Full Text of SB0943  93rd General Assembly

SB0943ham003 93RD GENERAL ASSEMBLY

Rep. Jay C. Hoffman

Filed: 5/25/2004

 

 


 

 


 
09300SB0943ham003 LRB093 02999 JAM 51333 a

1
AMENDMENT TO SENATE BILL 0943

2     AMENDMENT NO. ______. Amend Senate Bill 0943 by replacing
3 everything after the enacting clause with the following:
 
4     "Section 1. Short title. This Act may be cited as the
5 Design-Build Procurement Act.
 
6     Section 5. Legislative policy. It is the intent of the
7 General Assembly that the Capital Development Board be allowed
8 to use the design-build delivery method for public projects if
9 it is shown to be in the State's best interest for that
10 particular project. It shall be the policy of the Capital
11 Development Board in the procurement of design-build services
12 to publicly announce all requirements for design-build
13 services and to procure these services on the basis of
14 demonstrated competence and qualifications and with due regard
15 for the principles of competitive selection.
16     The Capital Development Board shall, prior to issuing
17 requests for proposals, promulgate and publish procedures for
18 the solicitation and award of contracts pursuant to this Act.
19     The Capital Development Board shall, for each public
20 project or projects permitted under this Act, make a written
21 determination, including a description as to the particular
22 advantages of the design-build procurement method, that it is
23 in the best interests of this State to enter into a
24 design-build contract for the project or projects. In making

 

 

09300SB0943ham003 - 2 - LRB093 02999 JAM 51333 a

1 that determination, the following factors shall be considered:
2         (1) The probability that the design-build procurement
3     method will be in the best interests of the State by
4     providing a material savings of time or cost over the
5     design-bid-build or other delivery system.
6         (2) The type and size of the project and its
7     suitability to the design-build procurement method.
8         (3) The ability of the State construction agency to
9     define and provide comprehensive scope and performance
10     criteria for the project.
11     The Capital Development Board shall within 15 days after
12 the initial determination provide an advisory copy to the
13 Procurement Policy Board and maintain the full record of
14 determination for 5 years.
 
15     Section 10. Definitions. As used in this Act:
16     "State construction agency" means the Capital Development
17 Board.
18     "Delivery system" means the design and construction
19 approach used to develop and construct a project.
20     "Design-bid-build" means the traditional delivery system
21 used on public projects in this State that incorporates the
22 Architectural, Engineering, and Land Surveying Qualification
23 Based Selection Act (30 ILCS 535/) and the principles of
24 competitive selection in the Illinois Procurement Code (30 ILCS
25 500/).
26     "Design-build" means a delivery system that provides
27 responsibility within a single contract for the furnishing of
28 architecture, engineering, land surveying and related services
29 as required, and the labor, materials, equipment, and other
30 construction services for the project.
31     "Design-build contract" means a contract for a public
32 project under this Act between the State construction agency
33 and a design-build entity to furnish architecture,

 

 

09300SB0943ham003 - 3 - LRB093 02999 JAM 51333 a

1 engineering, land surveying, and related services as required,
2 and to furnish the labor, materials, equipment, and other
3 construction services for the project. The design-build
4 contract may be conditioned upon subsequent refinements in
5 scope and price and may allow the State construction agency to
6 make modifications in the project scope without invalidating
7 the design-build contract.
8     "Design-build entity" means any individual, sole
9 proprietorship, firm, partnership, joint venture, corporation,
10 professional corporation, or other entity that proposes to
11 design and construct any public project under this Act. A
12 design-build entity and associated design-build professionals
13 shall conduct themselves in accordance with the laws of this
14 State and the related provisions of the Illinois Administrative
15 Code, as referenced by the licensed design professionals Acts
16 of this State.
17     "Design professional" means any individual, sole
18 proprietorship, firm, partnership, joint venture, corporation,
19 professional corporation, or other entity that offers services
20 under the Illinois Architecture Practice Act of 1989 (225 ILCS
21 305/), the Professional Engineering Practice Act of 1989 (225
22 ILCS 325/), the Structural Engineering Licensing Act of 1989
23 (225 ILCS 340/), or the Illinois Professional Land Surveyor Act
24 of 1989 (225 ILCS 330/).
25     "Evaluation criteria" means the requirements for the
26 separate phases of the selection process as defined in this Act
27 and may include the specialized experience, technical
28 qualifications and competence, capacity to perform, past
29 performance, experience with similar projects, assignment of
30 personnel to the project, and other appropriate factors. Price
31 may not be used as a factor in the evaluation of Phase I
32 proposals.
33     "Proposal" means the offer to enter into a design-build
34 contract as submitted by a design-build entity in accordance

