Illinois General Assembly - Bill Status for SB2507
Illinois General Assembly

Previous General Assemblies

 Bill Status of SB2507  97th General Assembly


Short Description:  ELECTRIC UTILITY OUTAGES

Senate Sponsors
Sen. Susan Garrett

Last Action
DateChamber Action
  1/8/2013SenateSession Sine Die

Statutes Amended In Order of Appearance
220 ILCS 5/Art. XXIII heading new
220 ILCS 5/23-101 new
220 ILCS 5/23-105 new
220 ILCS 5/23-110 new
220 ILCS 5/23-115 new
220 ILCS 5/23-120 new
220 ILCS 5/23-125 new
220 ILCS 5/23-130 new


Synopsis As Introduced
Amends the Public Utilities Act. Creates a new Article concerning electrical outages and emergency preparedness for electric utilities. Defines "area outage emergency". Provides that an electric utility must establish an Emergency Operations Center capable of receiving communications from municipalities and counties regarding down power lines or other damage during an area outage emergency. Provides that the failure of an electric utility to implement an emergency management plan or comply with plan provisions shall result in the denial of exemption from paying damages under the Act. Provides that an annual report shall be provided to a municipality or county that includes specified data sets. Provides that an electric utility is responsible for implementing the emergency management protocols and reporting requirements without diminishment of investment into the upgrade and maintenance of the existing system. Provides that the Illinois Commerce Commission shall take into account the performance of an electric utility in implementing emergency management protocols and reporting requirements in future rate increase cases. Provides that failure by the electric utility to implement emergency management protocols and reporting requirements, other specified criteria, or any diminishment of investment into the upgrade and maintenance of the existing system in order to meet the implementation of emergency management protocols and reporting requirements or critical public safety facilities restoration timeframes shall result in a decrease of 100 basis points in the return on equity sought within the future proposed rate increase case. Effective January 1, 2012.

Actions 
DateChamber Action
  10/24/2011SenateFiled with Secretary by Sen. Susan Garrett
  10/24/2011SenateFirst Reading
  10/24/2011SenateReferred to Assignments
  1/24/2012SenateAssigned to Energy
  3/9/2012SenateRule 3-9(a) / Re-referred to Assignments
  1/8/2013SenateSession Sine Die

Back To Top