Illinois General Assembly

  Bills & Resolutions  
  Compiled Statutes  
  Public Acts  
  Legislative Reports  
  IL Constitution  
  Legislative Guide  
  Legislative Glossary  

 Search By Number
 (example: HB0001)
Search Tips

Search By Keyword

Illinois Compiled Statutes

Information maintained by the Legislative Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.

Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.

UTILITIES
(220 ILCS 5/) Public Utilities Act.

220 ILCS 5/16-111.3

    (220 ILCS 5/16-111.3)
    Sec. 16-111.3. Transition period earnings calculations. At such time as the Board of Governors of the Federal Reserve System ceases to include the monthly average yields of 30-year U.S. Treasury bonds in its weekly H.15 Statistical Release or successor publication, the Monthly Treasury Long-Term Average Rates (25 years and above) published by the Board of Governors of the Federal Reserve System in its weekly H.15 Statistical Release or successor publication shall instead be used to establish a rate for the purpose of calculating the Index defined in subsection (e) of Section 16-111 of this Act, and at such time, such Monthly Treasury Long-Term Average Rates (25 years and above) shall also be used in place of the monthly average yields of 30-year U.S. Treasury bonds in the rate of return calculation required by subsection (d) of Section 16-111. An electric utility shall also remove the effects, if any, of any impairment due to the application of Statement of Financial Accounting Standards No. 142, which was issued in June 2001, when making the calculations required by this Section or by subsections (d) and (e) of Section 16-111.
(Source: P.A. 92-537, eff. 6-6-02.)

220 ILCS 5/16-111.5

    (220 ILCS 5/16-111.5)
    Sec. 16-111.5. Provisions relating to procurement.
    (a) An electric utility that on December 31, 2005 served at least 100,000 customers in Illinois shall procure power and energy for its eligible retail customers in accordance with the applicable provisions set forth in Section 1-75 of the Illinois Power Agency Act and this Section. Beginning with the delivery year commencing on June 1, 2017, such electric utility shall also procure zero emission credits from zero emission facilities in accordance with the applicable provisions set forth in Section 1-75 of the Illinois Power Agency Act, and, for years beginning on or after June 1, 2017, the utility shall procure renewable energy resources in accordance with the applicable provisions set forth in Section 1-75 of the Illinois Power Agency Act and this Section. Beginning with the delivery year commencing on June 1, 2022, an electric utility serving over 3,000,000 customers shall also procure carbon mitigation credits from carbon-free energy resources in accordance with the applicable provisions set forth in Section 1-75 of the Illinois Power Agency Act and this Section. A small multi-jurisdictional electric utility that on December 31, 2005 served less than 100,000 customers in Illinois may elect to procure power and energy for all or a portion of its eligible Illinois retail customers in accordance with the applicable provisions set forth in this Section and Section 1-75 of the Illinois Power Agency Act. This Section shall not apply to a small multi-jurisdictional utility until such time as a small multi-jurisdictional utility requests the Illinois Power Agency to prepare a procurement plan for its eligible retail customers. "Eligible retail customers" for the purposes of this Section means those retail customers that purchase power and energy from the electric utility under fixed-price bundled service tariffs, other than those retail customers whose service is declared or deemed competitive under Section 16-113 and those other customer groups specified in this Section, including self-generating customers, customers electing hourly pricing, or those customers who are otherwise ineligible for fixed-price bundled tariff service. For those customers that are excluded from the procurement plan's electric supply service requirements, and the utility shall procure any supply requirements, including capacity, ancillary services, and hourly priced energy, in the applicable markets as needed to serve those customers, provided that the utility may include in its procurement plan load requirements for the load that is associated with those retail customers whose service has been declared or deemed competitive pursuant to Section 16-113 of this Act to the extent that those customers are purchasing power and energy during one of the transition periods identified in subsection (b) of Section 16-113 of this Act.
    (b) A procurement plan shall be prepared for each electric utility consistent with the applicable requirements of the Illinois Power Agency Act and this Section. For purposes of this Section, Illinois electric utilities that are affiliated by virtue of a common parent company are considered to be a single electric utility. Small multi-jurisdictional utilities may request a procurement plan for a portion of or all of its Illinois load. Each procurement plan shall analyze the projected balance of supply and demand for those retail customers to be included in the plan's electric supply service requirements over a 5-year period, with the first planning year beginning on June 1 of the year following the year in which the plan is filed. The plan shall specifically identify the wholesale products to be procured following plan approval, and shall follow all the requirements set forth in the Public Utilities Act and all applicable State and federal laws, statutes, rules, or regulations, as well as Commission orders. Nothing in this Section precludes consideration of contracts longer than 5 years and related forecast data. Unless specified otherwise in this Section, in the procurement plan or in the implementing tariff, any procurement occurring in accordance with this plan shall be competitively bid through a request for proposals process. Approval and implementation of the procurement plan shall be subject to review and approval by the Commission according to the provisions set forth in this Section. A procurement plan shall include each of the following components:
        (1) Hourly load analysis. This analysis shall
    
include:
            (i) multi-year historical analysis of hourly
        
loads;
            (ii) switching trends and competitive retail
        
market analysis;
            (iii) known or projected changes to future loads;
        
and
            (iv) growth forecasts by customer class.
        (2) Analysis of the impact of any demand side and
    
renewable energy initiatives. This analysis shall include:
            (i) the impact of demand response programs and
        
energy efficiency programs, both current and projected; for small multi-jurisdictional utilities, the impact of demand response and energy efficiency programs approved pursuant to Section 8-408 of this Act, both current and projected; and
            (ii) supply side needs that are projected to be
        
offset by purchases of renewable energy resources, if any.
        (3) A plan for meeting the expected load requirements
    
that will not be met through preexisting contracts. This plan shall include:
            (i) definitions of the different Illinois retail
        
customer classes for which supply is being purchased;
            (ii) the proposed mix of demand-response products
        
for which contracts will be executed during the next year. For small multi-jurisdictional electric utilities that on December 31, 2005 served fewer than 100,000 customers in Illinois, these shall be defined as demand-response products offered in an energy efficiency plan approved pursuant to Section 8-408 of this Act. The cost-effective demand-response measures shall be procured whenever the cost is lower than procuring comparable capacity products, provided that such products shall:
                (A) be procured by a demand-response provider
            
from those retail customers included in the plan's electric supply service requirements;
                (B) at least satisfy the demand-response
            
requirements of the regional transmission organization market in which the utility's service territory is located, including, but not limited to, any applicable capacity or dispatch requirements;
                (C) provide for customers' participation in
            
the stream of benefits produced by the demand-response products;
                (D) provide for reimbursement by the
            
demand-response provider of the utility for any costs incurred as a result of the failure of the supplier of such products to perform its obligations thereunder; and
                (E) meet the same credit requirements as
            
apply to suppliers of capacity, in the applicable regional transmission organization market;
            (iii) monthly forecasted system supply
        
requirements, including expected minimum, maximum, and average values for the planning period;
            (iv) the proposed mix and selection of standard
        
wholesale products for which contracts will be executed during the next year, separately or in combination, to meet that portion of its load requirements not met through pre-existing contracts, including but not limited to monthly 5 x 16 peak period block energy, monthly off-peak wrap energy, monthly 7 x 24 energy, annual 5 x 16 energy, other standardized energy or capacity products designed to provide eligible retail customer benefits from commercially deployed advanced technologies including but not limited to high voltage direct current converter stations, as such term is defined in Section 1-10 of the Illinois Power Agency Act, whether or not such product is currently available in wholesale markets, annual off-peak wrap energy, annual 7 x 24 energy, monthly capacity, annual capacity, peak load capacity obligations, capacity purchase plan, and ancillary services;
            (v) proposed term structures for each wholesale
        
product type included in the proposed procurement plan portfolio of products; and
            (vi) an assessment of the price risk, load
        
uncertainty, and other factors that are associated with the proposed procurement plan; this assessment, to the extent possible, shall include an analysis of the following factors: contract terms, time frames for securing products or services, fuel costs, weather patterns, transmission costs, market conditions, and the governmental regulatory environment; the proposed procurement plan shall also identify alternatives for those portfolio measures that are identified as having significant price risk and mitigation in the form of additional retail customer and ratepayer price, reliability, and environmental benefits from standardized energy products delivered from commercially deployed advanced technologies, including, but not limited to, high voltage direct current converter stations, as such term is defined in Section 1-10 of the Illinois Power Agency Act, whether or not such product is currently available in wholesale markets.
        (4) Proposed procedures for balancing loads. The
    
procurement plan shall include, for load requirements included in the procurement plan, the process for (i) hourly balancing of supply and demand and (ii) the criteria for portfolio re-balancing in the event of significant shifts in load.
        (5) Long-Term Renewable Resources Procurement
    