 

 

09300SB0943ham003 - 4 - LRB093 02999 JAM 51333 a

1 with this Act.
2     "Request for proposal" means the document used by the State
3 construction agency to solicit proposals for a design-build
4 contract.
5     "Scope and performance criteria" means the requirements
6 for the public project, including but not limited to, the
7 intended usage, capacity, size, scope, quality and performance
8 standards, life-cycle costs, and other programmatic criteria
9 that are expressed in performance-oriented and quantifiable
10 specifications and drawings that can be reasonably inferred and
11 are suited to allow a design-build entity to develop a
12 proposal.
 
13     Section 15. Solicitation of proposals.
14     (a) When the State construction agency elects to use the
15 design-build delivery method, it must issue a notice of intent
16 to receive requests for proposals for the project at least 14
17 days before issuing the request for the proposal. The State
18 construction agency must publish the advance notice in the
19 official procurement bulletin of the State or the professional
20 services bulletin of the State construction agency, if any. The
21 agency is encouraged to use publication of the notice in
22 related construction industry service publications. A brief
23 description of the proposed procurement must be included in the
24 notice. The State construction agency must provide a copy of
25 the request for proposal to any party requesting a copy.
26     (b) The request for proposal shall be prepared for each
27 project and must contain, without limitation, the following
28 information:
29         (1) The name of the State construction agency.
30         (2) A preliminary schedule for the completion of the
31     contract.
32         (3) The proposed budget for the project, the source of
33     funds, and the currently available funds at the time the

 

 

09300SB0943ham003 - 5 - LRB093 02999 JAM 51333 a

1     request for proposal is submitted.
2         (4) Prequalification criteria for design-build
3     entities wishing to submit proposals. The State
4     construction agency shall include, at a minimum, its normal
5     prequalification, licensing, registration, and other
6     requirements, but nothing contained herein precludes the
7     use of additional prequalification criteria by the State
8     construction agency.
9         (5) Material requirements of the contract, including
10     but not limited to, the proposed terms and conditions,
11     required performance and payment bonds, insurance,
12     affirmative action, and workforce requirements, if any.
13         (6) The performance criteria.
14         (7) The evaluation criteria for each phase of the
15     solicitation.
16         (8) The number of entities that will be considered for
17     the technical and cost evaluation phase.
18     (c) The State construction agency may include any other
19 relevant information that it chooses to supply. The
20 design-build entity shall be entitled to rely upon the accuracy
21 of this documentation in the development of its proposal.
22     (d) The date that proposals are due must be at least 21
23 calendar days after the date of the issuance of the request for
24 proposal. In the event the cost of the project is estimated to
25 exceed $10 million, then the proposal due date must be at least
26 28 calendar days after the date of the issuance of the request
27 for proposal. The State construction agency shall include in
28 the request for proposal a minimum of 30 days to develop the
29 Phase II submissions after the selection of entities from the
30 Phase I evaluation is completed.
 
