Sen. Thomas Cullerton

Filed: 2/27/2018

 

 


 

 


 
10000SB0272sam001LRB100 05194 MJP 36674 a

1
AMENDMENT TO SENATE BILL 272

2    AMENDMENT NO. ______. Amend Senate Bill 272 by replacing
3everything after the enacting clause with the following:
 
4    "Section 1. Short title. This Act may be cited as the State
5Facility Water Management Plan Act.
 
6    Section 5. Definitions. As used in this Act:
7    "Department" means the Department of Public Health.
8    "Facility" means a correctional institution or facility as
9defined under Section 3-1-2 of the Unified Code of Corrections,
10a developmental disability facility as defined under Section
111-107 of the Mental Health and Developmental Disabilities Code,
12a mental health facility as defined under Section 1-114 of the
13Mental Health and Developmental Disabilities Code, or a
14State-operated mental health facility as defined under Section
151-114.1 of the Mental Health and Developmental Disabilities
16Code.
 

 

 

10000SB0272sam001- 2 -LRB100 05194 MJP 36674 a

1    Section 10. Water management plan required.
2    (a) Every facility must develop a water management plan
3that includes:
4        (1) the establishment of a water management team;
5        (2) a complete breakdown of the potable water system at
6    the facility and the elements of the water system;
7        (3) identification of potential issues and risks to the
8    potable water system;
9        (4) potential remedies and controls for the issues and
10    risks faced by the potable water system; and
11        (5) how detected problems with the potable water system
12    will be communicated to occupants, employees, and the
13    Department.
14    Each facility shall develop a plan under this Section by
15January 1, 2019.
16    (b) Each facility shall review its water management plan
17annually for effectiveness. A facility shall also review its
18water management plan at any time when one or more of the
19following occurs:
20        (1) Legionella is detected at the facility;
21        (2) any construction, modification, or repair
22    activities that may affect a potable water system at the
23    facility is completed; or
24        (3) any other condition specified by the Department by
25    rule occurs.
 

 

 

10000SB0272sam001- 3 -LRB100 05194 MJP 36674 a

1    Section 15. Legionella sampling; management plan required.
2Each facility shall conduct a Legionella culture sampling and
3develop a management plan for the facility's potable water
4systems by January 1, 2019. The plan developed under this
5Section shall include:
6        (1) provisions requiring Legionella culture sampling
7    annually and at 90-day intervals when Legionella is, or may
8    be, associated with the facility;
9        (2) provisions requiring actions in response to
10    Legionella culture analysis results, including responsive
11    actions, remediation, potential issues, and potential
12    remedies; and
13        (3) any other provisions specified by the Department by
14    rule.
 
15    Section 99. Effective date. This Act takes effect upon
16becoming law.".