(735 ILCS 30/25-7-103.112) (was 735 ILCS 5/7-103.112)
    Sec. 25-7-103.112. Quick-take; Bi-State Development Agency; MetroLink Light Rail System. Quick-take proceedings under Article 20 may be used for a period from September 1, 2003 through September 1, 2004 by the Bi-State Development Agency of the Missouri-Illinois Metropolitan District for station area development, transit oriented development and economic development initiatives in support of the MetroLink Light Rail System, beginning in East St. Louis, Illinois, and terminating at MidAmerica Airport, St. Clair County, Illinois.
(Source: P.A. 93-603, eff. 11-19-03; 94-1055, eff. 1-1-07.)