TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE C: WATER POLLUTION
CHAPTER II: ENVIRONMENTAL PROTECTION AGENCY
PART 369 PROCEDURES FOR PROVIDING FINANCIAL ASSISTANCE FROM THE WATER POLLUTION CONTROL LOAN PROGRAM UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009
SECTION 369.APPENDIX B LOAN APPLICATION FORM


 

Section 369.APPENDIX B   Loan Application Form

 

Applicant Information

 

L17#

 

 

1.

Legal Name of Applicant:

 

 

2.

Applicant Address:

 

 

 

 

 

 

Project Description:

 

 

 

 

 

 

Federal Taxpayer Identification Number:

 

 

 

Home Rule

Non-Home Rule

3.

Authorized Representative:

 

 

 

 

Name:

 

Title:

 

 

 

Phone:

 

Email:

 

 

4.

Engineer:

 

 

 

 

Name:

 

Firm:

 

 

 

Address:

 

Phone:

 

 

 

 

Email:

 

 

5.

Attorney:

 

 

 

 

Name:

 

Firm:

 

 

 

Address:

 

Phone:

 

 

 

 

Email:

 

 

 

6.         Include detailed construction cost estimate in bid format as part of this application and summarize below:

 

Construction

$

 

$

 

$

Legal/Financial

$

Design Engineering

$

Construction Engineering

$

Other

$

Contingency

$

Total

$

 

7.

Amount requested for loan $

 

8.

Loan repayment period requested (maximum term is 20 years):

 

 

20 Years

 

Other (_____number of years)

9.

List any other proposed sources of funding in addition to loan request:

 

 

Source:

 

Amount:

 

 

Date Available:

 

 

10.

Project Schedule (Indicate "complete" or anticipated date of completion as appropriate)

 

a)

Approved Facilities Planning:

 

 

b)

Plans and Specifications completed and submitted to Illinois EPA:

 

 

 

 

c)

Illinois EPA Permit issued:

 

 

d)

Approved Operation, Maintenance and Replacement Revenue System and Dedicated

 

 

Source of Revenue:

 

 

e)

Advertise for Bids:

 

 

f)

Initiation of Construction:

 

 

g)

Completion of Construction:

 

 

 

 

CERTIFICATION REGARDING PROJECT SITE,

RIGHTS-OF-WAY, EASEMENTS, AND PERMITS

 

1.     The applicant has investigated and ascertained the location of the site or sites, rights-of-way, and easements being provided for the facilities in its application for loan assistance.  In my opinion, the applicant has a sufficient legal interest in the said site or sites, rights-of-way, and easements to permit the building of such facilities thereon and to permit the operation and maintenance of such facilities thereon during the estimated life of the facility by the applicant after the completion of construction.

 

2.     The loan applicant has compiled with the provisions of 49 CFR 24 as required by the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 as amended (42 USC 4601 et seq.).

 

3.     The loan applicant has obtained all the necessary permits as indicated below:

 

Type of Permit

 

Permit Number

 

Date Issued

 

 

 

 

 

Army Corps of Eng. 404

 

 

 

 

 

 

 

 

 

IL Dept. of Trans.

 

 

 

 

 

 

 

 

 

County Highway

 

 

 

 

 

 

 

 

 

Other

 

 

 

 

 

 

 

 

Loan Program Certifications

 

•      Whereas, the application provisions for loans from the Water Pollution Control Loan Program require that the loan applicant provide the following certifications and assurances:

 

The loan applicant hereby agrees to pay all project costs not covered by the loan.  If the project costs provided by the applicant exceed $10,000, please provide the following information:

 

Amount to be provided by applicant $

 

 

Source of funds

 

 

•       The loan applicant hereby certifies that is has analyzed the costs and the financial impacts of the proposed project and that it has the legal, institutional, managerial and financial capability to insure adequate building, operation, maintenance and replacement of the treatment works project.

 

•       The loan applicant hereby certifies that no unlawful or corrupt practice has taken place in the planning or design of the proposed project.

 

•       The loan applicant hereby certifies that it has complied with all applicable State and federal statutory and regulatory requirements in regard to the proposed project.

 

•       The loan applicant hereby certifies that it is not barred from being awarded a contract or subcontract under Section 10.1 of the Illinois Purchasing Act.

