415 ILCS 5/39  from Ch. 111 1/2, par. 1039

    Amends the Environmental Protection Act. Provides that, before approving, or approving with conditions, an application for a Beneficial Use Determination, the Agency must conduct an evaluation of the prospective owner's or operator's prior experience in waste management operations and clean construction or demolition debris fill operations. Authorizes the Agency to deny an application for a Beneficial Use Determination if the prospective owner or operator, or any employee or officer of the prospective owner or operator, has a history of gross carelessness or incompetence or has repeatedly violated federal, State, or local laws.


LRB098 10484 JDS 40715 b

 

 

A BILL FOR

 

SB1925LRB098 10484 JDS 40715 b

1    AN ACT concerning safety.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 5. The Environmental Protection Act is amended by
5changing Section 39 as follows:
 
6    (415 ILCS 5/39)  (from Ch. 111 1/2, par. 1039)
7    Sec. 39. Issuance of permits; procedures.
8    (a) When the Board has by regulation required a permit for
9the construction, installation, or operation of any type of
10facility, equipment, vehicle, vessel, or aircraft, the
11applicant shall apply to the Agency for such permit and it
12shall be the duty of the Agency to issue such a permit upon
13proof by the applicant that the facility, equipment, vehicle,
14vessel, or aircraft will not cause a violation of this Act or
15of regulations hereunder. The Agency shall adopt such
16procedures as are necessary to carry out its duties under this
17Section. In making its determinations on permit applications
18under this Section the Agency may consider prior adjudications
19of noncompliance with this Act by the applicant that involved a
20release of a contaminant into the environment. In granting
21permits, the Agency may impose reasonable conditions
22specifically related to the applicant's past compliance
23history with this Act as necessary to correct, detect, or

 

 

SB1925- 2 -LRB098 10484 JDS 40715 b

1prevent noncompliance. The Agency may impose such other
2conditions as may be necessary to accomplish the purposes of
3this Act, and as are not inconsistent with the regulations
4promulgated by the Board hereunder. Except as otherwise
5provided in this Act, a bond or other security shall not be
6required as a condition for the issuance of a permit. If the
7Agency denies any permit under this Section, the Agency shall
8transmit to the applicant within the time limitations of this
9Section specific, detailed statements as to the reasons the
10permit application was denied. Such statements shall include,
11but not be limited to the following:
12        (i) the Sections of this Act which may be violated if
13    the permit were granted;
14        (ii) the provision of the regulations, promulgated
15    under this Act, which may be violated if the permit were
16    granted;
17        (iii) the specific type of information, if any, which
18    the Agency deems the applicant did not provide the Agency;
19    and
20        (iv) a statement of specific reasons why the Act and
21    the regulations might not be met if the permit were
22    granted.
23    If there is no final action by the Agency within 90 days
24after the filing of the application for permit, the applicant
25may deem the permit issued; except that this time period shall
26be extended to 180 days when (1) notice and opportunity for

 

 

SB1925- 3 -LRB098 10484 JDS 40715 b

1public hearing are required by State or federal law or
2regulation, (2) the application which was filed is for any
3permit to develop a landfill subject to issuance pursuant to
4this subsection, or (3) the application that was filed is for a
5MSWLF unit required to issue public notice under subsection (p)
6of Section 39. The 90-day and 180-day time periods for the
7Agency to take final action do not apply to NPDES permit
8applications under subsection (b) of this Section, to RCRA
9permit applications under subsection (d) of this Section, or to
10UIC permit applications under subsection (e) of this Section.
11    The Agency shall publish notice of all final permit
12determinations for development permits for MSWLF units and for
13significant permit modifications for lateral expansions for
14existing MSWLF units one time in a newspaper of general
15circulation in the county in which the unit is or is proposed
16to be located.
17    After January 1, 1994 and until July 1, 1998, operating
18permits issued under this Section by the Agency for sources of
19air pollution permitted to emit less than 25 tons per year of
20any combination of regulated air pollutants, as defined in
21Section 39.5 of this Act, shall be required to be renewed only
22upon written request by the Agency consistent with applicable
23provisions of this Act and regulations promulgated hereunder.
24Such operating permits shall expire 180 days after the date of
25such a request. The Board shall revise its regulations for the
26existing State air pollution operating permit program