Plan. The Agency shall prepare a long-term renewable resources procurement plan for the procurement of renewable energy credits under Sections 1-56 and 1-75 of the Illinois Power Agency Act for delivery beginning in the 2017 delivery year.
            (i) The initial long-term renewable
        
resources procurement plan and all subsequent revisions shall be subject to review and approval by the Commission. For the purposes of this Section, "delivery year" has the same meaning as in Section 1-10 of the Illinois Power Agency Act. For purposes of this Section, "Agency" shall mean the Illinois Power Agency.
            (ii) The long-term renewable resources
        
planning process shall be conducted as follows:
                (A) Electric utilities shall provide a
            
range of load forecasts to the Illinois Power Agency within 45 days of the Agency's request for forecasts, which request shall specify the length and conditions for the forecasts including, but not limited to, the quantity of distributed generation expected to be interconnected for each year.
                (B) The Agency shall publish for comment
            
the initial long-term renewable resources procurement plan no later than 120 days after the effective date of this amendatory Act of the 99th General Assembly and shall review, and may revise, the plan at least every 2 years thereafter. To the extent practicable, the Agency shall review and propose any revisions to the long-term renewable energy resources procurement plan in conjunction with the Agency's other planning and approval processes conducted under this Section. The initial long-term renewable resources procurement plan shall:
                    (aa) Identify the procurement
                
programs and competitive procurement events consistent with the applicable requirements of the Illinois Power Agency Act and shall be designed to achieve the goals set forth in subsection (c) of Section 1-75 of that Act.
                    (bb) Include a schedule for
                
procurements for renewable energy credits from utility-scale wind projects, utility-scale solar projects, and brownfield site photovoltaic projects consistent with subparagraph (G) of paragraph (1) of subsection (c) of Section 1-75 of the Illinois Power Agency Act.
                    (cc) Identify the process whereby
                
the Agency will submit to the Commission for review and approval the proposed contracts to implement the programs required by such plan.
                Copies of the initial long-term renewable
            
resources procurement plan and all subsequent revisions shall be posted and made publicly available on the Agency's and Commission's websites, and copies shall also be provided to each affected electric utility. An affected utility and other interested parties shall have 45 days following the date of posting to provide comment to the Agency on the initial long-term renewable resources procurement plan and all subsequent revisions. All comments submitted to the Agency shall be specific, supported by data or other detailed analyses, and, if objecting to all or a portion of the procurement plan, accompanied by specific alternative wording or proposals. All comments shall be posted on the Agency's and Commission's websites. During this 45-day comment period, the Agency shall hold at least one public hearing within each utility's service area that is subject to the requirements of this paragraph (5) for the purpose of receiving public comment. Within 21 days following the end of the 45-day review period, the Agency may revise the long-term renewable resources procurement plan based on the comments received and shall file the plan with the Commission for review and approval.
                (C) Within 14 days after the filing of the
            
initial long-term renewable resources procurement plan or any subsequent revisions, any person objecting to the plan may file an objection with the Commission. Within 21 days after the filing of the plan, the Commission shall determine whether a hearing is necessary. The Commission shall enter its order confirming or modifying the initial long-term renewable resources procurement plan or any subsequent revisions within 120 days after the filing of the plan by the Illinois Power Agency.
                (D) The Commission shall approve the
            
initial long-term renewable resources procurement plan and any subsequent revisions, including expressly the forecast used in the plan and taking into account that funding will be limited to the amount of revenues actually collected by the utilities, if the Commission determines that the plan will reasonably and prudently accomplish the requirements of Section 1-56 and subsection (c) of Section 1-75 of the Illinois Power Agency Act. The Commission shall also approve the process for the submission, review, and approval of the proposed contracts to procure renewable energy credits or implement the programs authorized by the Commission pursuant to a long-term renewable resources procurement plan approved under this Section.
                In approving any long-term renewable
            
resources procurement plan after the effective date of this amendatory Act of the 102nd General Assembly, the Commission shall approve or modify the Agency's proposal for minimum equity standards pursuant to subsection (c-10) of Section 1-75 of the Illinois Power Agency Act. The Commission shall consider any analysis performed by the Agency in developing its proposal, including past performance, availability of equity eligible contractors, and availability of equity eligible persons at the time the long-term renewable resources procurement plan is approved.
            (iii) The Agency or third parties contracted
        
by the Agency shall implement all programs authorized by the Commission in an approved long-term renewable resources procurement plan without further review and approval by the Commission. Third parties shall not begin implementing any programs or receive any payment under this Section until the Commission has approved the contract or contracts under the process authorized by the Commission in item (D) of subparagraph (ii) of paragraph (5) of this subsection (b) and the third party and the Agency or utility, as applicable, have executed the contract. For those renewable energy credits subject to procurement through a competitive bid process under the plan or under the initial forward procurements for wind and solar resources described in subparagraph (G) of paragraph (1) of subsection (c) of Section 1-75 of the Illinois Power Agency Act, the Agency shall follow the procurement process specified in the provisions relating to electricity procurement in subsections (e) through (i) of this Section.
            (iv) An electric utility shall recover its
        
costs associated with the procurement of renewable energy credits under this Section and pursuant to subsection (c-5) of Section 1-75 of the Illinois Power Agency Act through an automatic adjustment clause tariff under subsection (k) or a tariff pursuant to subsection (i-5), as applicable, of Section 16-108 of this Act. A utility shall not be required to advance any payment or pay any amounts under this Section that exceed the actual amount of revenues collected by the utility under paragraph (6) of subsection (c) of Section 1-75 of the Illinois Power Agency Act, subsection (c-5) of Section 1-75 of the Illinois Power Agency Act, and subsection (k) or subsection (i-5), as applicable, of Section 16-108 of this Act, and contracts executed under this Section shall expressly incorporate this limitation.
            (v) For the public interest, safety, and
        
welfare, the Agency and the Commission may adopt rules to carry out the provisions of this Section on an emergency basis immediately following the effective date of this amendatory Act of the 99th General Assembly.
            (vi) On or before July 1 of each year, the
        
Commission shall hold an informal hearing for the purpose of receiving comments on the prior year's procurement process and any recommendations for change.
    (b-5) An electric utility that as of January 1, 2019 served more than 300,000 retail customers in this State shall purchase renewable energy credits from new renewable energy facilities constructed at or adjacent to the sites of coal-fueled electric generating facilities in this State in accordance with subsection (c-5) of Section 1-75 of the Illinois Power Agency Act. Except as expressly provided in this Section, the plans and procedures for such procurements shall not be included in the procurement plans provided for in this Section, but rather shall be conducted and implemented solely in accordance with subsection (c-5) of Section 1-75 of the Illinois Power Agency Act.
    (c) The provisions of this subsection (c) shall not apply to procurements conducted pursuant to subsection (c-5) of Section 1-75 of the Illinois Power Agency Act. However, the Agency may retain a procurement administrator to assist the Agency in planning and carrying out the procurement events and implementing the other requirements specified in such subsection (c-5) of Section 1-75 of the Illinois Power Agency Act, with the costs incurred by the Agency for the procurement administrator to be recovered through fees charged to applicants for selection to sell and deliver renewable energy credits to electric utilities pursuant to subsection (c-5) of Section 1-75 of the Illinois Power Agency Act. The procurement process set forth in Section 1-75 of the Illinois Power Agency Act and subsection (e) of this Section shall be administered by a procurement administrator and monitored by a procurement monitor.
        (1) The procurement administrator shall:
            (i) design the final procurement process in
        
accordance with Section 1-75 of the Illinois Power Agency Act and subsection (e) of this Section following Commission approval of the procurement plan;
            (ii) develop benchmarks in accordance with
        
subsection (e)(3) to be used to evaluate bids; these benchmarks shall be submitted to the Commission for review and approval on a confidential basis prior to the procurement event;
            (iii) serve as the interface between the electric
        
utility and suppliers;
            (iv) manage the bidder pre-qualification and
        
registration process;
            (v) obtain the electric utilities' agreement to
        
the final form of all supply contracts and credit collateral agreements;
            (vi) administer the request for proposals process;
            (vii) have the discretion to negotiate to
        
determine whether bidders are willing to lower the price of bids that meet the benchmarks approved by the Commission; any post-bid negotiations with bidders shall be limited to price only and shall be completed within 24 hours after opening the sealed bids and shall be conducted in a fair and unbiased manner; in conducting the negotiations, there shall be no disclosure of any information derived from proposals submitted by competing bidders; if information is disclosed to any bidder, it shall be provided to all competing bidders;
            (viii) maintain confidentiality of supplier and
        
bidding information in a manner consistent with all applicable laws, rules, regulations, and tariffs;
            (ix) submit a confidential report to the
        