 

Certification Regarding Debarment, Suspension and Other Responsibility Matters

 

The prospective participant to the best of its knowledge and belief that it and its principals:

 

a)      Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;

 

b)      Have not within a three year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property.

 

c)      Are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (b) of this certification; and

 

d)      Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default.

 

I understand that a false statement on this certification may be grounds for rejection of this proposal or termination of the award.  In addition, under 18 USC Sec. 1001, a false statement may result in fine of up to $10,000 or imprisonment for up to 5 years, or both.

 

 

INTENT REGARDING NATIONAL FLOOD INSURANCE

 

Whereas application provisions for loans from the Water Pollution Control Loan Program require compliance with the National Flood Insurance Act 1968, as amended, and

 

Whereas the costs of securing and maintaining flood insurance are eligible for loan participation during the approved construction period, and

 

Whereas failure to secure flood insurance for eligible construction located in designated flood hazard areas will cause this construction to become ineligible for loan funds:

 

Now therefore, be it resolved that the

 

of

 

will cooperate and coordinate with the National Flood Insurance Program to acquire and

maintain any flood insurance made available for Project L17#

 

for the entire useful life of the insurable construction pursuant to the Flood Insurance Act of 1968, as amended, and that it will secure said flood insurance for each insurable structure, as soon as said insurance is available and will notify the Illinois Environmental Protection Agency in writing that the National Flood Insurance requirement has been satisfied.

 

 

 

AUTHORIZATION OF A REPRESENTATIVE TO SIGN LOAN DOCUMENTS

 

Whereas, application provisions for loans from the Water Pollution Control Loan Program for

construction of sewage treatment works require that the

 

of

 

 

 

authorize a representative to sign the loan application forms and supporting

documents; therefore, be it resolved by the

 

of

 

 

 

that

 

is hereby authorized to sign all loan

application forms and documents.

 

 

 

 

I,

 

hereby verify that the above information is, to the best of my

knowledge, true and correct.

Date:

 

Signed by:

 

 

 

(Authorized Representative)

 

 

Title:

 

 

 

Attested by:

 

 

 

Financial Information Requirements

 

Prior to issuance of a loan agreement, the applicant must demonstrate to the Agency that it possesses the necessary legal, financial, managerial and institutional capability to construct, operate and maintain the project for the life of the treatment works and to retire the loan in accordance with the schedule to be contained in the loan agreement. The applicant must provide sufficient information for the Agency to determine that the applicant is financially capable and has pledged a dedicated revenue source that is adequate to retire the debt and meet any covenants and requirements in the loan agreement.  This can be accomplished by development and the enactment of a new User Charge System or the demonstration that a system previously approved by the Agency has been adequately maintained, is being enforced and will continue to produce adequate revenues.

 

In order to provide guidance to potential loan recipients, this brief summary of the loan rules, our review procedures, and the information that must be submitted for the Agency's review is being provided along with the attached checklist.

 

Financial Capability

 

The Agency requires that the applicant demonstrate that it has the legal, financial, managerial and institutional capability to construct, operate and maintain the project for the life of the wastewater treatment works and to retire the loan. The applicant must also demonstrate the ability to meet any covenants contained in the loan agreement.

 

The Agency's review will be conducted using items submitted as part of the loan application including our review of the Dedicated Source of Revenue and the User Charge System. In addition, applicants must furnish the last fiscal year's audited financial statements. If we are unable to determine that the applicant is financially capable, the Agency may require additional financial data be submitted.

 

Dedicated Source of Revenue

 

The Agency requires that specific sources of revenue must be dedicated and pledged to make the loan repayments. Prior to the Agency's approval of the dedicated source(s) of revenue, the applicant must demonstrate that the revenue source will generate adequate revenues to make loan repayments for the term of the loan. The term of the loan will be specified in the loan agreement but shall not exceed 20 years from the initiation of operation date contained in the loan agreement. Additional points that must be considered during the development of the dedicated source of revenue are:

 

•      The dedicated source of revenue is usually pledged by the loan applicant in the form of an adopted ordinance that pledges a specific and dedicated source of revenue for repayment of the loan.  The adopted ordinance will in most cases pledge a very stable source of revenue, such as revenues of the system, in the form of a revenue bond.  General obligation and alternate bond ordinances are also acceptable.  