 

 

SB1925- 4 -LRB098 10484 JDS 40715 b

1consistent with this provision by January 1, 1994.
2    After June 30, 1998, operating permits issued under this
3Section by the Agency for sources of air pollution that are not
4subject to Section 39.5 of this Act and are not required to
5have a federally enforceable State operating permit shall be
6required to be renewed only upon written request by the Agency
7consistent with applicable provisions of this Act and its
8rules. Such operating permits shall expire 180 days after the
9date of such a request. Before July 1, 1998, the Board shall
10revise its rules for the existing State air pollution operating
11permit program consistent with this paragraph and shall adopt
12rules that require a source to demonstrate that it qualifies
13for a permit under this paragraph.
14    (b) The Agency may issue NPDES permits exclusively under
15this subsection for the discharge of contaminants from point
16sources into navigable waters, all as defined in the Federal
17Water Pollution Control Act, as now or hereafter amended,
18within the jurisdiction of the State, or into any well.
19    All NPDES permits shall contain those terms and conditions,
20including but not limited to schedules of compliance, which may
21be required to accomplish the purposes and provisions of this
22Act.
23    The Agency may issue general NPDES permits for discharges
24from categories of point sources which are subject to the same
25permit limitations and conditions. Such general permits may be
26issued without individual applications and shall conform to

 

 

SB1925- 5 -LRB098 10484 JDS 40715 b

1regulations promulgated under Section 402 of the Federal Water
2Pollution Control Act, as now or hereafter amended.
3    The Agency may include, among such conditions, effluent
4limitations and other requirements established under this Act,
5Board regulations, the Federal Water Pollution Control Act, as
6now or hereafter amended, and regulations pursuant thereto, and
7schedules for achieving compliance therewith at the earliest
8reasonable date.
9    The Agency shall adopt filing requirements and procedures
10which are necessary and appropriate for the issuance of NPDES
11permits, and which are consistent with the Act or regulations
12adopted by the Board, and with the Federal Water Pollution
13Control Act, as now or hereafter amended, and regulations
14pursuant thereto.
15    The Agency, subject to any conditions which may be
16prescribed by Board regulations, may issue NPDES permits to
17allow discharges beyond deadlines established by this Act or by
18regulations of the Board without the requirement of a variance,
19subject to the Federal Water Pollution Control Act, as now or
20hereafter amended, and regulations pursuant thereto.
21    (c) Except for those facilities owned or operated by
22sanitary districts organized under the Metropolitan Water
23Reclamation District Act, no permit for the development or
24construction of a new pollution control facility may be granted
25by the Agency unless the applicant submits proof to the Agency
26that the location of the facility has been approved by the

 

 

SB1925- 6 -LRB098 10484 JDS 40715 b

1County Board of the county if in an unincorporated area, or the
2governing body of the municipality when in an incorporated
3area, in which the facility is to be located in accordance with
4Section 39.2 of this Act. For purposes of this subsection (c),
5and for purposes of Section 39.2 of this Act, the appropriate
6county board or governing body of the municipality shall be the
7county board of the county or the governing body of the
8municipality in which the facility is to be located as of the
9date when the application for siting approval is filed.
10    In the event that siting approval granted pursuant to
11Section 39.2 has been transferred to a subsequent owner or
12operator, that subsequent owner or operator may apply to the
13Agency for, and the Agency may grant, a development or
14construction permit for the facility for which local siting
15approval was granted. Upon application to the Agency for a
16development or construction permit by that subsequent owner or
17operator, the permit applicant shall cause written notice of
18the permit application to be served upon the appropriate county
19board or governing body of the municipality that granted siting
20approval for that facility and upon any party to the siting
21proceeding pursuant to which siting approval was granted. In
22that event, the Agency shall conduct an evaluation of the
23subsequent owner or operator's prior experience in waste
24management operations in the manner conducted under subsection
25(i) of Section 39 of this Act.
26    Beginning August 20, 1993, if the pollution control