31     Section 20. Development of scope and performance criteria.
32     (a) The State construction agency shall develop, with the
33 assistance of a licensed design professional, a request for

 

 

09300SB0943ham003 - 6 - LRB093 02999 JAM 51333 a

1 proposal, which shall include scope and performance criteria.
2 The scope and performance criteria must be in sufficient detail
3 and contain adequate information to reasonably apprise the
4 qualified design-build entities of the State construction
5 agency's overall programmatic needs and goals, including
6 criteria and preliminary design plans, general budget
7 parameters, schedule, and delivery requirements.
8     (b) Each request for proposal shall also include a
9 description of the level of design to be provided in the
10 proposals. This description must include the scope and type of
11 renderings, drawings, and specifications that, at a minimum,
12 will be required by the State construction agency to be
13 produced by the design-build entities.
14     (c) The scope and performance criteria shall be prepared by
15 a design professional who is an employee of the State
16 construction agency, or the State construction agency may
17 contract with an independent design professional selected
18 under the Architectural, Engineering and Land Surveying
19 Qualification Based Selection Act (30 ILCS 535/) to provide
20 these services.
21     (d) The design professional that prepares the scope and
22 performance criteria is prohibited from participating in any
23 design-build entity proposal for the project.
 
24     Section 25. Selection Committee.
25     (a) When the State construction agency elects to use the
26 design-build delivery method, it shall establish a committee to
27 evaluate and select the design-build entity. The committee,
28 under the discretion of the State construction agency, shall
29 consist of 3, 5, or 7 members and shall include at least one
30 licensed design professional and one member of the public. The
31 public member may not be employed or associated with any firm
32 holding a contract with the State construction agency and shall
33 be nominated by design or construction industry associations.

 

 

09300SB0943ham003 - 7 - LRB093 02999 JAM 51333 a

1 The selection committee may be designated for a set term or for
2 the particular project subject to the request for proposal.
3     (b) The members of the selection committee must certify for
4 each request for proposal that no conflict of interest exists
5 between the members and the design-build entities submitting
6 proposals. If a conflict exists, the member must be replaced
7 before any review of proposals.
 
8     Section 30. Procedures for Selection.
9     (a) The State construction agency must use a two-phase
10 procedure for the selection of the successful design-build
11 entity. Phase I of the procedure will evaluate and shortlist
12 the design-build entities based on qualifications, and Phase II
13 will evaluate the technical and cost proposals.
14     (b) The State construction agency shall include in the
15 request for proposal the evaluating factors to be used in Phase
16 I. These factors are in addition to any prequalification
17 requirements of design-build entities that the agency has set
18 forth. Each request for proposal shall establish the relative
19 importance assigned to each evaluation factor and subfactor,
20 including any weighting of criteria to be employed by the State
21 construction agency. The State construction agency must
22 maintain a record of the evaluation scoring to be disclosed in
23 event of a protest regarding the solicitation.
24     The State construction agency shall include the following
25 criteria in every Phase I evaluation of design-build entities:
26 (1) experience of personnel; (2) successful experience with
27 similar project types; (3) financial capability; (4)
28 timeliness of past performance; (5) experience with similarly
29 sized projects; (6) successful reference checks of the firm;
30 and (7) commitment to assign personnel for the duration of the
31 project and qualifications of the entity's consultants. The
32 State construction agency may include any additional relevant
33 criteria in Phase I that it deems necessary for a proper

 

 

