Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.

Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.

MUNICIPALITIES
(65 ILCS 5/) Illinois Municipal Code.

65 ILCS 5/11-135.5-35

    (65 ILCS 5/11-135.5-35)
    Sec. 11-135.5-35. Revenues; rates; costs; construction contracts.
    (a) Revenue fund. Whenever bonds are issued under this Division, the revenue received from the operation of the properties under the control of the commission shall be set aside as collected and deposited in a separate fund to be used only (1) in paying the cost of the operation and maintenance of those properties, (2) in providing an adequate depreciation fund, (3) in paying the principal of and interest upon the revenue bonds issued by the commission, as provided by this Division, (4) to comply with the covenants of the ordinance or resolution, or the master trust indenture or any applicable supplemental trust indenture or both, authorizing the issuance of such bonds, and (5) to carry out the corporate purposes and powers of the commission.
    (b) Rates and charges for waterworks system. If the commission has charge of the operation of a complete waterworks system, including the distribution mains, the commission shall establish rates and charges for water and the use of commission waterworks system facilities, which shall be sufficient at all times to pay the cost of operation and maintenance, to provide an adequate depreciation fund, to pay the principal of and interest upon all revenue bonds issued as provided by this Division, to comply with the covenants of the ordinance or resolution, or the master trust indenture or any applicable supplemental trust indenture or both, authorizing the issuance of such bonds, and to carry out the corporate purposes and powers of the commission. Charges and rates shall be established, revised, and maintained by ordinance and become payable as the commission may determine by ordinance.
    (c) Rates and charges for water source of supply. If the commission has charge of the operation of a common source of supply of water, the municipalities represented by the commission shall contract with the commission for water. These municipalities shall establish such charges and rates for water supplied by them to consumers as will be sufficient at all times (1) to pay the cost of operation and maintenance of the respective waterworks systems (or combined waterworks and sewerage systems) of the municipalities, (2) to provide an adequate depreciation fund therefor, (3) to pay the principal of and interest on all revenue bonds of the municipalities payable from the revenues of the waterworks system (or combined waterworks and sewerage system), and (4) to pay the charges and rates established by the commission for the sale of water by the commission to, and the use of commission waterworks system facilities by, those municipalities. The commission shall establish such charges and rates for water supplied to those municipalities and the use of commission waterworks system facilities as will be sufficient at all times (1) to pay the cost of operation and maintenance of the common source of supply of water, (2) to provide an adequate depreciation fund therefor, (3) to pay the principal of and interest on the revenue bonds issued by the commission, (4) to comply with the covenants of the ordinance or resolution, or the master trust indenture or any applicable supplemental trust indenture or both, authorizing the issuance of such bonds, and (5) to carry out the corporate purposes and powers of the commission, under the provisions of this Division. Contracts entered into between the commission and the specified municipalities shall include covenants for the establishment of rates and charges as provided in this Section.
    (d) Pension costs. Contributions to a retirement fund or other pension alternative authorized by the Illinois Pension Code, including, without limitation, the Illinois Municipal Retirement Fund, by commissions created under this Division which have been included under the retirement fund or other pension alternative shall be considered a cost of operation and maintenance for the purposes of this Section.
    (e) Enforcement of obligations. An owner of a bond issued under this Division, a trustee under a master trust indenture or supplemental trust indenture or both with respect to the bonds issued under this Division, or both the owner and trustee may, in a civil action, mandamus action, or other proceeding, enforce and compel performance of all duties required by this Division to be performed by such a commission or by any of the municipalities, including the making of rates and charges, the collecting of sufficient revenue, and the application thereof, as provided in this Division.