Commission recommending acceptance or rejection of bids;
            (x) notify the utility of contract counterparties
        
and contract specifics; and
            (xi) administer related contingency procurement
        
events.
        (2) The procurement monitor, who shall be retained by
    
the Commission, shall:
            (i) monitor interactions among the procurement
        
administrator, suppliers, and utility;
            (ii) monitor and report to the Commission on the
        
progress of the procurement process;
            (iii) provide an independent confidential report
        
to the Commission regarding the results of the procurement event;
            (iv) assess compliance with the procurement plans
        
approved by the Commission for each utility that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois and for each small multi-jurisdictional utility that on December 31, 2005 served less than 100,000 customers in Illinois;
            (v) preserve the confidentiality of supplier and
        
bidding information in a manner consistent with all applicable laws, rules, regulations, and tariffs;
            (vi) provide expert advice to the Commission and
        
consult with the procurement administrator regarding issues related to procurement process design, rules, protocols, and policy-related matters; and
            (vii) consult with the procurement administrator
        
regarding the development and use of benchmark criteria, standard form contracts, credit policies, and bid documents.
    (d) Except as provided in subsection (j), the planning process shall be conducted as follows:
        (1) Beginning in 2008, each Illinois utility
    
procuring power pursuant to this Section shall annually provide a range of load forecasts to the Illinois Power Agency by July 15 of each year, or such other date as may be required by the Commission or Agency. The load forecasts shall cover the 5-year procurement planning period for the next procurement plan and shall include hourly data representing a high-load, low-load, and expected-load scenario for the load of those retail customers included in the plan's electric supply service requirements. The utility shall provide supporting data and assumptions for each of the scenarios.
        (2) Beginning in 2008, the Illinois Power Agency
    
shall prepare a procurement plan by August 15th of each year, or such other date as may be required by the Commission. The procurement plan shall identify the portfolio of demand-response and power and energy products to be procured. Cost-effective demand-response measures shall be procured as set forth in item (iii) of subsection (b) of this Section. Copies of the procurement plan shall be posted and made publicly available on the Agency's and Commission's websites, and copies shall also be provided to each affected electric utility. An affected utility shall have 30 days following the date of posting to provide comment to the Agency on the procurement plan. Other interested entities also may comment on the procurement plan. All comments submitted to the Agency shall be specific, supported by data or other detailed analyses, and, if objecting to all or a portion of the procurement plan, accompanied by specific alternative wording or proposals. All comments shall be posted on the Agency's and Commission's websites. During this 30-day comment period, the Agency shall hold at least one public hearing within each utility's service area for the purpose of receiving public comment on the procurement plan. Within 14 days following the end of the 30-day review period, the Agency shall revise the procurement plan as necessary based on the comments received and file the procurement plan with the Commission and post the procurement plan on the websites.
        (3) Within 5 days after the filing of the procurement
    
plan, any person objecting to the procurement plan shall file an objection with the Commission. Within 10 days after the filing, the Commission shall determine whether a hearing is necessary. The Commission shall enter its order confirming or modifying the procurement plan within 90 days after the filing of the procurement plan by the Illinois Power Agency.
        (4) The Commission shall approve the procurement
    
plan, including expressly the forecast used in the procurement plan, if the Commission determines that it will ensure adequate, reliable, affordable, efficient, and environmentally sustainable electric service at the lowest total cost over time, taking into account any benefits of price stability.
        (4.5) The Commission shall review the Agency's
    
recommendations for the selection of applicants to enter into long-term contracts for the sale and delivery of renewable energy credits from new renewable energy facilities to be constructed at or adjacent to the sites of coal-fueled electric generating facilities in this State in accordance with the provisions of subsection (c-5) of Section 1-75 of the Illinois Power Agency Act, and shall approve the Agency's recommendations if the Commission determines that the applicants recommended by the Agency for selection, the proposed new renewable energy facilities to be constructed, the amounts of renewable energy credits to be delivered pursuant to the contracts, and the other terms of the contracts, are consistent with the requirements of subsection (c-5) of Section 1-75 of the Illinois Power Agency Act.
    (e) The procurement process shall include each of the following components:
        (1) Solicitation, pre-qualification, and registration
    
of bidders. The procurement administrator shall disseminate information to potential bidders to promote a procurement event, notify potential bidders that the procurement administrator may enter into a post-bid price negotiation with bidders that meet the applicable benchmarks, provide supply requirements, and otherwise explain the competitive procurement process. In addition to such other publication as the procurement administrator determines is appropriate, this information shall be posted on the Illinois Power Agency's and the Commission's websites. The procurement administrator shall also administer the prequalification process, including evaluation of credit worthiness, compliance with procurement rules, and agreement to the standard form contract developed pursuant to paragraph (2) of this subsection (e). The procurement administrator shall then identify and register bidders to participate in the procurement event.
        (2) Standard contract forms and credit terms and
    
instruments. The procurement administrator, in consultation with the utilities, the Commission, and other interested parties and subject to Commission oversight, shall develop and provide standard contract forms for the supplier contracts that meet generally accepted industry practices. Standard credit terms and instruments that meet generally accepted industry practices shall be similarly developed. The procurement administrator shall make available to the Commission all written comments it receives on the contract forms, credit terms, or instruments. If the procurement administrator cannot reach agreement with the applicable electric utility as to the contract terms and conditions, the procurement administrator must notify the Commission of any disputed terms and the Commission shall resolve the dispute. The terms of the contracts shall not be subject to negotiation by winning bidders, and the bidders must agree to the terms of the contract in advance so that winning bids are selected solely on the basis of price.
        (3) Establishment of a market-based price benchmark.
    
As part of the development of the procurement process, the procurement administrator, in consultation with the Commission staff, Agency staff, and the procurement monitor, shall establish benchmarks for evaluating the final prices in the contracts for each of the products that will be procured through the procurement process. The benchmarks shall be based on price data for similar products for the same delivery period and same delivery hub, or other delivery hubs after adjusting for that difference. The price benchmarks may also be adjusted to take into account differences between the information reflected in the underlying data sources and the specific products and procurement process being used to procure power for the Illinois utilities. The benchmarks shall be confidential but shall be provided to, and will be subject to Commission review and approval, prior to a procurement event.
        (4) Request for proposals competitive procurement
    
process. The procurement administrator shall design and issue a request for proposals to supply electricity in accordance with each utility's procurement plan, as approved by the Commission. The request for proposals shall set forth a procedure for sealed, binding commitment bidding with pay-as-bid settlement, and provision for selection of bids on the basis of price.
        (5) A plan for implementing contingencies in the
    
event of supplier default or failure of the procurement process to fully meet the expected load requirement due to insufficient supplier participation, Commission rejection of results, or any other cause.
            (i) Event of supplier default: In the event of
        
supplier default, the utility shall review the contract of the defaulting supplier to determine if the amount of supply is 200 megawatts or greater, and if there are more than 60 days remaining of the contract term. If both of these conditions are met, and the default results in termination of the contract, the utility shall immediately notify the Illinois Power Agency that a request for proposals must be issued to procure replacement power, and the procurement administrator shall run an additional procurement event. If the contracted supply of the defaulting supplier is less than 200 megawatts or there are less than 60 days remaining of the contract term, the utility shall procure power and energy from the applicable regional transmission organization market, including ancillary services, capacity, and day-ahead or real time energy, or both, for the duration of the contract term to replace the contracted supply; provided, however, that if a needed product is not available through the regional transmission organization market it shall be purchased from the wholesale market.
            (ii) Failure of the procurement process to fully
        
meet the expected load requirement: If the procurement process fails to fully meet the expected load requirement due to insufficient supplier participation or due to a Commission rejection of the procurement results, the procurement administrator, the procurement monitor, and the Commission staff shall meet within 10 days to analyze potential causes of low supplier interest or causes for the Commission decision. If changes are identified that would likely result in increased supplier participation, or that would address concerns causing the Commission to reject the results of the prior procurement event, the procurement administrator may implement those changes and rerun the request for proposals process according to a schedule determined by those parties and consistent with Section 1-75 of the Illinois Power Agency Act and this subsection. In any event, a new request for proposals process shall be implemented by the procurement administrator within 90 days after the determination that the procurement process has failed to fully meet the expected load requirement.
            (iii) In all cases where there is insufficient
        
supply provided under contracts awarded through the procurement process to fully meet the electric utility's load requirement, the utility shall meet the load requirement by procuring power and energy from the applicable regional transmission organization market, including ancillary services, capacity, and day-ahead or real time energy, or both; provided, however, that if a needed product is not available through the regional transmission organization market it shall be purchased from the wholesale market.
        (6) The procurement processes described in this
    