09300SB0943ham003 - 8 - LRB093 02999 JAM 51333 a

1 qualification review.
2     The State construction agency may not consider any
3 design-build entity for evaluation or award if the entity has
4 any pecuniary interest in the project or has other
5 relationships or circumstances, including but not limited to,
6 long-term leasehold, mutual performance, or development
7 contracts with the State construction agency, that may give the
8 design-build entity a financial or tangible advantage over
9 other design-build entities in the preparation, evaluation, or
10 performance of the design-build contract or that create the
11 appearance of impropriety.
12     Upon completion of the qualifications evaluation, the
13 State construction agency shall create a shortlist of the most
14 highly qualified design-build entities. The State construction
15 agency, in its discretion, is not required to shortlist the
16 maximum number of entities as identified for Phase II
17 evaluation, provided however, no less than 2 design-build
18 entities nor more than 6 are selected to submit Phase II
19 proposals.
20     The State construction agency shall notify the entities
21 selected for the shortlist in writing. This notification shall
22 commence the period for the preparation of the Phase II
23 technical and cost evaluations. The State construction agency
24 must allow sufficient time for the shortlist entities to
25 prepare their Phase II submittals considering the scope and
26 detail requested by the State agency.
27     (c) The State construction agency shall include in the
28 request for proposal the evaluating factors to be used in the
29 technical and cost submission components of Phase II. Each
30 request for proposal shall establish, for both the technical
31 and cost submission components of Phase II, the relative
32 importance assigned to each evaluation factor and subfactor,
33 including any weighting of criteria to be employed by the State
34 construction agency. The State construction agency must

 

 

09300SB0943ham003 - 9 - LRB093 02999 JAM 51333 a

1 maintain a record of the evaluation scoring to be disclosed in
2 event of a protest regarding the solicitation.
3     The State construction agency shall include the following
4 criteria in every Phase II technical evaluation of design-build
5 entities: (1) compliance with objectives of the project; (2)
6 compliance of proposed services to the request for proposal
7 requirements; (3) quality of products or materials proposed;
8 (4) quality of design parameters; (5) design concepts; (6)
9 innovation in meeting the scope and performance criteria; and
10 (7) constructability of the proposed project. The State
11 construction agency may include any additional relevant
12 technical evaluation factors it deems necessary for proper
13 selection.
14     The State construction agency shall include the following
15 criteria in every Phase II cost evaluation: the total project
16 cost, the construction costs, and the time of completion. The
17 State construction agency may include any additional relevant
18 technical evaluation factors it deems necessary for proper
19 selection. The total project cost criteria weighing factor
20 shall be 25%.
21     The State construction agency shall directly employ or
22 retain a licensed design professional to evaluate the technical
23 and cost submissions to determine if the technical submissions
24 are in accordance with generally accepted industry standards.
25     Upon completion of the technical submissions and cost
26 submissions evaluation, the State construction agency may
27 award the design-build contract to the highest overall ranked
28 entity.
 
29     Section 35. Small projects. In any case where the total
30 overall cost of the project is estimated to be less than $10
31 million, the State construction agency may combine the
32 two-phase procedure for selection described in Section 30 into
33 one combined step, provided that all the requirements of

 

 

09300SB0943ham003 - 10 - LRB093 02999 JAM 51333 a

1 evaluation are performed in accordance with Section 30.
 
2     Section 40. Submission of proposals. Proposals must be
3 properly identified and sealed. Proposals may not be reviewed
4 until after the deadline for submission has passed as set forth
5 in the request for proposals. All design-build entities
6 submitting proposals shall be disclosed after the deadline for
7 submission, and all design-build entities who are selected for
8 Phase II evaluation shall also be disclosed at the time of that
9 determination.
10     Proposals shall include a bid bond in the form and security
11 as designated in the request for proposals. Proposals shall
12 also contain a separate sealed envelope with the cost
13 information within the overall proposal submission. Proposals
14 shall include a list of all design professionals and other
15 entities as defined in Section 30-30 of the Illinois
16 Procurement Code to which any work may be subcontracted during
17 the performance of the contract. Any entity that will perform
18 any of the 5 subdivisions of work defined in Section 30-30 of
19 the Illinois Procurement Code must meet prequalification
20 standards of the State construction agency.
21     Proposals must meet all material requirements of the
22 request for proposal or they may be rejected as non-responsive.
23 The State construction agency shall have the right to reject
24 any and all proposals.
25     The drawings and specifications of the proposal shall
26 remain the property of the design-build entity.
27     The State construction agency shall review the proposals
28 for compliance with the performance criteria and evaluation
29 factors.
30     Proposals may be withdrawn prior to evaluation for any
31 cause. After evaluation begins by the State construction
32 agency, clear and convincing evidence of error is required for
33 withdrawal.
 