    (f) Construction contracts. All or any portion of a waterworks system or other public improvement of such a commission, when the expense thereof will exceed the greater of (i) $25,000 or (ii) the amount of expense above which a work or public improvement by a municipality must be let to the lowest responsible bidder after advertising for bids under Section 8-9-1 of this Code, shall be constructed, maintained, or repaired either: (1) by a contract let to the lowest responsible bidder after advertising for bids, in the manner prescribed by the commission's bylaws, rules, and regulations and by the vote required as established in the intergovernmental agreement pursuant to Section 11-135.5-25; or (2) without advertising for bids, if authorized by a vote of greater than a majority of all the commissioners as established in the intergovernmental agreement pursuant to Section 11-135.5-25. The commission's bylaws, rules, and regulations shall provide for an alternative procedure for emergency procurement if an emergency makes it impracticable to follow the procedures in this subsection.
    (g) Alternative project delivery. A commission may use alternative project delivery methods if the commission determines it to be in the commission's best interest for a particular project. An alternative project delivery method may include, without limitation, design-build or construction-manager-at-risk. All notices for the procurement of goods, services, or work to be provided pursuant to an alternate delivery method shall include all requirements for the goods, services, or work to be procured. All awards of contracts or agreements for the procurement of goods, services, or work to be provided pursuant to an alternate delivery method shall be made on the basis of demonstrated competence and qualifications and with due regard for the principles of competitive selection. As part of an alternate project delivery procurement process, prior to submission of proposals, the commission may conduct meetings and exchange confidential information with proposers to promote understanding of the request for proposals, review alternative design concepts, or discuss other issues related to the procurement.
    As used in this subsection:
    "Construction-manager-at-risk" means a delivery method in which the party proposing to be the construction manager commits to be responsible for performance of certain preconstruction services and, if the parties reach agreement on key terms, becomes responsible for construction of the project.
    "Design-build" means a delivery method that provides responsibility within a single contract for furnishing the architectural, engineering, land-surveying, and related services for the project, as well as the labor, materials, equipment, and other construction services for the project.
    (h) Procurement goals and requirements. A commission may establish goals or requirements for the procurement of goods and services and for construction contracts to promote and encourage the continuing economic development of (i) businesses that are owned and operated by minorities, women, persons with disabilities, or veterans; (ii) businesses that are located within the territory of one or more of the municipalities that are members of the commission; (iii) businesses that employ persons who reside in the territory of one or more of the municipalities that are members of the commission; (iv) businesses that are located within the territory of a municipality having more than 2,000,000 inhabitants in which a portion of the commission's waterworks system or other commission improvement is located; or (v) businesses that employ persons who reside in the territory of a municipality having more than 2,000,000 inhabitants in which a portion of the commission's waterworks system or other commission improvement is located.
    A commission may also establish other goals or requirements that result in the award to a responsible bidder other than the lowest responsible bidder if the commission determines that the award is in the commission's best interests, notwithstanding the requirements of subsection (f). Goals or requirements that are set by a commission that result in a preference being applied to a bidder or proposer, who has met those goals or requirements, in a commission's process for awarding construction contracts and for the procurement of goods and services must comply with the constitutional standards applicable to the preferences.
    (i) Contract assignment. A member municipality may enter into a contract for any portion of a waterworks system or other public improvement of a commission pursuant to a contracting method that is consistent with the requirements applicable to the municipality and generally consistent with the principles in subsection (f) or (g). The commission may accept assignment of such a contract and of payment obligations under that contract.
    (j) Project labor agreement. In connection with a contract by a commission for the construction of all or any portion of a waterworks system or other public improvement of the commission, the commission must enter into a project labor agreement with the applicable local building trades council prior to the commencement of any and all construction, building, renovation, demolition, or any material change to the structure or land.
(Source: P.A. 102-684, eff. 12-16-21; 102-1134, eff. 2-10-23.)

