(50 ILCS 20/20.10)
(Section scheduled to be repealed on June 1, 2013) Sec. 20.10. Small design-build projects. In any case where the total overall cost of the
project is estimated to be less than $12,000,000, the Commission
may combine
the two-phase procedure for design-build selection described in Section 20.5 into one combined
step, provided that all the requirements of evaluation are performed in
accordance with Section 20.5. This Section is repealed 5 years after the effective date of this amendatory Act of the 95th General Assembly.
(Source: P.A. 95-595, eff. 6-1-08.)|