 

 

09300SB0943ham003 - 11 - LRB093 02999 JAM 51333 a

1     Section 45. Award. The State construction agency may award
2 the contract to the highest overall ranked entity. Notice of
3 award shall be made in writing. Unsuccessful entities shall
4 also be notified in writing. The State construction agency may
5 not request a best and final offer after the receipt of
6 proposals. The State construction agency may negotiate with the
7 selected design-build entity after award but prior to contract
8 execution for the purpose of securing better terms than
9 originally proposed, provided that the salient features of the
10 request for proposal are not diminished.
 
11     Section 50. Administrative Procedure Act. The Illinois
12 Administrative Procedure Act (5 ILCS 100/) applies to all
13 administrative rules and procedures of the State construction
14 agency under this Act except that nothing herein shall be
15 construed to render any prequalification or other
16 responsibility criteria as a "license" or "licensing" under
17 that Act.
 
18     Section 53. Federal requirements. In the procurement of
19 design-build contracts, the State construction agency shall
20 comply with federal law and regulations and take all necessary
21 steps to adapt their rules, policies, and procedures to remain
22 eligible for federal aid.
 
23     Section 90. The Illinois Procurement Code is amended by
24 changing Section 30-30 as follows:
 
25     (30 ILCS 500/30-30)
26     Sec. 30-30. Contracts in excess of $250,000. For building
27 construction contracts in excess of $250,000, separate
28 specifications shall be prepared for all equipment, labor, and
29 materials in connection with the following 5 subdivisions of

 

 

09300SB0943ham003 - 12 - LRB093 02999 JAM 51333 a

1 the work to be performed:
2         (1) plumbing;
3         (2) heating, piping, refrigeration, and automatic
4     temperature control systems, including the testing and
5     balancing of those systems;
6         (3) ventilating and distribution systems for
7     conditioned air, including the testing and balancing of
8     those systems;
9         (4) electric wiring; and
10         (5) general contract work.
11     The specifications must be so drawn as to permit separate
12 and independent bidding upon each of the 5 subdivisions of
13 work. All contracts awarded for any part thereof shall award
14 the 5 subdivisions of work separately to responsible and
15 reliable persons, firms, or corporations engaged in these
16 classes of work. The contracts, at the discretion of the
17 construction agency, may be assigned to the successful bidder
18 on the general contract work or to the successful bidder on the
19 subdivision of work designated by the construction agency
20 before the bidding as the prime subdivision of work, provided
21 that all payments will be made directly to the contractors for
22 the 5 subdivisions of work upon compliance with the conditions
23 of the contract. A contract may be let for one or more
24 buildings in any project to the same contractor. The
25 specifications shall require, however, that unless the
26 buildings are identical, a separate price shall be submitted
27 for each building. The contract may be awarded to the lowest
28 responsible bidder for each or all of the buildings included in
29 the specifications.
30     Until a date 2 years after the effective date of this
31 amendatory Act of the 93rd General Assembly, the requirements
32 of this Section do not apply to the construction of an
33 Emergency Operations Center for the Illinois Emergency
34 Management Agency if (i) the majority of the funding for the

 

 

09300SB0943ham003 - 13 - LRB093 02999 JAM 51333 a

1 project is from federal funds, (ii) the bid of the successful
2 bidder identifies the name of the subcontractor, if any, and
3 the bid proposal costs for each of the 5 subdivisions of work
4 set forth in this Section, and (iii) the contract entered into
5 with the successful bidder provides that no identified
6 subcontractor may be terminated without the written consent of
7 the Capital Development Board.
8 (Source: P.A. 90-572, eff. date - See Sec. 99-5.)
 
9     Section 95. Severability. The provisions of this Act are
10 severable under Section 1.31 of the Statute on Statutes.
 
11     Section 99. Effective date. This Act takes effect upon
12 becoming law.".