65 ILCS 5/11-135.5-40

    (65 ILCS 5/11-135.5-40)
    Sec. 11-135.5-40. Property.
    (a) Generally. A commission may (i) acquire, hold, sell, lease as lessor or lessee, transfer, or dispose of real or personal property, or interest therein, and (ii) acquire by gift, legacy, or grant any real estate or personal property, or rights therein, in all such instances as it deems appropriate in the exercise of its powers for its lawful purposes, whether the land or personal property is located within or outside the boundaries of the members of the commission. The commission also may accept any grant, subsidy, or contribution from the United States, the State of Illinois, a unit of local government, or any other governmental entity, or any combination thereof.
    (b) Private property. Whenever a commission passes an ordinance for the construction or acquisition of any waterworks properties, or improvements or extension or mains, pumping stations, reservoirs, or other appurtenances thereto, which such commission is authorized to make, the making of which will require that private property be taken or damaged, such commission may cause compensation therefor to be ascertained and may condemn and acquire possession thereof in the same manner as nearly as may be, as provided for the exercise of the right of eminent domain under the Eminent Domain Act. However, proceedings to ascertain the compensation to be paid for taking or damaging private property shall be instituted in the circuit court of the county where the property sought to be taken or damaged is situated.
    (c) Public property. When a commission created under this Division requires that public property be taken or damaged for the purposes specified in this Section, the commission may condemn and acquire possession of public property and cause compensation for such public property to be ascertained in the same manner provided for the exercise of the right of eminent domain under the Eminent Domain Act while the commission has the power to initiate action in the manner provided by Article 20 of the Eminent Domain Act.
    (d) Highways and public ground. A commission may construct, maintain, alter, and extend its water mains as a proper use of highways along, upon, under, and across any highway, street, alley, or public ground in the State, including highways within a municipality, but so as not to inconvenience the public use thereof, and the commission may construct, maintain, and operate any conduit or conduits, water pipe or pipes, wholly or partially buried or otherwise in, upon, and along any of the lands owned by the State and under any of the public waters therein. However, the right, permission, and authority hereby created shall be subject to all public rights of commerce and navigation and the authority of the United States in behalf of such public rights and also the laws of the State to regulate and control the same. Notice shall be given to the highway authorities of a municipality, county, township, road district, or township district in which such highway, street, or public way may be situated at least 60 days before any construction or installation work in such highway or street shall commence. All laws and ordinances pertaining to such work for the protection of the public and of public property shall be complied with, except that no fee may be charged such commission for the construction or installation of such facilities in such public places.
    (e) Surplus property. When, in the opinion of a commission, real estate owned by it, however acquired, is no longer necessary, appropriate, required for the use of, profitable to, or for best interest of the commission, such commission may, by resolution, lease such surplus real estate for a period not to exceed 99 years or sell such surplus real estate, in accordance with procedures established in the intergovernmental agreement or bylaws or adopted by resolution by such commission.
    (f) Tax exemption. All property, income, and receipts of or transactions by a commission shall be exempt from all taxation, the same as if it were the property, income, or receipts of or transaction by the member municipalities.
    (g) Agricultural impact mitigation agreement. For any private property that is used for agricultural purposes, as defined in Section 1-60 of the Property Tax Code, that is damaged or taken by a commission created under this Division, the commission shall enter into an agricultural impact mitigation agreement with the Illinois Department of Agriculture to ensure any negative impacts to private property are properly mitigated.
(Source: P.A. 102-684, eff. 12-16-21.)

65 ILCS 5/11-135.5-45

    (65 ILCS 5/11-135.5-45)
    Sec. 11-135.5-45. Laws not applicable. The provisions of this Division: (i) are not subject to Division 135 or Division 136 of Article 11 of this Code or the Water Commission Act of 1985; and (ii) do not apply to any commission formed or operating under Division 135 or Division 136 of Article 11 of this Code or the Water Commission Act of 1985.
(Source: P.A. 102-684, eff. 12-16-21.)

65 ILCS 5/11-135.5-50

    (65 ILCS 5/11-135.5-50)
    Sec. 11-135.5-50. Solicitation of proposals.
    (a) A commission may enter into design-build contracts. In addition to the requirements set forth in its local ordinances, when the commission elects to use the design-build delivery method, it must issue a notice of intent to receive proposals for the project at least 14 days before issuing the request for the proposal. The commission must publish the advance notice in the manner prescribed by ordinance, which shall include posting the advance notice online on its website. The commission may publish the notice in construction industry publications or post the notice on construction industry websites. A brief description of the proposed procurement must be included in the notice. The commission must provide a copy of the request for proposal to any party requesting a copy.
    (b) The request for proposal shall be prepared for each project and must contain, without limitation, the following information:
        (1) The name of the commission.
        (2) A preliminary schedule for the completion of the
    
contract.
        (3) The proposed budget for the project, the source
    
of funds, and the currently available funds at the time the request for proposal is submitted.
        (4) Prequalification criteria for design-build
    
