(20 ILCS 627/25)
    Sec. 25. Charging station installations. The installation, maintenance, and repair of an electric vehicle charging station shall comply with the requirements of subsection (a) of Section 16-128 and Section 16-128A of the Public Utilities Act.
(Source: P.A. 97-1128, eff. 8-28-12.)