 

 

SB1925- 7 -LRB098 10484 JDS 40715 b

1facility consists of a hazardous or solid waste disposal
2facility for which the proposed site is located in an
3unincorporated area of a county with a population of less than
4100,000 and includes all or a portion of a parcel of land that
5was, on April 1, 1993, adjacent to a municipality having a
6population of less than 5,000, then the local siting review
7required under this subsection (c) in conjunction with any
8permit applied for after that date shall be performed by the
9governing body of that adjacent municipality rather than the
10county board of the county in which the proposed site is
11located; and for the purposes of that local siting review, any
12references in this Act to the county board shall be deemed to
13mean the governing body of that adjacent municipality;
14provided, however, that the provisions of this paragraph shall
15not apply to any proposed site which was, on April 1, 1993,
16owned in whole or in part by another municipality.
17    In the case of a pollution control facility for which a
18development permit was issued before November 12, 1981, if an
19operating permit has not been issued by the Agency prior to
20August 31, 1989 for any portion of the facility, then the
21Agency may not issue or renew any development permit nor issue
22an original operating permit for any portion of such facility
23unless the applicant has submitted proof to the Agency that the
24location of the facility has been approved by the appropriate
25county board or municipal governing body pursuant to Section
2639.2 of this Act.

 

 

SB1925- 8 -LRB098 10484 JDS 40715 b

1    After January 1, 1994, if a solid waste disposal facility,
2any portion for which an operating permit has been issued by
3the Agency, has not accepted waste disposal for 5 or more
4consecutive calendars years, before that facility may accept
5any new or additional waste for disposal, the owner and
6operator must obtain a new operating permit under this Act for
7that facility unless the owner and operator have applied to the
8Agency for a permit authorizing the temporary suspension of
9waste acceptance. The Agency may not issue a new operation
10permit under this Act for the facility unless the applicant has
11submitted proof to the Agency that the location of the facility
12has been approved or re-approved by the appropriate county
13board or municipal governing body under Section 39.2 of this
14Act after the facility ceased accepting waste.
15    Except for those facilities owned or operated by sanitary
16districts organized under the Metropolitan Water Reclamation
17District Act, and except for new pollution control facilities
18governed by Section 39.2, and except for fossil fuel mining
19facilities, the granting of a permit under this Act shall not
20relieve the applicant from meeting and securing all necessary
21zoning approvals from the unit of government having zoning
22jurisdiction over the proposed facility.
23    Before beginning construction on any new sewage treatment
24plant or sludge drying site to be owned or operated by a
25sanitary district organized under the Metropolitan Water
26Reclamation District Act for which a new permit (rather than

 

 

SB1925- 9 -LRB098 10484 JDS 40715 b

1the renewal or amendment of an existing permit) is required,
2such sanitary district shall hold a public hearing within the
3municipality within which the proposed facility is to be
4located, or within the nearest community if the proposed
5facility is to be located within an unincorporated area, at
6which information concerning the proposed facility shall be
7made available to the public, and members of the public shall
8be given the opportunity to express their views concerning the
9proposed facility.
10    The Agency may issue a permit for a municipal waste
11transfer station without requiring approval pursuant to
12Section 39.2 provided that the following demonstration is made:
13        (1) the municipal waste transfer station was in
14    existence on or before January 1, 1979 and was in
15    continuous operation from January 1, 1979 to January 1,
16    1993;
17        (2) the operator submitted a permit application to the
18    Agency to develop and operate the municipal waste transfer
19    station during April of 1994;
20        (3) the operator can demonstrate that the county board
21    of the county, if the municipal waste transfer station is
22    in an unincorporated area, or the governing body of the
23    municipality, if the station is in an incorporated area,
24    does not object to resumption of the operation of the
25    station; and
26        (4) the site has local zoning approval.

