agriculture by January 1, 1993, or within 6 months after the date on which a maximum setback zone is established or a regulated recharge area regulation is adopted that affects such a facility;
        (3) with respect to a central distribution location
    
that is not an agrichemical facility, certify intent to be subject to the provisions of this Section on the appropriate license or renewal application form submitted to the Department of Agriculture; or
        (4) with respect to any other affected facility,
    
certify intent to be subject to the provisions of this Section on the appropriate renewal application forms submitted to the Department of Agriculture or other appropriate agency.
    An owner or operator of a facility that takes the action described in this subsection shall be subject to the provisions of this Section and shall not be regulated under the provisions of Section 14.4, except as provided in subsection (d) of this Section. The Department of Agriculture or other appropriate agency shall provide copies of the written notices and certifications to the Agency. For the purposes of this subsection, the term "commercial application" shall not include the use of pesticides or fertilizers in a manner incidental to the primary business activity.
    (b) The Agency and Department of Agriculture shall cooperatively develop a program for groundwater protection for designated facilities or sites consistent with the activities specified in subsection (a) of this Section. In developing such a program, the Agency and the Department of Agriculture shall consult with affected interests and take into account relevant information. Based on such agreed program, the Department of Agriculture shall adopt appropriate regulatory requirements for the designated facilities or sites and administer a program. At a minimum, the following considerations must be adequately addressed as part of such program:
        (1) a facility review process, using available
    
information when appropriate, to determine those sites where groundwater monitoring will be implemented;
        (2) requirements for groundwater quality monitoring
    
for sites identified under item (1);
        (3) reporting, response, and operating practices for
    
the types of designated facilities; and
        (4) requirements for closure or discontinuance of
    
operations.
    (c) The Agency may enter into a written agreement with any State agency to operate a cooperative program for groundwater protection for designated facilities or sites consistent with the activities specified in subparagraph (4) of subsection (a) of this Section. Such State agency shall adopt appropriate regulatory requirements for the designated facilities or sites and necessary procedures and practices to administer the program.
    (d) The Agency shall ensure that any facility that is subject to this Section is in compliance with applicable provisions as specified in subsection (b) or (c) of this Section. To fulfill this responsibility, the Agency may rely on information provided by another State agency or other information that is obtained on a direct basis. If a facility is not in compliance with the applicable provisions, or a deficiency in the execution of a program affects such a facility, the Agency may so notify the facility of this condition and shall provide 30 days for a written response to be filed. The response may describe any actions taken by the owner which relate to the condition of noncompliance. If the response is deficient or untimely, the Agency shall serve notice upon the owner that the facility is subject to the applicable provisions of Section 14.4 of this Act and regulations adopted thereunder.
    (e) (Blank.)
    (f) After January 1, 1994, and before one year after the date on which a maximum setback zone is established or a regulated recharge area regulation is adopted that affects a facility subject to the provisions of this Section, an owner or operator of such a facility may withdraw the notice given under subsection (a) of this Section by filing a written withdrawal statement with the Department of Agriculture. Within 45 days after such filing and after consultation with the Agency, the Department of Agriculture shall provide written confirmation to the owner or operator that the facility is no longer subject to the provisions of this Section and must comply with the applicable provisions of Section 14.4 within 90 days after receipt of the confirmation. The Department of Agriculture shall provide copies of the written confirmations to the Agency.
    (g) On or after August 11, 1994, an owner or operator of an agrichemical facility that is subject to the provisions of Section 14.4 and regulations adopted thereunder solely because of the presence of an on-site potable water supply well that is not a non-community water supply may file a written notice with the Department of Agriculture by January 1, 1995 declaring the facility to be subject to the provisions of this Section. When that action is taken, the regulatory requirements of subsection (b) of this Section shall be applicable beginning January 1, 1995. Beginning on January 1, 1995, such facilities shall be subject to either Section 14.4 or this Section depending on the action taken under this subsection. An owner or operator of an agrichemical facility that is subject to this Section because a written notice was filed under this subsection shall do all of the following:
        (1) File a facility review report with the Department
    
of Agriculture on or before February 28, 1995 consistent with the regulatory requirements of subsection (b) of this Section.
        (2) Implement an approved monitoring program within
    
120 days of receipt of the Department of Agriculture's determination or a notice to proceed from the Department of Agriculture. The monitoring program shall be consistent with the requirements of subsection (b) of this Section.
        (3) Implement applicable operational and management
    
practice requirements and submit a permit application or modification to meet applicable structural provisions consistent with those in subsection (b) of this Section on or before July 1, 1995 and complete construction of applicable structural requirements on or before January 1, 1996.
Notwithstanding the provisions of this subsection, an owner or operator of an agrichemical facility that is subject to the provisions of Section 14.4 and regulations adopted thereunder solely because of the presence of an on-site private potable water supply well may file a written notice with the Department of Agriculture before January 1, 1995 requesting a release from the provisions of Section 14.4 and this Section. Upon receipt of a request for release, the Department of Agriculture shall conduct a site visit to confirm the private potable use of the on-site well. If private potable use is confirmed, the Department shall provide written notice to the owner or operator of the agrichemical facility that the facility is released from compliance with the provisions of Section 14.4 and this Section. If private potable use is not confirmed, the Department of Agriculture shall provide written notice to the owner or operator that a release cannot be given. No action in this subsection shall be precluded by the on-site non-potable use of water from an on-site private potable water supply well.
(Source: P.A. 92-113, eff. 7-20-01; 92-574, eff. 6-26-02.)

