TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1800 BONDING AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS


The General Assembly's Illinois Administrative Code database includes only those rulemakings that have been permanently adopted. This menu will point out the Sections on which an emergency rule (valid for a maximum of 150 days, usually until replaced by a permanent rulemaking) exists. The emergency rulemaking is linked through the notation that follows the Section heading in the menu.

View Entire Part

AUTHORITY: Implementing and authorized by the Surface Coal Mining Land Conservation and Reclamation Act [225 ILCS 720].

SOURCE: Adopted at 4 Ill. Reg. 37, p. 1, effective June 1, 1982; amended at 6 Ill. Reg. 1, effective June 1, 1982; codified at 8 Ill. Reg. 9354; amended at 11 Ill. Reg. 7985, effective July 1, 1987; amended at 14 Ill. Reg. 11785, effective January 1, 1991; amended at 17 Ill. Reg. 10916, effective July 1, 1993; amended at 20 Ill. Reg. 1939, effective January 19, 1996; amended at 20 Ill. Reg. 15683, effective December 2, 1996; amended at 22 Ill. Reg. 20157, effective November 5, 1998; emergency amendment at 23 Ill. Reg. 12490, effective September 23, 1999, for a maximum of 150 days; emergency expired February 19, 2000; amended at 24 Ill. Reg. 5898, effective March 21, 2000; amended at 26 Ill. Reg. 4197, effective March 6, 2002; amended at 27 Ill. Reg. 4683, effective March 26, 2003.