 

•      In the case of revenue bonds, the Agency requires that debt service coverage requirements for the IEPA loan be equal to any outstanding senior debt that is payable from revenues of the system.  If a sewer service charge is used, the sewer rate and rate ordinance must be adopted prior to the first disbursement.  State law requires a 1.25 x coverage test for alternate bonds, and parity revenue bonds must also meet the covenants made to outstanding investors.

 

•      The Agency requires that the applicant furnish a legal opinion concerning the acceptability of the ordinance and other elements of the debt instrument selected for repayment of the loan. This opinion must address the validity and enforceability of the loan recipient's obligations and the absence of conflicts with other agreements, bonds or ordinances.  Retention of bond counsel is optional.

 

User Charge System

 

The applicant's User Charge System must generate adequate revenues to accommodate costs for operation, maintenance and replacement of the treatment works. 

 

If the applicant has a previously approved User Charge System, the Agency will review the system to ascertain that the system was enacted and has been maintained in accordance with the previous approval and will produce adequate revenues for the proposed project.

 

Applicant:

 

L17#:

 

 

 

FINANCIAL INFORMATION CHECKLIST

 

Please answer or submit information indicated, as appropriate.

 

A.

Dedicated source of revenue

 

1.

Home Rule

Non-Home Rule

 

2.

Type of loan instrument

 

 

a.

General Obligation Debt

 

 

b.

Alternate (double barreled) bonds with property tax levy that pledges an

 

 

 

alternate revenue source of

 

 

 

c.

 Water

 Sewer

 Combined System Revenues − Senior Lien

 

 

d.

 Water

 Sewer

 Combined System Revenues − Subordinate Lien

 

3.

Authority of applicant to issue debt

 

 

a.

Home rule powers

 

 

b.

Specific authorizing statute:

 

ILCS

 

 

 

 

c.

Other (specify)

 

 

4.     Copy of certified ordinance authorizing debt must be submitted along with existing ordinances if a subordinate lien is proposed. If this is a subordinate lien, the certified ordinance authorizing debt must have provisions for equivalent accounts and coverage.

 

5.     Signed legal opinion with respect to the validity and enforceability of the applicant's obligations (bond ordinance) and the absence of conflicts with other agreements, bonds or ordinances.

 

6.     A detailed demonstration that the dedicated source of revenue will provide adequate revenues to repay the loan in accordance with the terms of the loan agreement, including meeting any covenants and requirements in the loan agreement.

 

7.     Last fiscal year's audited annual statement.

 

8.     Are other entities substantially benefiting (greater than 5%) from the project?

 

Yes

No

 

9.     Submit copies of any service agreement with any substantial beneficiary.

 

Attached

N/A

 

EITHER

 

B.         User Charge System (assuming that an Agency approved user charge system is not in existence)

 

1.         Submission of a detailed Operation, Maintenance and Replacement (OM&R) budget.

 

2.         Calculations to demonstrate how the rates and surcharges are calculated. The rates should be expressed in cost per unit of usage i.e., 1,000 gallons, 100 cubic feet, pounds of BOD and suspended solids or milligrams per liter of BOD and suspended solids as appropriate.

 

3.         Certified sewer use and rate ordinances.

 

OR

 

C.        Supplemental Review (assuming that an Agency approved User Charge System is in existence)

 

1.         Submit a copy of the Sewer Use Ordinance and User Charge Ordinance originally approved.

 

2.         Submit any amendments made to the ordinances since their approval.

 

3.         Is the User Charge System generating sufficient revenue to recover the Operation, Maintenance and Replacement Costs?       Yes       No

If answered No, what corrective action is being taken?

 

4.         Is the Sewer Use Ordinance being enforced?       Yes       No

If answered No, please explain.

 

5.         Is an annual review of the Wastewater Service Charge being performed?

 Yes       No

 

If answered No, please explain.

 

6.         Will the project result in substantial changes to the costs for Operation, Maintenance and Replacement?       Yes       No

Will the project substantially alter the treatment process?       Yes       No

 

7.         If either question in #6 is answered yes, please submit a proposed budget for the first year OM&R costs and a review of the wastewater service charges, along with appropriate revisions to the rate ordinance.

 

 

I hereby certify that the above information is, to the best of my knowledge, true and accurate.

 

 

 

(Authorized Representative)

 

(Date)

(Clerk)

 

(Date)