415 ILCS 5/14.7

    (415 ILCS 5/14.7)
    Sec. 14.7. Preservation of community water supplies.
    (a) The Agency shall adopt rules governing certain corrosion prevention projects carried out on community water supplies. Those rules shall not apply to buried pipelines including, but not limited to, pipes, mains, and joints. The rules shall exclude routine maintenance activities of community water supplies including, but not limited to, the use of protective coatings applied by the owner's utility personnel during the course of performing routine maintenance activities. Routine maintenance activities shall include, but not be limited to, the painting of fire hydrants; routine over-coat painting of interior and exterior building surfaces such as floors, doors, windows, and ceilings; and routine touch-up and over-coat application of protective coatings typically found on water utility pumps, pipes, tanks, and other water treatment plant appurtenances and utility owned structures. Those rules shall include:
        (1) standards for ensuring that community water
    
supplies carry out corrosion prevention and mitigation methods according to corrosion prevention industry standards adopted by the Agency;
        (2) requirements that community water supplies use:
            (A) protective coatings personnel to carry out
        
corrosion prevention and mitigation methods on exposed water treatment tanks, exposed non-concrete water treatment structures, exposed water treatment pipe galleys; exposed pumps; and generators; the Agency shall not limit to protective coatings personnel any other work relating to prevention and mitigation methods on any other water treatment appurtenances where protective coatings are utilized for corrosion control and prevention to prolong the life of the water utility asset; and
            (B) inspectors to ensure that best practices and
        
standards are adhered to on each corrosion prevention project; and
        (3) standards to prevent environmental degradation
    
that might occur as a result of carrying out corrosion prevention and mitigation methods including, but not limited to, standards to prevent the improper handling and containment of hazardous materials, especially lead paint, removed from the exterior of a community water supply.
    In adopting rules under this subsection (a), the Agency shall obtain input from corrosion industry experts specializing in the training of personnel to carry out corrosion prevention and mitigation methods.
    (b) As used in this Section:
    "Community water supply" has the meaning ascribed to that term in Section 3.145 of this Act.
    "Corrosion" means a naturally occurring phenomenon commonly defined as the deterioration of a metal that results from a chemical or electrochemical reaction with its environment.
    "Corrosion prevention and mitigation methods" means the preparation, application, installation, removal, or general maintenance as necessary of a protective coating system, including any or more of the following:
            (A) surface preparation and coating application
        
on the exterior or interior of a community water supply; or
            (B) shop painting of structural steel fabricated
        
for installation as part of a community water supply.
    "Corrosion prevention project" means carrying out corrosion prevention and mitigation methods. "Corrosion prevention project" does not include clean-up related to surface preparation.
    "Protective coatings personnel" means personnel employed or retained by a contractor providing services covered by this Section to carry out corrosion prevention or mitigation methods or inspections.
    (c) (Blank).
    (d) Each contract procured pursuant to the Illinois Procurement Code for the provision of services covered by this Section (1) shall comply with applicable provisions of the Illinois Procurement Code and (2) shall include provisions for reporting participation by minority persons, as defined by Section 2 of the Business Enterprise for Minorities, Women, and Persons with Disabilities Act; women, as defined by Section 2 of the Business Enterprise for Minorities, Women, and Persons with Disabilities Act; and veterans, as defined by Section 45-57 of the Illinois Procurement Code, in apprenticeship and training programs in which the contractor or his or her subcontractors participate. The requirements of this Section do not apply to an individual licensed under the Professional Engineering Practice Act of 1989 or the Structural Engineering Act of 1989.
(Source: P.A. 100-391, eff. 8-25-17; 101-226, eff. 6-1-20.)

415 ILCS 5/15

    (415 ILCS 5/15) (from Ch. 111 1/2, par. 1015)
    Sec. 15. Plans and specifications; demonstration of capability; record retention.
    (a) Owners of public water supplies, their authorized representative, or legal custodians, shall submit plans and specifications to the Agency and obtain written approval before construction of any proposed public water supply installations, changes, or additions is started. Plans and specifications shall be complete and of sufficient detail to show all proposed construction, changes, or additions that may affect sanitary quality, mineral quality, or adequacy of the public water supply; and, where necessary, said plans and specifications shall be accompanied by supplemental data as may be required by the Agency to permit a complete review thereof.
    (b) All new public water supplies established after October 1, 1999 shall demonstrate technical, financial, and managerial capacity as a condition for issuance of a construction or operation permit by the Agency or its designee. The demonstration shall be consistent with the technical, financial, and managerial provisions of the federal Safe Drinking Water Act (P.L. 93-523), as now or hereafter amended. The Agency is authorized to adopt rules in accordance with the Illinois Administrative Procedure Act to implement the purposes of this subsection. Such rules must take into account the need for the facility, facility size, sophistication of treatment of the water supply, and financial requirements needed for operation of the facility.
    (c) Except as otherwise provided under Board rules, owners and operators of community water systems must maintain all records, reports, and other documents related to the operation of the community water system for a minimum of 10 years. Documents required to be maintained under this subsection (c) include, but are not limited to, all billing records and other documents related to the purchase of water from other community water systems. Documents required to be maintained under this subsection (c) must be maintained on the premises of the community water system, or at a convenient location near its premises, and must be made available to the Agency for inspection and copying during normal business hours.
(Source: P.A. 96-603, eff. 8-24-09.)