Illinois General Assembly

  Bills & Resolutions  
  Compiled Statutes  
  Public Acts  
  Legislative Reports  
  IL Constitution  
  Legislative Guide  
  Legislative Glossary  

 Search By Number
 (example: HB0001)
Search Tips

Search By Keyword

Illinois Compiled Statutes

 ILCS Listing   Public Acts  Search   Guide   Disclaimer

Information maintained by the Legislative Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.

Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.

50 ILCS 20/20.4

    (50 ILCS 20/20.4)
    (Section scheduled to be repealed on July 1, 2025)
    Sec. 20.4. Development of design-build scope and performance criteria.
    (a) The Commission shall develop, with the assistance of a licensed design professional, a request for proposal, which shall include scope and performance criteria. The scope and performance criteria must be in sufficient detail and contain adequate information to reasonably apprise the qualified design-build entities of the Commission's overall programmatic needs and goals, including criteria and preliminary design plans, general budget parameters, schedule, and delivery requirements.
    (b) Each request for proposal shall also include a description of the level of design to be provided in the proposals. This description must include the scope and type of renderings, drawings, and specifications that, at a minimum, will be required by the Commission to be produced by the design-build entities.
    (c) The scope and performance criteria shall be prepared by a design professional who is an employee of the Commission, or the Commission may contract with an independent design professional selected under the Local Government Professional Services Selection Act (50 ILCS 510/) to provide these services.
    (d) The design professional that prepares the scope and performance criteria is prohibited from participating in any design-build entity proposal for the project.
    (e) This Section is repealed on July 1, 2025; provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, shall remain effective.