Illinois General Assembly - Full Text of HB1355
Illinois General Assembly

Previous General Assemblies

Full Text of HB1355  100th General Assembly

HB1355 100TH GENERAL ASSEMBLY


 


 
100TH GENERAL ASSEMBLY
State of Illinois
2017 and 2018
HB1355

 

Introduced , by Rep. Michael J. Madigan

 

SYNOPSIS AS INTRODUCED:
 
220 ILCS 5/9-220.2

    Amends the Public Utilities Act. Makes a technical change in a Section concerning authorization of water and sewer surcharges by the Illinois Commerce Commission.


LRB100 03067 JLS 13072 b

 

 

A BILL FOR

 

HB1355LRB100 03067 JLS 13072 b

1    AN ACT concerning regulation.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 5. The Public Utilities Act is amended by changing
5Section 9-220.2 as follows:
 
6    (220 ILCS 5/9-220.2)
7    Sec. 9-220.2. Water and sewer surcharges authorized.
8    (a) The The Commission may authorize a water or sewer
9utility to file a surcharge which adjusts rates and charges to
10provide for recovery of (i) the cost of purchased water, (ii)
11the cost of purchased sewage treatment service, (iii) other
12costs which fluctuate for reasons beyond the utility's control
13or are difficult to predict, or (iv) costs associated with an
14investment in qualifying infrastructure plant, independent of
15any other matters related to the utility's revenue requirement.
16A surcharge approved under this Section can operate on an
17historical or a prospective basis.
18    (b) For purposes of this Section, "costs associated with an
19investment in qualifying infrastructure plant" include a
20return on the investment in and depreciation expense related to
21plant items or facilities (including, but not limited to,
22replacement mains, meters, services, and hydrants) which (i)
23are not reflected in the rate base used to establish the

 

 

HB1355- 2 -LRB100 03067 JLS 13072 b

1utility's base rates and (ii) are non-revenue producing. For
2purposes of this Section, a "non-revenue producing facility" is
3one that is not constructed or installed for the purpose of
4serving a new customer.
5    (c) On a periodic basis, the Commission shall initiate
6hearings to reconcile amounts collected under each surcharge
7authorized pursuant to this Section with the actual prudently
8incurred costs recoverable for each annual period during which
9the surcharge was in effect.
10(Source: P.A. 91-638, eff. 1-1-00.)