 

 

SB1925- 10 -LRB098 10484 JDS 40715 b

1    (d) The Agency may issue RCRA permits exclusively under
2this subsection to persons owning or operating a facility for
3the treatment, storage, or disposal of hazardous waste as
4defined under this Act.
5    All RCRA permits shall contain those terms and conditions,
6including but not limited to schedules of compliance, which may
7be required to accomplish the purposes and provisions of this
8Act. The Agency may include among such conditions standards and
9other requirements established under this Act, Board
10regulations, the Resource Conservation and Recovery Act of 1976
11(P.L. 94-580), as amended, and regulations pursuant thereto,
12and may include schedules for achieving compliance therewith as
13soon as possible. The Agency shall require that a performance
14bond or other security be provided as a condition for the
15issuance of a RCRA permit.
16    In the case of a permit to operate a hazardous waste or PCB
17incinerator as defined in subsection (k) of Section 44, the
18Agency shall require, as a condition of the permit, that the
19operator of the facility perform such analyses of the waste to
20be incinerated as may be necessary and appropriate to ensure
21the safe operation of the incinerator.
22    The Agency shall adopt filing requirements and procedures
23which are necessary and appropriate for the issuance of RCRA
24permits, and which are consistent with the Act or regulations
25adopted by the Board, and with the Resource Conservation and
26Recovery Act of 1976 (P.L. 94-580), as amended, and regulations

 

 

SB1925- 11 -LRB098 10484 JDS 40715 b

1pursuant thereto.
2    The applicant shall make available to the public for
3inspection all documents submitted by the applicant to the
4Agency in furtherance of an application, with the exception of
5trade secrets, at the office of the county board or governing
6body of the municipality. Such documents may be copied upon
7payment of the actual cost of reproduction during regular
8business hours of the local office. The Agency shall issue a
9written statement concurrent with its grant or denial of the
10permit explaining the basis for its decision.
11    (e) The Agency may issue UIC permits exclusively under this
12subsection to persons owning or operating a facility for the
13underground injection of contaminants as defined under this
14Act.
15    All UIC permits shall contain those terms and conditions,
16including but not limited to schedules of compliance, which may
17be required to accomplish the purposes and provisions of this
18Act. The Agency may include among such conditions standards and
19other requirements established under this Act, Board
20regulations, the Safe Drinking Water Act (P.L. 93-523), as
21amended, and regulations pursuant thereto, and may include
22schedules for achieving compliance therewith. The Agency shall
23require that a performance bond or other security be provided
24as a condition for the issuance of a UIC permit.
25    The Agency shall adopt filing requirements and procedures
26which are necessary and appropriate for the issuance of UIC

 

 

SB1925- 12 -LRB098 10484 JDS 40715 b

1permits, and which are consistent with the Act or regulations
2adopted by the Board, and with the Safe Drinking Water Act
3(P.L. 93-523), as amended, and regulations pursuant thereto.
4    The applicant shall make available to the public for
5inspection, all documents submitted by the applicant to the
6Agency in furtherance of an application, with the exception of
7trade secrets, at the office of the county board or governing
8body of the municipality. Such documents may be copied upon
9payment of the actual cost of reproduction during regular
10business hours of the local office. The Agency shall issue a
11written statement concurrent with its grant or denial of the
12permit explaining the basis for its decision.
13    (f) In making any determination pursuant to Section 9.1 of
14this Act:
15        (1) The Agency shall have authority to make the
16    determination of any question required to be determined by
17    the Clean Air Act, as now or hereafter amended, this Act,
18    or the regulations of the Board, including the
19    determination of the Lowest Achievable Emission Rate,
20    Maximum Achievable Control Technology, or Best Available
21    Control Technology, consistent with the Board's
22    regulations, if any.
23        (2) The Agency shall, after conferring with the
24    applicant, give written notice to the applicant of its
25    proposed decision on the application including the terms
26    and conditions of the permit to be issued and the facts,