entities wishing to submit proposals. The Commission shall include, at a minimum, its normal prequalification, licensing, registration, and other requirements; however, nothing precludes the use of additional prequalification criteria by the commission.
        (5) Material requirements of the contract, including,
    
but not limited to, the proposed terms and conditions, required performance and payment bonds, and insurance.
        (6) The performance criteria.
        (7) The evaluation criteria for each phase of the
    
solicitation. Price may not be used as a factor in the evaluation of Phase I proposals.
        (8) The number of entities that will be considered
    
for the technical and cost evaluation phase.
    (c) The commission may include any other relevant information that it chooses to supply. The design-build entity shall be entitled to rely upon the accuracy of this documentation in the development of its proposal.
    (d) The date that proposals are due must be at least 21 calendar days after the date of the issuance of the request for proposal. If the cost of the project is estimated to exceed $12,000,000, then the proposal due date must be at least 28 calendar days after the date of the issuance of the request for proposal. The commission shall include in the request for proposal a minimum of 30 days to develop the Phase II submissions after the selection of entities from the Phase I evaluation is completed.
(Source: P.A. 102-1134, eff. 2-10-23.)

65 ILCS 5/11-135.5-55

    (65 ILCS 5/11-135.5-55)
    Sec. 11-135.5-55. Development of scope and performance criteria.
    (a) The commission shall develop, with the assistance of a licensed design professional or public art designer, a request for proposal, which shall include scope and performance criteria. The scope and performance criteria must be in sufficient detail and contain adequate information to reasonably apprise the qualified design-build entities of the commission's overall programmatic needs and goals, including criteria and preliminary design plans, general budget parameters, schedule, and delivery requirements.
    (b) Each request for proposal shall also include a description of the level of design to be provided in the proposals. This description must include the scope and type of renderings, drawings, and specifications that, at a minimum, will be required by the commission to be produced by the design-build entities.
    (c) The scope and performance criteria shall be prepared by a design professional or public art designer who is an employee of the commission, or the commission may contract with an independent design professional or public art designer selected under the Local Government Professional Services Selection Act to provide these services.
    (d) The design professional or public art designer that prepares the scope and performance criteria is prohibited from participating in any design-build entity proposal for the project.
    (e) The design-build contract may be conditioned upon subsequent refinements in scope and price and may allow the commission to make modifications in the project scope without invalidating the design-build contract.
(Source: P.A. 102-1134, eff. 2-10-23.)

65 ILCS 5/11-135.5-60

    (65 ILCS 5/11-135.5-60)
    Sec. 11-135.5-60. Procedures for selection.
    (a) The commission must use a two-phase procedure for the selection of the successful design-build entity. Phase I of the procedure will evaluate and shortlist the design-build entities based on qualifications, and Phase II will evaluate the technical and cost proposals.
    (b) The commission shall include in the request for proposal the evaluating factors to be used in Phase I. These factors are in addition to any prequalification requirements of design-build entities that the commission has set forth. Each request for proposal shall establish the relative importance assigned to each evaluation factor and subfactor, including any weighting of criteria to be employed by the commission. The commission must maintain a record of the evaluation scoring to be disclosed in event of a protest regarding the solicitation.
    The commission shall include the following criteria in every Phase I evaluation of design-build entities: (i) experience of personnel; (ii) successful experience with similar project types; (iii) financial capability; (iv) timeliness of past performance; (v) experience with similarly sized projects; (vi) successful reference checks of the firm; and (vii) commitment to assign personnel for the duration of the project and qualifications of the entity's consultants.
    The commission may include any additional relevant criteria in Phase I that it deems necessary for a proper qualification review. The commission may not consider any design-build entity for evaluation or award if the entity has any pecuniary interest in the project or has other relationships or circumstances, including, but not limited to, long-term leasehold, mutual performance, or development contracts with the commission, that may give the design-build entity a financial or tangible advantage over other design-build entities in the preparation, evaluation, or performance of the design-build contract or that create the appearance of impropriety.
    Upon completion of the qualifications evaluation, the commission shall create a shortlist of the most highly qualified design-build entities. The commission, in its discretion, is not required to shortlist the maximum number of entities as identified for Phase II evaluation, provided that no less than 2 design-build entities nor more than 6 are selected to submit Phase II proposals. The commission shall notify the entities selected for the shortlist in writing. This notification shall commence the period for the preparation of the Phase II technical and cost evaluations. The commission must allow sufficient time for the shortlist entities to prepare their Phase II submittals considering the scope and detail requested by the commission.
    (c) The commission shall include in the request for proposal the evaluating factors to be used in the technical and cost submission components of Phase II. Each request for proposal shall establish, for both the technical and cost submission components of Phase II, the relative importance assigned to each evaluation factor and subfactor, including any weighting of criteria to be employed by the commission. The commission must maintain a record of the evaluation scoring to be disclosed in event of a protest regarding the solicitation.
    The commission shall include the following criteria in every Phase II technical evaluation of design-build entities: (i) compliance with objectives of the project; (ii) compliance of proposed services to the request for proposal requirements; (iii) quality of products or materials proposed; (iv) quality of design parameters; (v) design concepts; (vi) innovation in meeting the scope and performance criteria; and (vii) constructability of the proposed project. The commission may include any additional relevant technical evaluation factors it deems necessary for proper selection.
    The commission shall include the following criteria in every Phase II cost evaluation: the total project cost; the construction costs; and the time of completion. The commission may include any additional relevant technical evaluation factors it deems necessary for proper selection. The total project cost criteria weighting factor shall not exceed 30%.
    The commission shall directly employ or retain a licensed design professional or a public art designer to evaluate the technical and cost submissions to determine if the technical submissions are in accordance with generally accepted industry standards.
    Upon completion of the technical submissions and cost submissions evaluation, the commission may award the design-build contract to the highest overall ranked entity.
(Source: P.A. 102-1134, eff. 2-10-23.)