subsection and in subsection (c-5) of Section 1-75 of the Illinois Power Agency Act are exempt from the requirements of the Illinois Procurement Code, pursuant to Section 20-10 of that Code.
    (f) Within 2 business days after opening the sealed bids, the procurement administrator shall submit a confidential report to the Commission. The report shall contain the results of the bidding for each of the products along with the procurement administrator's recommendation for the acceptance and rejection of bids based on the price benchmark criteria and other factors observed in the process. The procurement monitor also shall submit a confidential report to the Commission within 2 business days after opening the sealed bids. The report shall contain the procurement monitor's assessment of bidder behavior in the process as well as an assessment of the procurement administrator's compliance with the procurement process and rules. The Commission shall review the confidential reports submitted by the procurement administrator and procurement monitor, and shall accept or reject the recommendations of the procurement administrator within 2 business days after receipt of the reports.
    (g) Within 3 business days after the Commission decision approving the results of a procurement event, the utility shall enter into binding contractual arrangements with the winning suppliers using the standard form contracts; except that the utility shall not be required either directly or indirectly to execute the contracts if a tariff that is consistent with subsection (l) of this Section has not been approved and placed into effect for that utility.
    (h) For the procurement of standard wholesale products, the names of the successful bidders and the load weighted average of the winning bid prices for each contract type and for each contract term shall be made available to the public at the time of Commission approval of a procurement event. For procurements conducted to meet the requirements of subsection (b) of Section 1-56 or subsection (c) of Section 1-75 of the Illinois Power Agency Act governed by the provisions of this Section, the address and nameplate capacity of the new renewable energy generating facility proposed by a winning bidder shall also be made available to the public at the time of Commission approval of a procurement event, along with the business address and contact information for any winning bidder. An estimate or approximation of the nameplate capacity of the new renewable energy generating facility may be disclosed if necessary to protect the confidentiality of individual bid prices.
    The Commission, the procurement monitor, the procurement administrator, the Illinois Power Agency, and all participants in the procurement process shall maintain the confidentiality of all other supplier and bidding information in a manner consistent with all applicable laws, rules, regulations, and tariffs. Confidential information, including the confidential reports submitted by the procurement administrator and procurement monitor pursuant to subsection (f) of this Section, shall not be made publicly available and shall not be discoverable by any party in any proceeding, absent a compelling demonstration of need, nor shall those reports be admissible in any proceeding other than one for law enforcement purposes.
    (i) Within 2 business days after a Commission decision approving the results of a procurement event or such other date as may be required by the Commission from time to time, the utility shall file for informational purposes with the Commission its actual or estimated retail supply charges, as applicable, by customer supply group reflecting the costs associated with the procurement and computed in accordance with the tariffs filed pursuant to subsection (l) of this Section and approved by the Commission.
    (j) Within 60 days following August 28, 2007 (the effective date of Public Act 95-481), each electric utility that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois shall prepare and file with the Commission an initial procurement plan, which shall conform in all material respects to the requirements of the procurement plan set forth in subsection (b); provided, however, that the Illinois Power Agency Act shall not apply to the initial procurement plan prepared pursuant to this subsection. The initial procurement plan shall identify the portfolio of power and energy products to be procured and delivered for the period June 2008 through May 2009, and shall identify the proposed procurement administrator, who shall have the same experience and expertise as is required of a procurement administrator hired pursuant to Section 1-75 of the Illinois Power Agency Act. Copies of the procurement plan shall be posted and made publicly available on the Commission's website. The initial procurement plan may include contracts for renewable resources that extend beyond May 2009.
        (i) Within 14 days following filing of the initial
    
procurement plan, any person may file a detailed objection with the Commission contesting the procurement plan submitted by the electric utility. All objections to the electric utility's plan shall be specific, supported by data or other detailed analyses. The electric utility may file a response to any objections to its procurement plan within 7 days after the date objections are due to be filed. Within 7 days after the date the utility's response is due, the Commission shall determine whether a hearing is necessary. If it determines that a hearing is necessary, it shall require the hearing to be completed and issue an order on the procurement plan within 60 days after the filing of the procurement plan by the electric utility.
        (ii) The order shall approve or modify the
    
procurement plan, approve an independent procurement administrator, and approve or modify the electric utility's tariffs that are proposed with the initial procurement plan. The Commission shall approve the procurement plan if the Commission determines that it will ensure adequate, reliable, affordable, efficient, and environmentally sustainable electric service at the lowest total cost over time, taking into account any benefits of price stability.
    (k) (Blank).
    (k-5) (Blank).
    (l) An electric utility shall recover its costs incurred under this Section and subsection (c-5) of Section 1-75 of the Illinois Power Agency Act, including, but not limited to, the costs of procuring power and energy demand-response resources under this Section and its costs for purchasing renewable energy credits pursuant to subsection (c-5) of Section 1-75 of the Illinois Power Agency Act. The utility shall file with the initial procurement plan its proposed tariffs through which its costs of procuring power that are incurred pursuant to a Commission-approved procurement plan and those other costs identified in this subsection (l), will be recovered. The tariffs shall include a formula rate or charge designed to pass through both the costs incurred by the utility in procuring a supply of electric power and energy for the applicable customer classes with no mark-up or return on the price paid by the utility for that supply, plus any just and reasonable costs that the utility incurs in arranging and providing for the supply of electric power and energy. The formula rate or charge shall also contain provisions that ensure that its application does not result in over or under recovery due to changes in customer usage and demand patterns, and that provide for the correction, on at least an annual basis, of any accounting errors that may occur. A utility shall recover through the tariff all reasonable costs incurred to implement or comply with any procurement plan that is developed and put into effect pursuant to Section 1-75 of the Illinois Power Agency Act and this Section, and for the procurement of renewable energy credits pursuant to subsection (c-5) of Section 1-75 of the Illinois Power Agency Act, including any fees assessed by the Illinois Power Agency, costs associated with load balancing, and contingency plan costs. The electric utility shall also recover its full costs of procuring electric supply for which it contracted before the effective date of this Section in conjunction with the provision of full requirements service under fixed-price bundled service tariffs subsequent to December 31, 2006. All such costs shall be deemed to have been prudently incurred. The pass-through tariffs that are filed and approved pursuant to this Section shall not be subject to review under, or in any way limited by, Section 16-111(i) of this Act. All of the costs incurred by the electric utility associated with the purchase of zero emission credits in accordance with subsection (d-5) of Section 1-75 of the Illinois Power Agency Act, all costs incurred by the electric utility associated with the purchase of carbon mitigation credits in accordance with subsection (d-10) of Section 1-75 of the Illinois Power Agency Act, and, beginning June 1, 2017, all of the costs incurred by the electric utility associated with the purchase of renewable energy resources in accordance with Sections 1-56 and 1-75 of the Illinois Power Agency Act, and all of the costs incurred by the electric utility in purchasing renewable energy credits in accordance with subsection (c-5) of Section 1-75 of the Illinois Power Agency Act, shall be recovered through the electric utility's tariffed charges applicable to all of its retail customers, as specified in subsection (k) or subsection (i-5), as applicable, of Section 16-108 of this Act, and shall not be recovered through the electric utility's tariffed charges for electric power and energy supply to its eligible retail customers.
    (m) The Commission has the authority to adopt rules to carry out the provisions of this Section. For the public interest, safety, and welfare, the Commission also has authority to adopt rules to carry out the provisions of this Section on an emergency basis immediately following August 28, 2007 (the effective date of Public Act 95-481).
    (n) Notwithstanding any other provision of this Act, any affiliated electric utilities that submit a single procurement plan covering their combined needs may procure for those combined needs in conjunction with that plan, and may enter jointly into power supply contracts, purchases, and other procurement arrangements, and allocate capacity and energy and cost responsibility therefor among themselves in proportion to their requirements.
    (o) On or before June 1 of each year, the Commission shall hold an informal hearing for the purpose of receiving comments on the prior year's procurement process and any recommendations for change.
    (p) An electric utility subject to this Section may propose to invest, lease, own, or operate an electric generation facility as part of its procurement plan, provided the utility demonstrates that such facility is the least-cost option to provide electric service to those retail customers included in the plan's electric supply service requirements. If the facility is shown to be the least-cost option and is included in a procurement plan prepared in accordance with Section 1-75 of the Illinois Power Agency Act and this Section, then the electric utility shall make a filing pursuant to Section 8-406 of this Act, and may request of the Commission any statutory relief required thereunder. If the Commission grants all of the necessary approvals for the proposed facility, such supply shall thereafter be considered as a pre-existing contract under subsection (b) of this Section. The Commission shall in any order approving a proposal under this subsection specify how the utility will recover the prudently incurred costs of investing in, leasing, owning, or operating such generation facility through just and reasonable rates charged to those retail customers included in the plan's electric supply service requirements. Cost recovery for facilities included in the utility's procurement plan pursuant to this subsection shall not be subject to review under or in any way limited by the provisions of Section 16-111(i) of this Act. Nothing in this Section is intended to prohibit a utility from filing for a fuel adjustment clause as is otherwise permitted under Section 9-220 of this Act.
    (q) If the Illinois Power Agency filed with the Commission, under Section 16-111.5 of this Act, its proposed procurement plan for the period commencing June 1, 2017, and the Commission has not yet entered its final order approving the plan on or before the effective date of this amendatory Act of the 99th General Assembly, then the Illinois Power Agency shall file a notice of withdrawal with the Commission, after the effective date of this amendatory Act of the 99th General Assembly, to withdraw the proposed procurement of renewable energy resources to be approved under the plan, other than the procurement of renewable energy credits from distributed renewable energy generation devices using funds previously collected from electric utilities' retail customers that take service pursuant to electric utilities' hourly pricing tariff or tariffs and, for an electric utility that serves less than 100,000 retail customers in the State, other than the procurement of renewable energy credits from distributed renewable energy generation devices. Upon receipt of the notice, the Commission shall enter an order that approves the withdrawal of the proposed procurement of renewable energy resources from the plan. The initially proposed procurement of renewable energy resources shall not be approved or be the subject of any further hearing, investigation, proceeding, or order of any kind.
    This amendatory Act of the 99th General Assembly preempts and supersedes any order entered by the Commission that approved the Illinois Power Agency's procurement plan for the period commencing June 1, 2017, to the extent it is inconsistent with the provisions of this amendatory Act of the 99th General Assembly. To the extent any previously entered order approved the procurement of renewable energy resources, the portion of that order approving the procurement shall be void, other than the procurement of renewable energy credits from distributed renewable energy generation devices using funds previously collected from electric utilities' retail customers that take service under electric utilities' hourly pricing tariff or tariffs and, for an electric utility that serves less than 100,000 retail customers in the State, other than the procurement of renewable energy credits for distributed renewable energy generation devices.
(Source: P.A. 102-662, eff. 9-15-21.)