 

 

SB1925- 13 -LRB098 10484 JDS 40715 b

1    conduct or other basis upon which the Agency will rely to
2    support its proposed action.
3        (3) Following such notice, the Agency shall give the
4    applicant an opportunity for a hearing in accordance with
5    the provisions of Sections 10-25 through 10-60 of the
6    Illinois Administrative Procedure Act.
7    (g) The Agency shall include as conditions upon all permits
8issued for hazardous waste disposal sites such restrictions
9upon the future use of such sites as are reasonably necessary
10to protect public health and the environment, including
11permanent prohibition of the use of such sites for purposes
12which may create an unreasonable risk of injury to human health
13or to the environment. After administrative and judicial
14challenges to such restrictions have been exhausted, the Agency
15shall file such restrictions of record in the Office of the
16Recorder of the county in which the hazardous waste disposal
17site is located.
18    (h) A hazardous waste stream may not be deposited in a
19permitted hazardous waste site unless specific authorization
20is obtained from the Agency by the generator and disposal site
21owner and operator for the deposit of that specific hazardous
22waste stream. The Agency may grant specific authorization for
23disposal of hazardous waste streams only after the generator
24has reasonably demonstrated that, considering technological
25feasibility and economic reasonableness, the hazardous waste
26cannot be reasonably recycled for reuse, nor incinerated or

 

 

SB1925- 14 -LRB098 10484 JDS 40715 b

1chemically, physically or biologically treated so as to
2neutralize the hazardous waste and render it nonhazardous. In
3granting authorization under this Section, the Agency may
4impose such conditions as may be necessary to accomplish the
5purposes of the Act and are consistent with this Act and
6regulations promulgated by the Board hereunder. If the Agency
7refuses to grant authorization under this Section, the
8applicant may appeal as if the Agency refused to grant a
9permit, pursuant to the provisions of subsection (a) of Section
1040 of this Act. For purposes of this subsection (h), the term
11"generator" has the meaning given in Section 3.205 of this Act,
12unless: (1) the hazardous waste is treated, incinerated, or
13partially recycled for reuse prior to disposal, in which case
14the last person who treats, incinerates, or partially recycles
15the hazardous waste prior to disposal is the generator; or (2)
16the hazardous waste is from a response action, in which case
17the person performing the response action is the generator.
18This subsection (h) does not apply to any hazardous waste that
19is restricted from land disposal under 35 Ill. Adm. Code 728.
20    (i) Before approving, or approving with conditions, an
21application for a Beneficial Use Determination under Section
2222.54 of this Act or issuing any RCRA permit, any permit for a
23waste storage site, sanitary landfill, waste disposal site,
24waste transfer station, waste treatment facility, waste
25incinerator, or any waste-transportation operation, or any
26permit or interim authorization for a clean construction or

 

 

SB1925- 15 -LRB098 10484 JDS 40715 b

1demolition debris fill operation, the Agency shall conduct an
2evaluation of the prospective owner's or operator's prior
3experience in waste management operations and clean
4construction or demolition debris fill operations. The Agency
5may deny such a permit or application, or deny or revoke an
6interim authorization, if the prospective owner or operator or
7any employee or officer of the prospective owner or operator
8has a history of:
9        (1) repeated violations of federal, State, or local
10    laws, regulations, standards, or ordinances in the
11    operation of waste management facilities or sites, or clean
12    construction or demolition debris fill operation
13    facilities or sites, or asphalt shingle recycling
14    facilities or sites; or
15        (2) conviction in this or another State of any crime
16    which is a felony under the laws of this State, or
17    conviction of a felony in a federal court; or conviction in
18    this or another state or federal court of any of the
19    following crimes: forgery, official misconduct, bribery,
20    perjury, or knowingly submitting false information under
21    any environmental law, regulation, or permit term or
22    condition; or
23        (3) proof of gross carelessness or incompetence in
24    handling, storing, processing, transporting or disposing
25    of waste or clean construction or demolition debris, or
26    proof of gross carelessness or incompetence in using clean