65 ILCS 5/11-135.5-65

    (65 ILCS 5/11-135.5-65)
    Sec. 11-135.5-65. Small projects. In any case where the total overall cost of the project is estimated to be less than $12,000,000, the commission may combine the two-phase procedure for selection described in Section 11-135.5-60 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 11-135.5-60.
(Source: P.A. 102-1134, eff. 2-10-23.)

65 ILCS 5/11-135.5-70

    (65 ILCS 5/11-135.5-70)
    Sec. 11-135.5-70. Submission of proposals. Proposals must be properly identified and sealed. Proposals may not be reviewed until after the deadline for submission has passed as set forth in the request for proposals. All design-build entities submitting proposals shall be disclosed after the deadline for submission, and all design-build entities who are selected for Phase II evaluation shall also be disclosed at the time of that determination.
    Proposals shall include a bid bond in the form and security as designated in the request for proposals. Proposals shall also contain a separate sealed envelope with the cost information within the overall proposal submission. Proposals shall include a list of all design professionals, public art designers, and other entities to which any work may be subcontracted during the performance of the contract.
    Proposals must meet all material requirements of the request for proposal or they may be rejected as non-responsive. The commission has the right to reject any and all proposals.
    The drawings and specifications of the proposal may remain the property of the design-build entity.
    The commission shall review the proposals for compliance with the performance criteria and evaluation factors.
    Proposals may be withdrawn prior to evaluation for any cause. After evaluation begins by the commission, clear and convincing evidence of error is required for withdrawal.
(Source: P.A. 102-1134, eff. 2-10-23.)

65 ILCS 5/11-135.5-75

    (65 ILCS 5/11-135.5-75)
    Sec. 11-135.5-75. Award; performance. The commission may award the contract to the highest overall ranked entity. Notice of award shall be made in writing. Unsuccessful entities shall also be notified in writing. The commission may not request a best and final offer after the receipt of proposals. The commission may negotiate with the selected design-build entity after award but prior to contract execution for the purpose of securing better terms than originally proposed, provided that the salient features of the request for proposal are not diminished.
    A design-build entity and associated design professionals shall conduct themselves in accordance with the relevant laws of this State and the related provisions of the Illinois Administrative Code.
(Source: P.A. 102-1134, eff. 2-10-23.)