220 ILCS 5/16-111.5A

    (220 ILCS 5/16-111.5A)
    Sec. 16-111.5A. Provisions relating to electric rate relief.
    (a) The General Assembly finds that action must be taken in order to mitigate the 2007 electric rate increases approved for residential and certain nonresidential customers served by the State's largest electric utilities in 2007. The General Assembly further finds that although various means of providing rate relief have been proposed, including imposition of a rate freeze on the electric utilities or a tax on generation within the State, the establishment of voluntary rate relief programs provides the most immediate and certain means of providing that rate relief. Accordingly, if the residential customer electric service rates that were charged to residential customers beginning January 2, 2007 by an electric utility that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois resulted in an annual increase of more than 20% in an electric utility's average rate charged to residential customers for bundled electric service, those electric utilities and their holding companies or other affiliates, and any other company owning generation in this State or its affiliates, may, notwithstanding any other provisions of this Act, and without obtaining any approvals from the Commission or any other agency, regardless of whether any such approval would otherwise be required, establish and make payments to provide funds that can be used to provide rate relief beginning on the effective date of this amendatory Act of the 95th General Assembly through July 31, 2011.
    (b) For purposes of this Section, the "Ameren Utilities" means Illinois Power Company, Central Illinois Public Service Company, and Central Illinois Light Company.
    (c) For purposes of this Section, the "Generators" means Exelon Generation Company, LLC; Ameren Energy Resources Generating Company; Ameren Energy Marketing Company; Ameren Energy Generating Company; MidAmerican Energy Company; Midwest Generation, LLC; and Dynegy Holdings Inc.; and may include non-utility affiliates of the entities named in this subsection.
    (d) For purposes of this Section, "Rate Relief Agreements" means the 2 Rate Relief Funding Agreements, the Escrow Funding Agreement, and the Illinois Power Agency Funding Agreement that Commonwealth Edison Company, the Ameren Utilities, and Generators have entered into with the Illinois Attorney General on behalf of the People of the State of Illinois for the purpose of providing $1,001,000,000 to be used to fund rate relief programs for customers of Commonwealth Edison Company and the Ameren Utilities and for the Illinois Power Agency Trust Fund and that become effective on the effective date of this amendatory Act of the 95th General Assembly. The Rate Relief Agreements have been filed with the Illinois Secretary of State Index Department and designated as "95-GA-C01" through "95-GA-C04" inclusive. The Illinois Attorney General has the right to enforce the provisions of all of the Rate Relief Agreements on behalf of the People of the State of Illinois or the Illinois Power Agency, or both, as appropriate.
    (e) Subject to the terms, conditions, and contingencies of the Rate Relief Agreements, Commonwealth Edison Company will apply a total of $488,000,000 in rate relief to residential and certain nonresidential customers from 2007 through 2010. Commonwealth Edison Company will apply bill credits for all of its residential customers in its service territory in the following amounts: $250,000,000 in 2007, $125,500,000 in 2008, and $36,000,000 in 2009. Any undisbursed rate relief funds shall be applied to the targeted programs. Commonwealth Edison Company will provide rate relief for residential and certain nonresidential customers through targeted programs in the following amounts: $33,000,000 in 2007, $18,000,000 in 2008, $15,500,000 in 2009, and $10,000,000 in 2010. Subject to the terms, conditions, and contingencies of the Rate Relief Agreements, the targeted programs for 2007 consist of the following, some of which are already underway and, in the aggregate, therefore total more than $33,000,000:
        (1) an electric space heating customer relief program
    
costing approximately $8,000,000 designed to lower the average percentage increase of residential electric space heating customers to rate increases similar to other residential customers;
        (2) a summer assistance program costing approximately
    
$10,300,000 for working families and low-income customers, including low-income seniors;
        (3) a residential rate relief program costing
    
approximately $5,500,000 for working families and low-income customers, including low-income seniors, with higher than average rate increases (over 30%);
        (4) a residential special hardship program costing
    
approximately $5,000,000 to address special circumstances and hardships;
        (5) a nonresidential special hardship program costing
    
approximately $1,500,000 to address special circumstances and hardships;
        (6) a relief program for the common area accounts of
    
apartment building owners and condominium associations costing approximately $4,500,000 designed to reduce rate increases for these customers to rate increases similar to those for residential customers and to mitigate the impact of their rate increase;
        (7) a weatherization assistance program for electric
    
space heating low-income customers costing approximately $3,900,000 designed to provide energy efficiency assistance; and
        (8) energy efficiency, environmental, education, and
    
assistance programs costing approximately $5,000,000 designed to promote the use of energy efficiency programs and services by residential customers, maintenance and upgrades of a website that allows those customers to analyze their energy usage and provides incentives for the purchase of energy efficient products, the provision of energy efficient light bulbs to residential customers at a discount, and free efficient light bulbs and other assistance to low-income customers.
    Based on the outcome of these targeted programs, Commonwealth Edison Company will design and implement, subject to the terms, conditions, and contingencies of the Rate Relief Agreements, targeted programs for working families, seniors, and other customers in need in 2008, 2009, and 2010.
    (f) Subject to the terms, conditions, and contingencies of the Rate Relief Agreements, the Ameren Utilities will apply a total of $488,000,000 in rate relief to residential and certain nonresidential customers from 2007 through 2010. The Ameren Utilities will apply bill credits for all of their residential customers in their service territories in the following aggregate amounts: $213,000,000 in 2007, $109,000,000 in 2008, and $78,000,000 in 2009. The Ameren Utilities will apply bill credits to certain nonresidential customers in the following aggregate amounts: $26,000,000 in 2007, $11,000,000 in 2008, and $11,000,000 in 2009. Any undisbursed rate relief funds shall be applied to the targeted programs. The Ameren Utilities will provide rate relief for residential and certain nonresidential customers through targeted programs in the following amounts: $13,500,000 in 2007, $13,500,000 in 2008, $7,500,000 in 2009, and $5,500,000 in 2010. Subject to the terms, conditions and contingencies of the Rate Relief Agreements, the targeted programs consist of the following for 2007:
        (1) a cooling assistance program costing
    
approximately $2,000,000 to provide donations to the Low Income Home Energy Assistance Program;
        (2) a bill payment assistance program costing
    
approximately $2,000,000 for working families and low-income customers, including low-income seniors;
        (3) a residential special hardship program costing
    
approximately $2,000,000 to address special circumstances and hardships;
        (4) a nonresidential special hardship program costing
    
approximately $2,000,000 to address special circumstances and hardships;
        (5) a percent-of-income payment program pilot costing
    