 

 

SB1925- 16 -LRB098 10484 JDS 40715 b

1    construction or demolition debris as fill, or proof of
2    gross carelessness or incompetence in recycling asphalt
3    roofing shingles.
4    (i-5) Before issuing any permit or approving any interim
5authorization for a clean construction or demolition debris
6fill operation in which any ownership interest is transferred
7between January 1, 2005, and the effective date of the
8prohibition set forth in Section 22.52 of this Act, the Agency
9shall conduct an evaluation of the operation if any previous
10activities at the site or facility may have caused or allowed
11contamination of the site. It shall be the responsibility of
12the owner or operator seeking the permit or interim
13authorization to provide to the Agency all of the information
14necessary for the Agency to conduct its evaluation. The Agency
15may deny a permit or interim authorization if previous
16activities at the site may have caused or allowed contamination
17at the site, unless such contamination is authorized under any
18permit issued by the Agency.
19    (j) The issuance under this Act of a permit to engage in
20the surface mining of any resources other than fossil fuels
21shall not relieve the permittee from its duty to comply with
22any applicable local law regulating the commencement, location
23or operation of surface mining facilities.
24    (k) A development permit issued under subsection (a) of
25Section 39 for any facility or site which is required to have a
26permit under subsection (d) of Section 21 shall expire at the

 

 

SB1925- 17 -LRB098 10484 JDS 40715 b

1end of 2 calendar years from the date upon which it was issued,
2unless within that period the applicant has taken action to
3develop the facility or the site. In the event that review of
4the conditions of the development permit is sought pursuant to
5Section 40 or 41, or permittee is prevented from commencing
6development of the facility or site by any other litigation
7beyond the permittee's control, such two-year period shall be
8deemed to begin on the date upon which such review process or
9litigation is concluded.
10    (l) No permit shall be issued by the Agency under this Act
11for construction or operation of any facility or site located
12within the boundaries of any setback zone established pursuant
13to this Act, where such construction or operation is
14prohibited.
15    (m) The Agency may issue permits to persons owning or
16operating a facility for composting landscape waste. In
17granting such permits, the Agency may impose such conditions as
18may be necessary to accomplish the purposes of this Act, and as
19are not inconsistent with applicable regulations promulgated
20by the Board. Except as otherwise provided in this Act, a bond
21or other security shall not be required as a condition for the
22issuance of a permit. If the Agency denies any permit pursuant
23to this subsection, the Agency shall transmit to the applicant
24within the time limitations of this subsection specific,
25detailed statements as to the reasons the permit application
26was denied. Such statements shall include but not be limited to

 

 

SB1925- 18 -LRB098 10484 JDS 40715 b

1the following:
2        (1) the Sections of this Act that may be violated if
3    the permit were granted;
4        (2) the specific regulations promulgated pursuant to
5    this Act that may be violated if the permit were granted;
6        (3) the specific information, if any, the Agency deems
7    the applicant did not provide in its application to the
8    Agency; and
9        (4) a statement of specific reasons why the Act and the
10    regulations might be violated if the permit were granted.
11    If no final action is taken by the Agency within 90 days
12after the filing of the application for permit, the applicant
13may deem the permit issued. Any applicant for a permit may
14waive the 90 day limitation by filing a written statement with
15the Agency.
16    The Agency shall issue permits for such facilities upon
17receipt of an application that includes a legal description of
18the site, a topographic map of the site drawn to the scale of
19200 feet to the inch or larger, a description of the operation,
20including the area served, an estimate of the volume of
21materials to be processed, and documentation that:
22        (1) the facility includes a setback of at least 200
23    feet from the nearest potable water supply well;
24        (2) the facility is located outside the boundary of the
25    10-year floodplain or the site will be floodproofed;
26        (3) the facility is located so as to minimize