65 ILCS 5/Art. 11 Div. 136

 
    (65 ILCS 5/Art. 11 Div. 136 heading)
DIVISION 136. JOINT ACQUISITION AND OPERATION
OF WATER AND SEWAGE SYSTEMS

65 ILCS 5/11-136-1

    (65 ILCS 5/11-136-1) (from Ch. 24, par. 11-136-1)
    Sec. 11-136-1. Any 2 or more municipalities, except cities of 500,000 or more inhabitants, may acquire either by purchase or construction a waterworks system or sources of supply of water or sewer systems, or any combination thereof, and may operate jointly a waterworks system or sources of supply of water or sewer systems, or any combination thereof, and improve and extend the same, as provided in this Division 136. The corporate authorities of such municipalities desiring to avail themselves of the provisions of this Division 136 shall adopt a resolution or ordinance determining and electing to acquire and operate jointly a waterworks system or sources of supply of water or sewer systems, or any combination thereof, as the case may be. This Division 136 shall not be construed as limiting, amending or repealing any other laws with respect to joint acquisition and operation of a waterworks system or sources of supply of water or sewer systems, or any combination thereof, but shall be considered as an additional grant of power for the purposes herein set out.
(Source: Laws 1961, p. 576.)

65 ILCS 5/11-136-2

    (65 ILCS 5/11-136-2) (from Ch. 24, par. 11-136-2)
    Sec. 11-136-2. Upon the adoption of such an ordinance or resolution by the corporate authorities of any such municipality, the mayor or president, with the approval of the corporate authorities, shall appoint one commissioner for each 5,000 population, or part thereof. The commissioners so appointed by each of such municipalities, together with a like commissioner appointed by the chairman of the county board of the county in which the municipality having the greatest population is situated, shall constitute a commission and public corporation with the powers and duties specified in this Division 136. The corporate name of the commission shall be "(here insert appropriate name indicative of the area) Water Commission" or "Water and Sewer Commission" and as such the commission may contract and be contracted with, and sue and be sued.
    The commissioners so appointed shall serve for a term of 6 years, or until their successors have been appointed and have qualified. Each commissioner shall be an elector of the municipality for which he acts as commissioner. However, no person shall be eligible for appointment, if he has held an elective office in the state, county or municipality, until one year after the expiration of the term for which he was elected. A commissioner is eligible for reappointment upon the expiration of his term. A vacancy shall be filled for the balance of the unexpired term in the same manner as that prescribed for the appointment of the person who has ceased to hold office. Each commissioner shall receive the same compensation which shall not be more than $1,000 per year. Each commissioner shall furnish a bond for the faithful performance of his official duties. This bond shall not be less than $5,000 and its costs shall be paid by the commission.
    Each commissioner may be removed for any cause for which any other municipal officer may be removed. No commissioner, or employee of the commission, and no mayor, or president, or other member of the corporate authorities, or any employee of any of the municipalities, shall be interested directly or indirectly in any contractor-job of work or materials, or the profits thereof, or services to be performed for or by the commission.
    A violation of any of the foregoing provisions of this section is a Class C misdemeanor. A conviction is cause for the removal of a person from his office or employment. Any member of the commission or any employee thereof who in any manner contributes money, labor, or other valuable thing to any person for election purposes in any election for office in any of the municipalities which are furnished water by the commission is guilty of a Class C misdemeanor.
(Source: P.A. 84-1308.)

65 ILCS 5/11-136-3

    (65 ILCS 5/11-136-3) (from Ch. 24, par. 11-136-3)
    Sec. 11-136-3. Such a commission shall organize by appointing a chairman from its own members and a clerk and treasurer, who need not be commissioners. It shall adopt its own rules of procedure and provide for its meetings. The commission has full and complete supervision, management, and control of the waterworks system, or sources of supply of water, or sewer systems, or combination thereof, as provided in the ordinances or resolutions for acquiring and operating the same, and in their maintenance, operation, and extension. The commission is authorized to contract with the municipalities which established the commission or with any other person, firm or corporation for a supply of water, a sewage treatment plant or any other facilities useful in conducting a water supply and sewage disposal system for a period not exceeding 50 years, and the corporate authorities of those municipalities are authorized to enter into contracts with the commission. The commission is authorized to purchase from any person, firm or corporation or municipal corporation including those making up the commission, any sewer or water properties or sources of supplies and municipalities are hereby authorized to sell such facilities to the commission.
(Source: Laws 1961, p. 576.)