approximately $2,500,000 that will be designed to determine for low-income electric space heating customers if paying a percentage of income for their electricity will make electricity more affordable and promote regular paying habits;
        (6) a weatherization assistance program for all
    
electric space heating low-income customers costing approximately $1,000,000 designed to provide energy efficiency assistance;
        (7) a compact fluorescent light bulb distribution
    
program costing approximately $1,000,000 designed to provide energy efficient light bulbs to residential customers at a discount; and
        (8) a municipal street lighting conversion program
    
costing approximately $1,000,000 to convert existing street lights to more efficient lights at a discount.
    Based on the outcome of these targeted programs, the Ameren Utilities will design and implement, subject to the terms, conditions, and contingencies of the Rate Relief Agreements, targeted programs for working families, seniors, and other customers in need in 2008, 2009, and 2010.
    In addition, the Ameren Utilities voluntarily agree to waive outstanding late payment charges associated with unpaid electric bills for usage on and after January 2, 2007, through the September 2007 billing period.
    (g) Programs that use funds that are provided by electric utilities and their holding companies or other affiliates, and any other company owning generation in this State or its affiliates, to reduce utility bills, or to otherwise offset costs incurred by the utilities in mitigating rate increases for certain customer groups, may be implemented through tariffs that are filed with and reviewed by the Commission. If a utility elects to file tariffs with the Commission to implement all or a portion of the programs, those tariffs shall, regardless of the date actually filed, be deemed accepted and approved, and shall become effective, on the effective date of this amendatory Act of the 95th General Assembly. The electric utilities whose customers benefit from the funds that are disbursed as contemplated in this Section shall file annual reports documenting the disbursement of those funds with the Commission and the Illinois Attorney General. The Commission has the authority to audit disbursement of the funds to ensure they were disbursed consistently with this Section.
    (h) Nothing in this Section shall be interpreted to limit the Commission's general authority over ratemaking.
    (i) Subject to the terms, conditions, and contingencies of the Rate Relief Agreements, the Generators are providing a total of $25,000,000 to the Illinois Power Agency Trust Fund.
    (j) None of the contributions by Commonwealth Edison Company or the Ameren Utilities pursuant to this Section may be recovered in rates.
    (k) Nothing in this Section shall be interpreted to limit the authority or right of the Illinois Attorney General, under the terms of the Rate Relief Agreements, to review or audit documents, make demands, or file suit or to take other action to enforce the provisions of the Rate Relief Agreements.
(Source: P.A. 95-481, eff. 8-28-07.)

220 ILCS 5/16-111.5B

    (220 ILCS 5/16-111.5B)
    Sec. 16-111.5B. Provisions relating to energy efficiency procurement.
    (a) Procurement plans prepared and filed pursuant to Section 16-111.5 of this Act during the years 2012 through 2015 shall be subject to the following additional requirements:
        (1) The analysis included pursuant to paragraph (2)
    
of subsection (b) of Section 16-111.5 shall also include the impact of energy efficiency building codes or appliance standards, both current and projected.
        (2) The procurement plan components described in
    
subsection (b) of Section 16-111.5 shall also include an assessment of opportunities to expand the programs promoting energy efficiency measures that have been offered under plans approved pursuant to Section 8-103 of this Act or to implement additional cost-effective energy efficiency programs or measures.
        (3) In addition to the information provided pursuant
    
to paragraph (1) of subsection (d) of Section 16-111.5 of this Act, each Illinois utility procuring power pursuant to that Section shall annually provide to the Illinois Power Agency by July 15 of each year, or such other date as may be required by the Commission or Agency, an assessment of cost-effective energy efficiency programs or measures that could be included in the procurement plan. The assessment shall include the following:
            (A) A comprehensive energy efficiency potential
        
study for the utility's service territory that was completed within the past 3 years.
            (B) Beginning in 2014, the most recent analysis
        
submitted pursuant to Section 8-103A of this Act and approved by the Commission under subsection (f) of Section 8-103 of this Act.
            (C) Identification of new or expanded
        
cost-effective energy efficiency programs or measures that are incremental to those included in energy efficiency and demand-response plans approved by the Commission pursuant to Section 8-103 of this Act and that would be offered to all retail customers whose electric service has not been declared competitive under Section 16-113 of this Act and who are eligible to purchase power and energy from the utility under fixed-price bundled service tariffs, regardless of whether such customers actually do purchase such power and energy from the utility.
            (D) Analysis showing that the new or expanded
        
cost-effective energy efficiency programs or measures would lead to a reduction in the overall cost of electric service.
            (E) Analysis of how the cost of procuring
        
additional cost-effective energy efficiency measures compares over the life of the measures to the prevailing cost of comparable supply.
            (F) An energy savings goal, expressed in
        
megawatt-hours, for the year in which the measures will be implemented.
            (G) For each expanded or new program, the
        
estimated amount that the program may reduce the agency's need to procure supply.
        In preparing such assessments, a utility shall
    
conduct an annual solicitation process for purposes of requesting proposals from third-party vendors, the results of which shall be provided to the Agency as part of the assessment, including documentation of all bids received. The utility shall develop requests for proposals consistent with the manner in which it develops requests for proposals under plans approved pursuant to Section 8-103 of this Act, which considers input from the Agency and interested stakeholders.
        (4) The Illinois Power Agency shall include in the
    
procurement plan prepared pursuant to paragraph (2) of subsection (d) of Section 16-111.5 of this Act energy efficiency programs and measures it determines are cost-effective and the associated annual energy savings goal included in the annual solicitation process and assessment submitted pursuant to paragraph (3) of this subsection (a).
        (5) Pursuant to paragraph (4) of subsection (d) of
    
Section 16-111.5 of this Act, the Commission shall also approve the energy efficiency programs and measures included in the procurement plan, including the annual energy savings goal, if the Commission determines they fully capture the potential for all achievable cost-effective savings, to the extent practicable, and otherwise satisfy the requirements of Section 8-103 of this Act.
        In the event the Commission approves the procurement
    
of additional energy efficiency, it shall reduce the amount of power to be procured under the procurement plan to reflect the additional energy efficiency and shall direct the utility to undertake the procurement of such energy efficiency, which shall not be subject to the requirements of subsection (e) of Section 16-111.5 of this Act. The utility shall consider input from the Agency and interested stakeholders on the procurement and administration process. The requirements set forth in paragraphs (1) through (5) of this subsection (a) shall terminate after the filing of the procurement plan in 2015, and no energy efficiency shall be procured by the Agency thereafter. Energy efficiency programs approved previously under this Section shall terminate no later than December 31, 2017.
        (6) An electric utility shall recover its costs
    
incurred under this Section related to the implementation of energy efficiency programs and measures approved by the Commission in its order approving the procurement plan under Section 16-111.5 of this Act, including, but not limited to, all costs associated with complying with this Section and all start-up and administrative costs and the costs for any evaluation, measurement, and verification of the measures, from all retail customers whose electric service has not been declared competitive under Section 16-113 of this Act and who are eligible to purchase power and energy from the utility under fixed-price bundled service tariffs, regardless of whether such customers actually do purchase such power and energy from the utility through the automatic adjustment clause tariff established pursuant to Section 8-103 of this Act, provided, however, that the limitations described in subsection (d) of that Section shall not apply to the costs incurred pursuant to this Section or Section 16-111.7 of this Act.
    (b) For purposes of this Section, the term "energy efficiency" shall have the meaning set forth in Section 1-10 of the Illinois Power Agency Act, and the term "cost-effective" shall have the meaning set forth in subsection (a) of Section 8-103 of this Act.
    (c) The changes to this Section made by this amendatory Act of the 99th General Assembly shall not interfere with existing contracts executed under a Commission order entered under this Section.
    (d)(1) For those electric utilities subject to the requirements of Section 8-103B of this Act, the contracts governing the energy efficiency programs and measures approved by the Commission in its order approving the procurement plan for the period June 1, 2016 through May 31, 2017 may be extended through December 31, 2017 so that the energy efficiency programs subject to such contracts and approved in such plan continue to be offered during the period June 1, 2017 through December 31, 2017. Each such utility is authorized to increase, on a pro rata basis, the energy savings goals and budgets approved under this Section to reflect the additional 7 months of implementation of the energy efficiency programs and measures.
    (2) If the Illinois Power Agency filed with the Commission, under Section 16-111.5 of this Act, its proposed procurement plan for the period commencing June 1, 2017, and the Commission has not yet entered its final order approving such plan on or before the effective date of this amendatory Act of the 99th General Assembly, then the Illinois Power Agency shall file a notice of withdrawal with the Commission to withdraw the proposed energy efficiency programs to be approved under such plan. Upon receipt of such notice, the Commission shall enter an order that approves the withdrawal of all proposed energy efficiency programs from the plan. The initially proposed energy efficiency programs shall not be approved or be the subject of any further hearing, investigation, proceeding, or order of any kind.
    (3) This amendatory Act of the 99th General Assembly preempts and supersedes any order entered by the Commission that approved the Illinois Power Agency's procurement plan for the period commencing June 1, 2017, to the extent inconsistent with the provisions of this amendatory Act of the 99th General Assembly. To the extent any such previously entered order approved energy efficiency programs under this Section, the portion of such order approving such programs shall be void, and the provisions of paragraph (1) of this subsection (d) shall apply.
(Source: P.A. 99-906, eff. 6-1-17.)