 

 

SB1925- 19 -LRB098 10484 JDS 40715 b

1    incompatibility with the character of the surrounding
2    area, including at least a 200 foot setback from any
3    residence, and in the case of a facility that is developed
4    or the permitted composting area of which is expanded after
5    November 17, 1991, the composting area is located at least
6    1/8 mile from the nearest residence (other than a residence
7    located on the same property as the facility);
8        (4) the design of the facility will prevent any compost
9    material from being placed within 5 feet of the water
10    table, will adequately control runoff from the site, and
11    will collect and manage any leachate that is generated on
12    the site;
13        (5) the operation of the facility will include
14    appropriate dust and odor control measures, limitations on
15    operating hours, appropriate noise control measures for
16    shredding, chipping and similar equipment, management
17    procedures for composting, containment and disposal of
18    non-compostable wastes, procedures to be used for
19    terminating operations at the site, and recordkeeping
20    sufficient to document the amount of materials received,
21    composted and otherwise disposed of; and
22        (6) the operation will be conducted in accordance with
23    any applicable rules adopted by the Board.
24    The Agency shall issue renewable permits of not longer than
2510 years in duration for the composting of landscape wastes, as
26defined in Section 3.155 of this Act, based on the above

 

 

SB1925- 20 -LRB098 10484 JDS 40715 b

1requirements.
2    The operator of any facility permitted under this
3subsection (m) must submit a written annual statement to the
4Agency on or before April 1 of each year that includes an
5estimate of the amount of material, in tons, received for
6composting.
7    (n) The Agency shall issue permits jointly with the
8Department of Transportation for the dredging or deposit of
9material in Lake Michigan in accordance with Section 18 of the
10Rivers, Lakes, and Streams Act.
11    (o) (Blank.)
12    (p) (1) Any person submitting an application for a permit
13for a new MSWLF unit or for a lateral expansion under
14subsection (t) of Section 21 of this Act for an existing MSWLF
15unit that has not received and is not subject to local siting
16approval under Section 39.2 of this Act shall publish notice of
17the application in a newspaper of general circulation in the
18county in which the MSWLF unit is or is proposed to be located.
19The notice must be published at least 15 days before submission
20of the permit application to the Agency. The notice shall state
21the name and address of the applicant, the location of the
22MSWLF unit or proposed MSWLF unit, the nature and size of the
23MSWLF unit or proposed MSWLF unit, the nature of the activity
24proposed, the probable life of the proposed activity, the date
25the permit application will be submitted, and a statement that
26persons may file written comments with the Agency concerning

 

 

SB1925- 21 -LRB098 10484 JDS 40715 b

1the permit application within 30 days after the filing of the
2permit application unless the time period to submit comments is
3extended by the Agency.
4    When a permit applicant submits information to the Agency
5to supplement a permit application being reviewed by the
6Agency, the applicant shall not be required to reissue the
7notice under this subsection.
8    (2) The Agency shall accept written comments concerning the
9permit application that are postmarked no later than 30 days
10after the filing of the permit application, unless the time
11period to accept comments is extended by the Agency.
12    (3) Each applicant for a permit described in part (1) of
13this subsection shall file a copy of the permit application
14with the county board or governing body of the municipality in
15which the MSWLF unit is or is proposed to be located at the
16same time the application is submitted to the Agency. The
17permit application filed with the county board or governing
18body of the municipality shall include all documents submitted
19to or to be submitted to the Agency, except trade secrets as
20determined under Section 7.1 of this Act. The permit
21application and other documents on file with the county board
22or governing body of the municipality shall be made available
23for public inspection during regular business hours at the
24office of the county board or the governing body of the
25municipality and may be copied upon payment of the actual cost
26of reproduction.

 

 

SB1925- 22 -LRB098 10484 JDS 40715 b

1    (q) Within 6 months after the effective date of this
2amendatory Act of the 97th General Assembly, the Agency, in
3consultation with the regulated community, shall develop a web
4portal to be posted on its website for the purpose of enhancing
5review and promoting timely issuance of permits required by
6this Act. At a minimum, the Agency shall make the following
7information available on the web portal:
8        (1) Checklists and guidance relating to the completion
9    of permit applications, developed pursuant to subsection
10    (s) of this Section, which may include, but are not limited
11    to, existing instructions for completing the applications
12    and examples of complete applications. As the Agency
13    develops new checklists and develops guidance, it shall
14    supplement the web portal with those materials.
15        (2) Within 2 years after the effective date of this
16    amendatory Act of the 97th General Assembly, permit
17    application forms or portions of permit applications that
18    can be completed and saved electronically, and submitted to
19    the Agency electronically with digital signatures.
20        (3) Within 2 years after the effective date of this
21    amendatory Act of the 97th General Assembly, an online
22    tracking system where an applicant may review the status of
23    its pending application, including the name and contact
24    information of the permit analyst assigned to the
25    application. Until the online tracking system has been
26    developed, the Agency shall post on its website semi-annual

 

 

SB1925- 23 -LRB098 10484 JDS 40715 b

1    permitting efficiency tracking reports that include
2    statistics on the timeframes for Agency action on the
3    following types of permits received after the effective
4    date of this amendatory Act of the 97th General Assembly:
5    air construction permits, new NPDES permits and associated
6    water construction permits, and modifications of major
7    NPDES permits and associated water construction permits.
8    The reports must be posted by February 1 and August 1 each
9    year and shall include:
10            (A) the number of applications received for each
11        type of permit, the number of applications on which the
12        Agency has taken action, and the number of applications
13        still pending; and
14            (B) for those applications where the Agency has not
15        taken action in accordance with the timeframes set
16        forth in this Act, the date the application was
17        received and the reasons for any delays, which may
18        include, but shall not be limited to, (i) the
19        application being inadequate or incomplete, (ii)
20        scientific or technical disagreements with the
21        applicant, USEPA, or other local, state, or federal
22        agencies involved in the permitting approval process,
23        (iii) public opposition to the permit, or (iv) Agency
24        staffing shortages. To the extent practicable, the
25        tracking report shall provide approximate dates when
26        cause for delay was identified by the Agency, when the

 

 

SB1925- 24 -LRB098 10484 JDS 40715 b

1        Agency informed the applicant of the problem leading to
2        the delay, and when the applicant remedied the reason
3        for the delay.
4    (r) Upon the request of the applicant, the Agency shall
5notify the applicant of the permit analyst assigned to the
6application upon its receipt.
7    (s) The Agency is authorized to prepare and distribute
8guidance documents relating to its administration of this
9Section and procedural rules implementing this Section.
10Guidance documents prepared under this subsection shall not be
11considered rules and shall not be subject to the Illinois
12Administrative Procedure Act. Such guidance shall not be
13binding on any party.
14    (t) Except as otherwise prohibited by federal law or
15regulation, any person submitting an application for a permit
16may include with the application suggested permit language for
17Agency consideration. The Agency is not obligated to use the
18suggested language or any portion thereof in its permitting
19decision. If requested by the permit applicant, the Agency
20shall meet with the applicant to discuss the suggested
21language.
22    (u) If requested by the permit applicant, the Agency shall
23provide the permit applicant with a copy of the draft permit
24prior to any public review period.
25    (v) If requested by the permit applicant, the Agency shall
26provide the permit applicant with a copy of the final permit

 

 

SB1925- 25 -LRB098 10484 JDS 40715 b

1prior to its issuance.
2    (w) An air pollution permit shall not be required due to
3emissions of greenhouse gases, as specified by Section 9.15 of
4this Act.
5(Source: P.A. 97-95, eff. 7-12-11.)