220 ILCS 5/16-111.6

    (220 ILCS 5/16-111.6)
    Sec. 16-111.6. Termination of utility service to electric space-heating customers. Notwithstanding any other provision of this Act or any other law to the contrary, a public utility that, on December 31, 2005, served more than 100,000 electric customers in Illinois may not, prior to September 1, 2007, terminate electric service to a residential electric space-heating customer for non-payment. For 2007 and every year thereafter, such an electric utility shall not terminate electric service to a residential space-heating customer for non-payment from December 1 through March 31.
(Source: P.A. 95-481, eff. 8-28-07.)

220 ILCS 5/16-111.7

    (220 ILCS 5/16-111.7)
    Sec. 16-111.7. On-bill financing program; electric utilities.
    (a) The Illinois General Assembly finds that Illinois homes and businesses have the potential to save energy through conservation and cost-effective energy efficiency measures. Programs created pursuant to this Section will allow utility customers to purchase cost-effective energy efficiency measures, including measures set forth in a Commission-approved energy efficiency and demand-response plan under Section 8-103 or 8-103B of this Act, with no required initial upfront payment, and to pay the cost of those products and services over time on their utility bill.
    (b) Notwithstanding any other provision of this Act, an electric utility serving more than 100,000 customers on January 1, 2009 shall offer a Commission-approved on-bill financing program ("program") that allows its eligible retail customers, as that term is defined in Section 16-111.5 of this Act, who own a residential single family home, duplex, or other residential building with 4 or less units, or condominium at which the electric service is being provided (i) to borrow funds from a third party lender in order to purchase electric energy efficiency measures approved under the program for installation in such home or condominium without any required upfront payment and (ii) to pay back such funds over time through the electric utility's bill. Based upon the process described in subsection (b-5) of this Section, small commercial customers who own the premises at which electric service is being provided may be included in such program. After receiving a request from an electric utility for approval of a proposed program and tariffs pursuant to this Section, the Commission shall render its decision within 120 days. If no decision is rendered within 120 days, then the request shall be deemed to be approved.
    Beginning no later than December 31, 2013, an electric utility subject to this subsection (b) shall also offer its program to eligible retail customers that own multifamily residential or mixed-use buildings with no more than 50 residential units, provided, however, that such customers must either be a residential customer or small commercial customer and may not use the program in such a way that repayment of the cost of energy efficiency measures is made through tenants' utility bills. An electric utility may impose a per site loan limit not to exceed $150,000. The program, and loans issued thereunder, shall only be offered to customers of the utility that meet the requirements of this Section and that also have an electric service account at the premises where the energy efficiency measures being financed shall be installed. Beginning no later than 2 years after the effective date of this amendatory Act of the 99th General Assembly, the 50 residential unit limitation described in this paragraph shall no longer apply, and the utility shall replace the per site loan limit of $150,000 with a loan limit that correlates to a maximum monthly payment that does not exceed 50% of the customer's average utility bill over the prior 12-month period.
    Beginning no later than 2 years after the effective date of this amendatory Act of the 99th General Assembly, an electric utility subject to this subsection (b) shall also offer its program to eligible retail customers that are Unit Owners' Associations, as defined in subsection (o) of Section 2 of the Condominium Property Act, or Master Associations, as defined in subsection (u) of the Condominium Property Act. However, such customers must either be residential customers or small commercial customers and may not use the program in such a way that repayment of the cost of energy efficiency measures is made through unit owners' utility bills. The program and loans issued under the program shall only be offered to customers of the utility that meet the requirements of this Section and that also have an electric service account at the premises where the energy efficiency measures being financed shall be installed.
    For purposes of this Section, "small commercial customer" means, for an electric utility serving more than 3,000,000 retail customers, those customers having peak demand of less than 100 kilowatts, and, for an electric utility serving less than 3,000,000 retail customers, those customers having peak demand of less than 150 kilowatts; provided, however, that in the event the Commission, after the effective date of this amendatory Act of the 98th General Assembly, approves changes to a utility's tariffs that reflects new or revised demand criteria for the utility's customer rate classifications, then the utility may file a petition with the Commission to revise the applicable definition of a small commercial customer to reflect the new or revised demand criteria for the purposes of this Section. After notice and hearing, the Commission shall enter an order approving, or approving with modification, the revised definition within 60 days after the utility files the petition.
    (b-5) Within 30 days after the effective date of this amendatory Act of the 96th General Assembly, the Commission shall convene a workshop process during which interested participants may discuss issues related to the program, including program design, eligible electric energy efficiency measures, vendor qualifications, and a methodology for ensuring ongoing compliance with such qualifications, financing, sample documents such as request for proposals, contracts and agreements, dispute resolution, pre-installment and post-installment verification, and evaluation. The workshop process shall be completed within 150 days after the effective date of this amendatory Act of the 96th General Assembly.
    (c) Not later than 60 days following completion of the workshop process described in subsection (b-5) of this Section, each electric utility subject to subsection (b) of this Section shall submit a proposed program to the Commission that contains the following components:
        (1) A list of recommended electric energy efficiency
    
measures that will be eligible for on-bill financing. An eligible electric energy efficiency measure ("measure") shall be a product or service for which one or more of the following is true:
            (A) (blank);
            (B) the projected electricity savings (determined
        
by rates in effect at the time of purchase) are sufficient to cover the costs of implementing the measures, including finance charges and any program fees not recovered pursuant to subsection (f) of this Section; or
            (C) the product or service is included in a
        
Commission-approved energy efficiency and demand-response plan under Section 8-103 or 8-103B of this Act.
        (1.5) Beginning no later than 2 years after the
    
effective date of this amendatory Act of the 99th General Assembly, an eligible electric energy efficiency measure (measure) shall be a product or service that qualifies under subparagraph (B) or (C) of paragraph (1) of this subsection (c) or for which one or more of the following is true:
            (A) a building energy assessment, performed by an
        
energy auditor who is certified by the Building Performance Institute or who holds a similar certification, has recommended the product or service as likely to be cost effective over the course of its installed life for the building in which the measure is to be installed; or
            (B) the product or service is necessary to safely
        
or correctly install to code or industry standard an efficiency measure, including, but not limited to, installation work; changes needed to plumbing or electrical connections; upgrades to wiring or fixtures; removal of hazardous materials; correction of leaks; changes to thermostats, controls, or similar devices; and changes to venting or exhaust necessitated by the measure. However, the costs of the product or service described in this subparagraph (B) shall not exceed 25% of the total cost of installing the measure.
        (2) The electric utility shall issue a request for
    
proposals ("RFP") to lenders for purposes of providing financing to participants to pay for approved measures. The RFP criteria shall include, but not be limited to, the interest rate, origination fees, and credit terms. The utility shall select the winning bidders based on its evaluation of these criteria, with a preference for those bids containing the rates, fees, and terms most favorable to participants;
        (3) The utility shall work with the lenders selected
    
pursuant to the RFP process, and with vendors, to establish the terms and processes pursuant to which a participant can purchase eligible electric energy efficiency measures using the financing obtained from the lender. The vendor shall explain and offer the approved financing packaging to those customers identified in subsection (b) of this Section and shall assist customers in applying for financing. As part of the process, vendors shall also provide to participants information about any other incentives that may be available for the measures.
        (4) The lender shall conduct credit checks or
    
undertake other appropriate measures to limit credit risk, and shall review and approve or deny financing applications submitted by customers identified in subsection (b) of this Section. Following the lender's approval of financing and the participant's purchase of the measure or measures, the lender shall forward payment information to the electric utility, and the utility shall add as a separate line item on the participant's utility bill a charge showing the amount due under the program each month.
        (5) A loan issued to a participant pursuant to the
    
program shall be the sole responsibility of the participant, and any dispute that may arise concerning the loan's terms, conditions, or charges shall be resolved between the participant and lender. Upon transfer of the property title for the premises at which the participant receives electric service from the utility or the participant's request to terminate service at such premises, the participant shall pay in full its electric utility bill, including all amounts due under the program, provided that this obligation may be modified as provided in subsection (g) of this Section. Amounts due under the program shall be deemed amounts owed for residential and, as appropriate, small commercial electric service.
        (6) The electric utility shall remit payment in full
    
to the lender each month on behalf of the participant. In the event a participant defaults on payment of its electric utility bill, the electric utility shall continue to remit all payments due under the program to the lender, and the utility shall be entitled to recover all costs related to a participant's nonpayment through the automatic adjustment clause tariff established pursuant to Section 16-111.8 of this Act. In addition, the electric utility shall retain a security interest in the measure or measures purchased under the program, and the utility retains its right to disconnect a participant that defaults on the payment of its utility bill.
        (7) The total outstanding amount financed under the
    
program in this subsection and subsection (c-5) of this Section shall not exceed $2.5 million for an electric utility or electric utilities under a single holding company, provided that the electric utility or electric utilities may petition the Commission for an increase in such amount. Beginning after the effective date of this amendatory Act of the 99th General Assembly, the total maximum outstanding amount financed under the program in this subsection and subsections (c-5) and (c-10) of this Section shall increase by $5,000,000 per year until such time as the total maximum outstanding amount financed reaches $20,000,000. For purposes of this Section, "maximum outstanding amount financed" means the sum of all principal that has been loaned and not yet repaid.
    (c-5) Within 120 days after the effective date of this amendatory Act of the 98th General Assembly, each electric utility subject to the requirements of this Section shall submit an informational filing to the Commission that describes its plan for implementing the provisions of this amendatory Act of the 98th General Assembly on or before December 31, 2013. Such filing shall also describe how the electric utility shall coordinate its program with any gas utility or utilities that provide gas service to buildings within the electric utility's service territory so that it is practical and feasible for the owner of a multifamily building to make a single application to access loans for both gas and electric energy efficiency measures in any individual building.
    (c-10) No later than 365 days after the effective date of this amendatory Act of the 99th General Assembly, each electric utility subject to the requirements of this Section shall submit an informational filing to the Commission that describes its plan for implementing the provisions of this amendatory Act of the 99th General Assembly that were incorporated into this Section. Such filing shall also include the criteria to be used by the program for determining if measures to be financed are eligible electric energy efficiency measures, as defined by paragraph (1.5) of subsection (c) of this Section.
    (d) A program approved by the Commission shall also include the following criteria and guidelines for such program:
        (1) guidelines for financing of measures installed
    
under a program, including, but not limited to, RFP criteria and limits on both individual loan amounts and the duration of the loans;
        (2) criteria and standards for identifying and
    
approving measures;
        (3) qualifications of vendors that will market or
    
install measures, as well as a methodology for ensuring ongoing compliance with such qualifications;
        (4) sample contracts and agreements necessary to
    
implement the measures and program; and
        (5) the types of data and information that utilities
    
and vendors participating in the program shall collect for purposes of preparing the reports required under subsection (g) of this Section.
    (e) The proposed program submitted by each electric utility shall be consistent with the provisions of this Section that define operational, financial and billing arrangements between and among program participants, vendors, lenders, and the electric utility.
    (f) An electric utility shall recover all of the prudently incurred costs of offering a program approved by the Commission pursuant to this Section, including, but not limited to, all start-up and administrative costs and the costs for program evaluation. All prudently incurred costs under this Section shall be recovered from the residential and small commercial retail customer classes eligible to participate in the program through the automatic adjustment clause tariff established pursuant to Section 8-103 or 8-103B of this Act.
    (g) An independent evaluation of a program shall be conducted after 3 years of the program's operation. The electric utility shall retain an independent evaluator who shall evaluate the effects of the measures installed under the program and the overall operation of the program, including, but not limited to, customer eligibility criteria and whether the payment obligation for permanent electric energy efficiency measures that will continue to provide benefits of energy savings should attach to the meter location. As part of the evaluation process, the evaluator shall also solicit feedback from participants and interested stakeholders. The evaluator shall issue a report to the Commission on its findings no later than 4 years after the date on which the program commenced, and the Commission shall issue a report to the Governor and General Assembly including a summary of the information described in this Section as well as its recommendations as to whether the program should be discontinued, continued with modification or modifications or continued without modification, provided that any recommended modifications shall only apply prospectively and to measures not yet installed or financed.
    (h) An electric utility offering a Commission-approved program pursuant to this Section shall not be required to comply with any other statute, order, rule, or regulation of this State that may relate to the offering of such program, provided that nothing in this Section is intended to limit the electric utility's obligation to comply with this Act and the Commission's orders, rules, and regulations, including Part 280 of Title 83 of the Illinois Administrative Code.
    (i) The source of a utility customer's electric supply shall not disqualify a customer from participation in the utility's on-bill financing program. Customers of alternative retail electric suppliers may participate in the program under the same terms and conditions applicable to the utility's supply customers.
(Source: P.A. 98-586, eff. 8-27-13; 99-906, eff. 6-1-17.)

220 ILCS 5/16-111.8

    (220 ILCS 5/16-111.8)
    Sec. 16-111.8. Automatic adjustment clause tariff; uncollectibles.
    (a) An electric utility shall be permitted, at its election, to recover through an automatic adjustment clause tariff the incremental difference between its actual uncollectible amount as set forth in Account 904 in the utility's most recent annual FERC Form 1 and the uncollectible amount included in the utility's rates for the period reported in such annual FERC Form 1. The Commission may, in a proceeding to review a general rate case filed subsequent to the effective date of the tariff established under this Section, prospectively switch from using the actual uncollectible amount set forth in Account 904 to using net write-offs in such tariff, but only if net write-offs are also used to determine the utility's uncollectible amount in rates. In the event the Commission requires such a change, it shall be made effective at the beginning of the first full calendar year after the new rates approved in such proceeding are first placed in effect and an adjustment shall be made, if necessary, to ensure the change does not result in double-recovery or unrecovered uncollectible amounts for any year. For purposes of this Section, "uncollectible amount" means the expense set forth in Account 904 of the utility's FERC Form 1 or cost of net write-offs as appropriate. In the event the utility's rates change during the period of time reported in its most recent annual FERC Form 1, the uncollectible amount included in the utility's rates during such period of time for purposes of this Section will be a weighted average, based on revenues earned during such period by the utility under each set of rates, of the uncollectible amount included in the utility's rates at the beginning of such period and at the end of such period. This difference may either be a charge or a credit to customers depending on whether the uncollectible amount is more or less than the uncollectible amount then included in the utility's rates.
    (b) The tariff may be established outside the context of a general rate case filing and shall specify the terms of any applicable audit. The Commission shall review and by order approve, or approve as modified, the proposed tariff within 180 days after the date on which it is filed. Charges and credits under the tariff shall be allocated to the appropriate customer class or classes. In addition, customers who purchase their electric supply from an alternative retail electric supplier shall not be charged by the utility for uncollectible amounts associated with electric supply provided by the utility to the utility's customers, provided that nothing in this Section is intended to affect or alter the rights and obligations imposed pursuant to Section 16-118 of this Act and any Commission order issued thereunder. Upon approval of the tariff, the utility shall, based on the 2008 FERC Form 1, apply the appropriate credit or charge based on the full year 2008 amounts for the remainder of the 2010 calendar year. Starting with the 2009 FERC Form 1 reporting period and each subsequent period, the utility shall apply the appropriate credit or charge over a 12-month period beginning with the June billing period and ending with the May billing period, with the first such billing period beginning June 2010.
    (c) The approved tariff shall provide that the utility shall file a petition with the Commission annually, no later than August 31st, seeking initiation of an annual review to reconcile all amounts collected with the actual uncollectible amount in the prior period. As part of its review, the Commission shall verify that the utility collects no more and no less than its actual uncollectible amount in each applicable FERC Form 1 reporting period. The Commission shall review the prudence and reasonableness of the utility's actions to pursue minimization and collection of uncollectibles which shall include, at a minimum, the 6 enumerated criteria set forth in this Section. The Commission shall determine any required adjustments and may include suggestions for prospective changes in current practices. Nothing in this Section or the implementing tariffs shall affect or alter the electric utility's existing obligation to pursue collection of uncollectibles or the electric utility's right to disconnect service. A utility that has in effect a tariff authorized by this Section shall pursue minimization of and collection of uncollectibles through the following activities, including, but not limited to:
        (1) identifying customers with late payments;
        (2) contacting the customers in an effort to obtain
    
payment;
        (3) providing delinquent customers with information
    
about possible options, including payment plans and assistance programs;
        (4) serving disconnection notices;
        (5) implementing disconnections based on the level of
    
uncollectibles; and
        (6) pursuing collection activities based on the
    
level of uncollectibles.
    (d) Nothing in this Section shall be construed to require a utility to immediately disconnect service for nonpayment.
(Source: P.A. 96-33, eff. 7-10-09; 96-1000, eff. 7-2-10.)